Tender Value
₹2.6 L
EMD Value
₹2,700
Closing Date
28 Feb 2023, 2:00 pmClosed
Superintending Engineer/ES/MTPS-I
Superintending Engineer Electrical Systems Mettur Thermal Power Station I Mettur Dam-636406
MTPSI ES Circle EM II Division SD I Rewiring of the Existing aged, worn out wiring and failed per damaged 230 volts single phase plug point boxes at Boiler platforms 0 Mtr to 54 Mtr Areas of Unit I
2023_EB_286519_2
SE / ES /MTPS-I/ EM-II /No 31/2022- 23
Limited
Electrical Works
Works
90 days
MTPS-I/Mettur Dam
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2,700
Yes
4 Mar 2023
22 Feb 2023
1 Mar 2023
22 Feb 2023
28 Feb 2023
22 Feb 2023
22 Feb 2023 - 28 Feb 2023
Amount
Charges for erection of 12x12x7’’ 16 gauge M.S.Junction Box (12Way 16A terminal Connector i.e. each 1 No. per box ) , 6 Way neutral links (each 3 per box), powder coated with providing 2 Nos. 'L' angle by using cutting, welding and drilling.
a) Charges for Laying of new 4C x 16 Sq. mm Aluminum Armoured LT power cable from the newly provided distribution board at ‘0’ Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new 12x12x7’’ M.S.Junction Boxes at 15 Mtr, 7.6 Mtr & ‘0’ Mtr. of unit 1.
b)Charges for Laying of new 4C x 16 Sq. mm Aluminum Armoured LT power cable from the newly provided distribution board at ‘18’ Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new 12x12x7’’ M.S.Junction Boxes at 27.7 Mtr, 24.9 Mtr, 21.6 Mtr & 18 Mtr, of unit 1.
c) Charges for Laying of new 4C x 16 Sq. mm Aluminum Armoured LT power cable from the newly provided distribution boards at ‘34’ Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new 12x12x7’’ 16 gauge M.S.Junction Boxes at 37 Mtr, 34 Mtr & 31.2 Mtr, of unit 1.
d) Charges for Laying of new 4C x 16 Sq. mm Aluminum Armoured LT power cable from the newly provided distribution boards at ‘0’ Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new 12x12x7’’ 16 gauge M.S.Junction Boxes at 54 Mtr, 52 Mtr & 41 Mtr, of unit 1.
Charges for Providing Glanding and termination of the following cable to the junction box 4C x 16 Sq. mm Aluminum Armoured LT UG cable.
Charges for Disconnecting / removing the defective/ damaged 18 MM conduit pipes, 230 volts red & black wires, bends, connectors, etc.. from the existing wiring circuit (lighting supply) fed off by the LDB 30 & LDB-26
Charges for Laying / connecting / clamping the new 25 MM conduit pipes, wires, bends, connectors, junction boxes, with continuous earth wire connection etc. as per requirement in the existing wiring circuit.
Charges for Replacing the defective worn-out 230 volts single phases plug point boxes, defective sockets, ON / OFF switches, metal covers with new spares at the 52 Mtr., 37 Mtr, 34 mtr., 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & in 0 Mtr Boiler platforms of Unit 1 (details of No. of 230 volts single phase plug point boxes to be provided in each floor will be given by the Maintenance Engineer) with earth connection and with hoods on top for the protection of the single phases plug point boxes
Charges for Fixing the support angle by welding at 1 metre interval on the existing column to lay 4C x 16 Sq. mm Aluminum Armoured LT power cable from the newly provided junction box at 31.2 Mtr. boiler platform to the new floor level distribution boards at 52 Mtr., 37 Mtr, 34 mar, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr of unit 1 by fixing of clamps at 1 Mtr. intravel.
.Charges for Fixing the 1”X9’ support angle by welding at 1 metre interval on the existing column to lay 25MM conduit pipes from the newly provided 12x12x7 “ metal junction boxes to the newly provided 230 volts supply boxes at. 52 Mtr., 37 Mtr, 34 mar, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr of unit 1.
Material Cost : Consumables (Insulation tape, screws, Binding materials, Red oxide , thinner, cotton waste etc.,) LUMSUM
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .