| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-Finance | L1 | Accepted-Finance L1 bid, Hence accepted. | |
| 2 | L2₹16.7 L+₹47,418 (2.92%)Rejected-Finance | L2 | Rejected-Finance L2 bid, Hence rejected. |
Tender Value
₹15.5 L
Closing Date
22 Feb 2021, 2:30 pmClosed
Executive Engineer (civil), ALHW, Rangat Bay
ALHW, Rangat Bay.
Maintenance of residential quarters and other miscellaneous repair works in Type-II Quarter (N/B-21 to 40) in New Colony ALHW at Rangat Bay.
2021_ALHW_616274_1
EEC/RGT/TEND-56/2020-21
Open Tender
Civil Works - Others
Item Rate
60 days
Rangat Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
1 Apr 2021
12 Feb 2021
23 Feb 2021
12 Feb 2021
22 Feb 2021
12 Feb 2021
12 Feb 2021 - 19 Feb 2021
Amount
Earth work in excavation over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth lead up to 50 m and lift up to 1.5 m disposed earth to the levelled and neatly dressed, including cost of all labour charges, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST. All Kinds of soil
Providing and laying in position cement concrete CC 1:3:6 (1 Cement, 3 pulverised stone sand and 6 Stone metal 40mm nominal size) works as directed by the EIC, including cost of cement (OPC Gr-43, IS 8112:1989),pulverised stone sand & stone metal from the approved quarry, screening and washing of both the aggregates,mixing of concrete, conveying and placing the same, consolidation and curing, cost of all other materials, hire charges of mixer machine and vibrator, transportation charges of all materials to work site, all labour charges, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Providing and laying RCC 1:1.5:3 (1 Cement , 1.5 pulverised stone sand and 3 stone chips 20 mm nominal size) works as directed by the EIC, including cost of cement (OPC Gr-43, IS 8112:1989), pulverised stone sand & stone chips from approved quarry, screening and washing of both the aggregates, mixing of concrete, conveying and placing the same, consolidation and curing, cost of all other materials, hire charges of mixer machine and vibrator, transportation charges of all materials to work site, all labour charges, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Providing and fixing Tor steel reinforcement for R.C.C. works including cost of steel rods, cutting, bending, binding and placing in position, cost of G.I. binding wire,cost of transporation charges of all materials to worksite, all labour charges, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Providing form work including centering and shuttering so as to give a rough finish, strutting and propping etc. (Height of propping and centering below supporting floor to ceiling not exceeding 4 m) removal of the same in situ reinforced cement concrete and plain concrete work, including cost of transportation charges of all materials to worksite,all labour charges,cost of minor tools, etc., complete.The rate is inclusive of all consumable items and GST.
Providing and laying in position cement concrete 1:2:4 (1 cement,2 pulverised stone sand and 4 graded stone aggregate 20mm nominal size) works as directed by the EIC, including cost of cement (OPC Gr-43, IS 8112:1989), pulverised stone sand & graded stone aggregate from the approved quarry, screening and washing of both the aggregates,mixing of concrete, conveying and placing the same, consolidation and curing, excluding the cost of centering and shuttering which will be paid separately,but incuding cost of all other materials, transportation charges of all materials to work site,all labour charges, cost of minor tools, etc., complete.The rate is inclusive of all consumable items and GST.
Providing and laying 12 mm thick cement plaster with 1:4 mix (1 Cement, 4 Mainland River sand) including cost of cement, mainland river sand, all labour charges, transportation charges of all materials to work site, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Chipping, removing cracks & plastering the same with 12 mm thick cement plaster of 1:4 mix (1 cement and 4 mainland river sand) including cost of cement(OPC Gr-43,IS 8112:1989), including cost of mainland river sand , all labour charges, curing, transporation charges of all materials to work site, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Providing and fixing PVC Door/Syntax factory made fiber single hung door with shutters and chowkats, all standard fittings (as per I.S.I. specification), including cost of door with all fittings, transportation charges of all materials to worksite, all labour charges, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade. New work (two coats) over and including priming coat with cement primer including cost of all materials, all labour charges,transportation charges of all materials to work site, cost of minor tools, etc., complete.The rate is inclusive of all consumable items and GST.
Providing and fixing 1st quality antiskid Floor tiles (300 x 300mmm, thickness to be specified by the manufacturer) of approved make,laid on 20mm thick bed of cement mortar 1:4 (1 cement, 4 mainland river sand) including pointing the joint with white cement and matching pigment, including cost of all materials, all labour charges,transportation charges of all materials to work site, cost of minor tools, etc., complete. The rate is inclusive of all consumable items and GST.
Providing CC Ramp to the required width all round the building with 7.5 cm thick CC 1:3:6 (1 Cement , 3 pulverized stone sand and 6 stone metal 40 mm nominal size) finished with a neat coat of cement @ 1 Kg/Sqm including cost of cement, cost of pulverized stone sand, stone metals, mixing concrete, placing in position consolidation, curing, all labour charges, cost of all other materials, transportation charges of all materials to work site, hire charges of mixer machine and vibrator, cost of minor tools, etc., complete.The rate is inclusive of all consumable items and GST.
Cleaning jungle,dressing out including cutting , all labour charges, cost of minor tools, etc., complete.The rate is inclusive of all consumable items and GST.
liton paul
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .