Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.9 CrAccepted-AOC 42 4 1 DESHMUKH NAGAR JUNI MIDC ROAD GODOLI SATARA | ₹23.9 Cr Quoted ₹23.8 Cr | L-1 | Accepted-AOC accept |
| 2 | L-2₹24.5 Cr+₹67.6 L (2.84%)Rejected-AOC S NO 280 2 A GALO NO 1 2 3 PLOT NO 358 2 MANIK ELITE BARAMATI DIST PUNE 413102 | PUNE | MAHARASHTRA | 413102 | ₹24.5 Cr+₹67.6 L (2.84%) | L-2 | Rejected-AOC reject |
| 3 | Rejected-Technical 13 UTKARSH HOUSING SOCIETY SHARADA NAGAR CHOWK AMBAJOGAI ROAD LATUR 413512 | LATUR | MAHARASHTRA | 413512 | - | - | Rejected-Technical Contractors letter dated - 15/12/2025 the tender has been disqualified due to non-submission of required QR based technical personal bid capacity certificate and remaining painting work quantity as per tender condition no.Annexure-II and Annexure-I |
| 4 | Rejected-Technical 714 714 PLOT NO 19 FLAT NO 102 AYODHYANAGAR PUNE 411007 | PUNE | MAHARASHTRA | 411007 | - | - | Rejected-Technical The tender has been disqualified due to non-submission of required similar work green building certificate and quantity as per tender condition no.Appendix to ITB (4) (ii) and (5) (2) (3) (4) (5) |
| 5 | Rejected-Technical | - | - | Rejected-Technical The tender has been disqualified due to non-submission of required QR based technical personal certificate and green building certificate as per tender condition no.Annexure-II and Appendix to ITB (4) (ii) |
| Sl No | Description | Qty | Unit | Shree Ganesh Construction L1 | AVT INFRASTRUCTURE PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts excetra complete. | 56.12 | Cubic Metre | 417.25 ₹23,416.07 Lowest | 429.68 ₹24,113.64 |
| 2.00 | Dismantling the reinforced cement concrete work 1:2:4 and sorting out the materials such as steel excetra as directed and stacking them within the specified lead as directed excetra complete. | 9.02 | Cubic Metre | 1,593.2 ₹14,370.66 Lowest | 1,641 ₹14,801.82 |
| 3.00 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts excetra complete. | 7 | Number | 171.3 ₹1,199.1 Lowest | 176.44 ₹1,235.08 |
| 4.00 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts excetra complete. | 12.32 | Cubic Metre | 695.05 ₹8,563.02 Lowest | 715.9 ₹8,819.89 |
| 5.00 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts excetra complete. | 35 | Square Metre | 49.4 ₹1,729 Lowest | 50.88 ₹1,780.8 |
| 6.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Mechanical Means | 555.09 | Cubic Metre | 227.3 ₹1,26,171.96 Lowest | 234.12 ₹1,29,957.67 |
| 7.00 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means | 932.3 | Cubic Metre | 249.25 ₹2,32,375.78 Lowest | 256.73 ₹2,39,349.38 |
| 8.00 | Excavation for foundation in hard murum and boulders including removing the excavated materials upto a distance of 50 metre beyond the building area and stacking and spreading as directed dewatering preparing the bed for the foundation and necessary back filling, ramming, watering including shoring the strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means | 701.83 | Cubic Metre | 276.7 ₹1,94,196.36 Lowest | 285 ₹2,00,021.55 |
| 9.00 | Excavation for foundation in soft rock and old cement and lime masonry foundations including removing the excavated materials upto a distance of 50 metre beyond the building area and stacking as directed including dewatering, preparing the bed for the foundation and necessary back filling, with available earth, murum, ramming, watering including shoring and strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means | 230.42 | Cubic Metre | 471.05 ₹1,08,539.34 Lowest | 485.18 ₹1,11,795.18 |
| 10.00 | Excavation for foundation in hard rock by chiselling wedging, line drilling excetra including trimming and levelling the bed, removing the excavated materials upto a distance of 50 metres beyond the building area and stacking as directed, dewatering and back filling with available earth / murum, ramming, watering complete. (Lift upto 1.5 metre) By Mechanical Means | 50 | Cubic Metre | 1,435.1 ₹71,755 Lowest | 1,478.15 ₹73,907.5 |
Tender Value
₹23.9 Cr
EMD Value
₹12.0 L
Closing Date
18 Nov 2025, 5:30 pmClosed
Executive Engineer, P.W. (West) Division,Satara.
Executive Engineer, P.W. (West) Division,Satara, Bandhkam Bhavan, Sadar Bazar, Satara, 415001
CONSTRUCTION OF NEW COURT BUILDING (STILT FLOOR Plus 6 FLOOR) (6 COURT HALL) AT WAI TAL.WAI DIST. SATARA. (CIVIL AND ELECTRICAL WORK)
2025_PWDRP_1239907_1
E-TENDER NOTICE NO. 36 FOR 2025-2026
Open Tender
Civil Works - Buildings
Item Rate
730 days
AT WAI TAL.WAI DIST. SATARA.
As Per B-2 STANDARD BIDDING DOCUMENT Tender Form
7 documents required · 7 mandatory
₹3,540
₹12.0 L
office of the Chief Engineer, P.W.Region, Pune.
27 May 2026
4 Nov 2025
21 Nov 2025
4 Nov 2025
18 Nov 2025
4 Nov 2025
7 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts excetra complete. | 56.12 | Cubic Metre | - | - |
| 2 | Dismantling the reinforced cement concrete work 1:2:4 and sorting out the materials such as steel excetra as directed and stacking them within the specified lead as directed excetra complete. | 9.02 | Cubic Metre | - | - |
| 3 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts excetra complete. | 7 | Number | - | - |
| 4 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts excetra complete. | 12.32 | Cubic Metre | - | - |
| 5 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts excetra complete. | 35 | Square Metre | - | - |
| 6 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Mechanical Means | 555.09 | Cubic Metre | - | - |
| 7 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means | 932.3 | Cubic Metre | - | - |
| 8 | Excavation for foundation in hard murum and boulders including removing the excavated materials upto a distance of 50 metre beyond the building area and stacking and spreading as directed dewatering preparing the bed for the foundation and necessary back filling, ramming, watering including shoring the strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means | 701.83 | Cubic Metre | - | - |
| 9 | Excavation for foundation in soft rock and old cement and lime masonry foundations including removing the excavated materials upto a distance of 50 metre beyond the building area and stacking as directed including dewatering, preparing the bed for the foundation and necessary back filling, with available earth, murum, ramming, watering including shoring and strutting excetra complete. (Lift upto 1.5 metre) By Mechanical Means | 230.42 | Cubic Metre | - | - |
| 10 | Excavation for foundation in hard rock by chiselling wedging, line drilling excetra including trimming and levelling the bed, removing the excavated materials upto a distance of 50 metres beyond the building area and stacking as directed, dewatering and back filling with available earth / murum, ramming, watering complete. (Lift upto 1.5 metre) By Mechanical Means | 50 | Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_2139163.xls
BOQ • 0.94 MB
B_2_36_1_Court_Bldge_Wai_04_11.pdf
Tender Documents • 19.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .