Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance 00 HAIDARPUR JAMALPUR ROAD SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | L1 | Admitted-Finance | |
| 2 | L2₹1.4 L+₹5,420 (4.15%)Admitted-Finance 0 BOSE PARK MAHATMA GANDHI ROAD BHAGALPUR BHAGALPUR BHAGALPUR BIHAR 812001 M G PATH BHAGALPUR 812001 | BHAGALPUR | BIHAR | 812001 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s RK ENTERPRISES L1 | KRISHNA SALES CORPORATION L2 |
|---|---|---|---|---|---|
| 1.00 | SITC of 2.0 TR split air conditioners (Hot and Cold) with all accessories (along with outdoor stand) and ambient upper temperature range of >= 54 degree Celsius for cooling with Maximum cooling capacity >= 6500 W and for heating ambient lower temperature range <= 0 degree Celsius with Maximum Heating Capacity >=6000 W having Air Flow Rate >=580 cfm in Rooms of Anesthesia Department with minimum 3 star and of reputed make along with allied accessories i.e. minimum of 10’ of refrigerant pipes and communication cable. Complete job as per site requirement and instructions of Engineer-in-charge and also includes cost of materials, labour charges, transportation charges and all other charges and taxes. | 1 | nos. | 77,970 ₹77,970 | 72,000 ₹72,000 Lowest |
| 2.00 | SITC of Wall mounted stabilizer (AVR) for 02 TR Air conditioners of capacity 5 KVA (input voltage range 90 volts-300 volts) of reputed Make conforming to relevant IS/BIS norms and standards having High Voltage Cut-off (HVC), Low Voltage Cut-off (LVC), Overload Protection, Short Circuit Protection, Surge / Spike Protection, Time Delay Protection and Thermal Protection along with allied accessories complete for installation and commissioning. Complete job as per site requirement and instructions of Engineer-in-charge and also includes cost of materials, labour charges, transportation charges and all other charges and taxes. | 1 | nos. | 13,200 ₹13,200 | 8,500 ₹8,500 Lowest |
| 3.00 | Providing and laying of (using conduits and wire fasteners / cable clips/conduit fasteners) 4 sq mm ISI Marked, FRLS PVC insulated copper conductor cable of standard makes i.e. Havells, Polycab, Finolex, Anchor only conforming to relevant IS/BIS norms and standards for the purpose of connecting air conditioning unit to the electrical power connection via stabilizer. Complete job as per instructions of Engineer-in-charge and site requirements and also includes cost of materials (including clamps, bends/elbows, Tee-bends, thimbles etc.), labour charges, transportation charges and all other charges and taxes. | 80 | rft | 120 ₹9,600 | 65 ₹5,200 Lowest |
| 4.00 | Providing and laying of extra FRLS PVC insulated 2.5 sq mm 4 core communication cable ISI Marked (using conduits and wire fasteners / cable clips/ conduit fasteners) of reputed make i.e. Havells, Polycab, Finolex, Anchor only conforming to relevant IS/BIS norms and standards for the purpose of connecting air conditioning indoor unit to the installed air conditioning outdoor units, as per site requirement and instructions of Engineer-in-charge and also includes cost of materials, labour charges, transportation charges and all other charges and taxes. | 60 | rft | 180 ₹10,800 | 46 ₹2,760 Lowest |
| 5.00 | Providing and fitting of 32A C-curve SPN MCB pre-fitted in a durable metal gang box enclosure for 2 TR Capacity Air conditioners with of standard make i.e. Havells, L&T, Schneider, Siemens only conforming to relevant IS/BIS norms and standards (complete with fittings). Complete job as per site requirement and instructions of Engineer-in-charge and includes cost of materials (including clamps, insulation, etc.), labour charges, transportation charges and all other charges and taxes. | 1 | set | 1,500 ₹1,500 | 750 ₹750 Lowest |
| 6.00 | Providing and laying of PVC drain pipe of size viz. ¾” to collect and transport the drained water from the AC unit to a designated location, considering the specific requirements of the site. The PVC pipes will be installed with appropriate size bends and clamps to ensure proper alignment and secure connections. Job also Includes miscellaneous works Civil works like wall opening to pass ducts & pipes, plastering & refinishing of the same to the original finish as per the site requirements. Complete job as per instructions of Engineer-in-charge and site requirements and includes cost of materials (including clamps, bends/elbows, nipples, Tee-bends, etc.), labour charges, transportation charges and all other charges and taxes. | 60 | rft | 40 ₹2,400 | 28 ₹1,680 Lowest |
| 7.00 | Providing and fitting of extra refrigerant copper pipes viz. 3/8” & 5/8” (one for discharge & second for suction) etc. with proper Insulation conforming to relevant norms and standards. The Cu refrigerant pipes will be installed with appropriate size bends, threaded/brazed joints and clamps as per site requirement to ensure proper alignment and secure connections. Job also Includes miscellaneous works Civil works like wall opening to pass pipes with insulation, plastering & refinishing of the same to the original finish as per the site requirements. Complete job must be as per instructions of Engineer-in-charge and site requirements and includes cost of materials (including clamps, bends/elbows, nipples, Tee-bends, etc.), labour charges, transportation charges and all other charges and taxes. | 60 | ft | 250 ₹15,000 Lowest | 750 ₹45,000 |
Tender Value
₹1.4 L
EMD Value
₹3,000
Closing Date
11 Jun 2026, 4:00 pmClosed
XEN MH DIVISION GMCH JAMMU
XEN MH DIVISION GMCH JAMMU
Supply, Installation, Testing and Commissioning SITC of 2 Ton Split Air Conditioners HOT and COLD in OPD Room No. 6 of the Obstetrics Gynaecology Department along with Allied works at Govt. SMGS Hospital, Jammu.
2026_PWDJK_311386_1
MHDJ/e-NIT 61 of 2026-27
Open Tender
Machineries/ Mechanical Engg Items
Turn-key
10 days
smgs
as per e nit
2 documents required · 2 mandatory
₹200
XEN MH DIVISION GMCH JAMMU
₹3,000
19 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
11 Jun 2026
3 Jun 2026
2 Jun 2026 - 8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SITC of 2.0 TR split air conditioners (Hot and Cold) with all accessories (along with outdoor stand) and ambient upper temperature range of >= 54 degree Celsius for cooling with Maximum cooling capacity >= 6500 W and for heating ambient lower temperature range <= 0 degree Celsius with Maximum Heating Capacity >=6000 W having Air Flow Rate >=580 cfm in Rooms of Anesthesia Department with minimum 3 star and of reputed make along with allied accessories i.e. minimum of 10’ of refrigerant pipes and communication cable. Complete job as per site requirement and instructions of Engineer-in-charge and also includes cost of materials, labour charges, transportation charges and all other charges and taxes. | - | nos. | 100 | - |
| 2 | SITC of Wall mounted stabilizer (AVR) for 02 TR Air conditioners of capacity 5 KVA (input voltage range 90 volts-300 volts) of reputed Make conforming to relevant IS/BIS norms and standards having High Voltage Cut-off (HVC), Low Voltage Cut-off (LVC), Overload Protection, Short Circuit Protection, Surge / Spike Protection, Time Delay Protection and Thermal Protection along with allied accessories complete for installation and commissioning. Complete job as per site requirement and instructions of Engineer-in-charge and also includes cost of materials, labour charges, transportation charges and all other charges and taxes. | - | nos. | 100 | - |
| 3 | Providing and laying of (using conduits and wire fasteners / cable clips/conduit fasteners) 4 sq mm ISI Marked, FRLS PVC insulated copper conductor cable of standard makes i.e. Havells, Polycab, Finolex, Anchor only conforming to relevant IS/BIS norms and standards for the purpose of connecting air conditioning unit to the electrical power connection via stabilizer. Complete job as per instructions of Engineer-in-charge and site requirements and also includes cost of materials (including clamps, bends/elbows, Tee-bends, thimbles etc.), labour charges, transportation charges and all other charges and taxes. | - | rft | 100 | - |
| 4 | Providing and laying of extra FRLS PVC insulated 2.5 sq mm 4 core communication cable ISI Marked (using conduits and wire fasteners / cable clips/ conduit fasteners) of reputed make i.e. Havells, Polycab, Finolex, Anchor only conforming to relevant IS/BIS norms and standards for the purpose of connecting air conditioning indoor unit to the installed air conditioning outdoor units, as per site requirement and instructions of Engineer-in-charge and also includes cost of materials, labour charges, transportation charges and all other charges and taxes. | - | rft | 100 | - |
| 5 | Providing and fitting of 32A C-curve SPN MCB pre-fitted in a durable metal gang box enclosure for 2 TR Capacity Air conditioners with of standard make i.e. Havells, L&T, Schneider, Siemens only conforming to relevant IS/BIS norms and standards (complete with fittings). Complete job as per site requirement and instructions of Engineer-in-charge and includes cost of materials (including clamps, insulation, etc.), labour charges, transportation charges and all other charges and taxes. | - | set | 100 | - |
| 6 | Providing and laying of PVC drain pipe of size viz. ¾” to collect and transport the drained water from the AC unit to a designated location, considering the specific requirements of the site. The PVC pipes will be installed with appropriate size bends and clamps to ensure proper alignment and secure connections. Job also Includes miscellaneous works Civil works like wall opening to pass ducts & pipes, plastering & refinishing of the same to the original finish as per the site requirements. Complete job as per instructions of Engineer-in-charge and site requirements and includes cost of materials (including clamps, bends/elbows, nipples, Tee-bends, etc.), labour charges, transportation charges and all other charges and taxes. | - | rft | 100 | - |
| 7 | Providing and fitting of extra refrigerant copper pipes viz. 3/8” & 5/8” (one for discharge & second for suction) etc. with proper Insulation conforming to relevant norms and standards. The Cu refrigerant pipes will be installed with appropriate size bends, threaded/brazed joints and clamps as per site requirement to ensure proper alignment and secure connections. Job also Includes miscellaneous works Civil works like wall opening to pass pipes with insulation, plastering & refinishing of the same to the original finish as per the site requirements. Complete job must be as per instructions of Engineer-in-charge and site requirements and includes cost of materials (including clamps, bends/elbows, nipples, Tee-bends, etc.), labour charges, transportation charges and all other charges and taxes. | - | ft | 100 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_1008293.xls
BOQ • 0.28 MB
enitTt.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .