| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹63,505.74 (0.27%)Admitted-Finance | ₹2.3 Cr+₹63,505.74 (0.27%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DCN CONSTRUCTION L2 | M K CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00IMPROVEMENTS TO THE ROAD FROM MRL 42 - Erthangal Kammapalli Agaravaram Poongulam Road to Sempalli Jittapalli road via Erikollai , Sanankuttai.KM 0/0-3/0. | |||||
| 2.00 | Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 | 5,400 | sqm | 8 ₹43,200 | 6.4 ₹34,560 Lowest |
| 3.00 | Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4 | 3,706.12 | sqm | 14 ₹51,885.68 | 12 ₹44,473.44 Lowest |
| 4.00Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth ) | |||||
| 5.00 | km 0/000 -3/000 | 3,720.42 | cum | 70 ₹2,60,429.4 | 67.81 ₹2,52,281.68 Lowest |
| 6.00Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Gravel Shoulder) | |||||
| 7.00 | km 0/000 -1/000 | 280.43 | cum | 359.11 ₹1,00,705.22 Lowest | 359.11 ₹1,00,705.22 Lowest |
| 8.00 | km 1/000-2/000 | 281.25 | cum | 359.11 ₹1,00,999.69 Lowest | 359.11 ₹1,00,999.69 Lowest |
| 9.00 | km 2/000-2/290 | 278.77 | cum | 359.15 ₹1,00,120.25 Lowest | 359.15 ₹1,00,120.25 Lowest |
| 10.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
17 Feb 2021, 4:00 pmClosed
The Project Director
The Project Director DRDA, Vellore
Vellore DISTRICT IMPROVEMENTS TO THE ROAD MRL42 Erthangal Kammapalli Agaravaram Poongulam Road to Sempalli, Jittapalli Road via Erikollai, Sanankuttai in Gudiyatham block Package no 26-158 PMGSY III BATCH I /2020-21 Retender
2021_RDTN_106236_1
TN26-158 Gudiyatham
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Vellore DISTRICT IMPROVEMENTS TO THE ROAD MRL42 Erthangal Kammapalli Agaravaram Poongulam Road to Sempalli, Jittapalli Road via Erikollai, Sanankuttai in Gudiyatham block Package no 26-158 PMGSY III BATCH I /2020-21 Retender
5 documents required · 5 mandatory
₹0
₹4.7 L
Yes
DRDA, Vellore
24 Feb 2021
1 Feb 2021
17 Feb 2021
1 Feb 2021
17 Feb 2021
1 Feb 2021
5 Feb 2021
Amount
IMPROVEMENTS TO THE ROAD FROM MRL 42 - Erthangal Kammapalli Agaravaram Poongulam Road to Sempalli Jittapalli road via Erikollai , Sanankuttai.KM 0/0-3/0.
Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201
Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth )
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Gravel Shoulder)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and Laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 Premixed with bituminous binder, transported to site up to lead o 1000m laid over a previously prepared surface with Paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause 504.
Providing and applying Primer Coat with bitumen emulsion (SS –I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/ sqm using mechanical means as per Technical Specification Clause 502.
Providing, laying and rolling of Open Graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a 3 wheel 80-100KN static roller capacity, finished to required level and grades, to be followed by seal coat of Type-A as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A as per Technical Specification Clause 510.
Waterproofing of the compacted sub base / base layer surface by spraying 1kg of terrasil and 1kg of zycobond in the ration of 1:1:200 with potable water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Completed job, finished work to be measured
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and Laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 Premixed with bituminous binder, transported to site up to lead o 1000m laid over a previously prepared surface with Paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause 504.
Providing and applying prime coat with cationic bitumen emulsion (water based) modified with nonotechnology based penetrative reactiv water-soluble organosilane material (forming water clear solution ) qualifying as per the test on prepared surface of granular base including cleaning of road surface and prime coat-mix macle using 100 part cationic bitumen emulsion (grade css-2) and 200 part of nonotechnology solution (1kg terraprime:200liter water(<_1000ppm TDS) and spraying at the rate of 1.35 kg/sqm using mechanical means as per technical specification.
Providing, laying and rolling of Open Graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a 3 wheel 80-100KN static roller capacity, finished to required level and grades, to be followed by seal coat of Type-A as per Technical Specification Clause 508.
Providing and laying seal coat modified with nonotechnology based organosilane reactive aggregate modifier zycothermmaterial qualifying as per the test rate 1kg per 1 ton of binder and sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A as per Technical Specification Clause 510.
providing and fixing of Retro reflectorised cautionary ,mandatory signs,with defination plate made out of high intensity grade prismatic sheeting conforming to IRC -67:2010 & ASTM D 4956-09 , Types IV specification and fixing over 1.5 mm thick aluminium sheet fixed on back support frame of 25 mm x25mmx3 mm mild steel angle and supported on the mild steel angle iron 75 mm x75 mm x 6mm firmly fixed to the ground by means properly designed foundation with M 15 grade cement concrete 45 cm x45 cm x60 cm below ground level ect complete including 7 years warranty for the retro reflective sheeting as per clause 6.9 of IRC 67-2010 specification ( as per MORT & spec. no 801)
providing and fixing name board
providing and fixing logo of PMGSY project
providing and fixing sign board
providing and fixing citizen information board of PMGSY project
providing and fixing maintainance information board of PMGSY project
Octagon board
Circular board
Kilometer Stone Reinforced Cement Concrete M15 grade kilometer stone /local stone of standard design as per IRC:8 fixing in position including painting and printing, etc., as per drawing and Technical Specification Clause 1703
(ii) Ordinary Kilometer Stone (Precast)
iii) 200m Stone (pre-cast)(HM stone)
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause
Foundation Concrete
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical Specification Clause 202.
Body wall cum Parapet
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material disposal of un Reinforced Cement Concrete
Deck Slab
Dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of,masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material disposal of un Reinforced Cement Concrete
Cutstone slab Culvert
CONSTRUCTION OF 1.50 M SPAN RCC SLAB CULVERT AT CH 117m -1 No
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 3.00 M SPAN RCC SLAB CULVERT AT CH.2/298 -1 No
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weekpholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF 3.00 M SPAN RCC SLAB CULVERT AT CH.3/0 -1 No
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(20mm Metal)
Cement concrete 1:1.5:3 mix using 20mm HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges ,centring and shuttering but including curing and shall be finished smooth with cement mortar 1:3,12mm thiock and with kraft paper without claiming extra as directed by the departmental officers complete complying with standrad specifications.
Supplying and fabricating and placing in position MS Steel or Ribbed Tor steel for all Reinforced cement concrete works as per the design given including cost of steel and Binding wire in all floors etc., complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate).the Binding wire shall supplied by the contractor.
Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per Drawing and MORD Technical Specification
Providing and fixing THAR paper for baring between bed black and deck slab.
Providing weekpholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of Gravel,labour for filling,watering and compacting etc., complete complying with standrad specificationsand as directed by the departmental officer.
CONSTRUCTION OF RETAINING WALL AT Ch.1785-1815 (Left Side)
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with approved material.
REACH: Km 0/0-1/0
REACH: Km 1/0-2/0
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
REACH: Km 0/0-1/0
REACH: Km 1/0-2/0
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
REACH: Km 0/0-1/0
REACH: Km 1/0-2/0
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(Below sill)
REACH: Km 0/0-1/0
REACH: Km 1/0-2/0
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(Above sill)
REACH: Km 0/0-1/0
REACH: Km 1/0-2/0
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
REACH: Km 0/0-1/0
REACH: Km 1/0-2/0
Filter media Behind abutment,wing wall and Return wall complete as per Drawing and Technical specification.
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M/S DCN CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .