| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹12.1 L (5.89%)Admitted-Finance | ₹2.2 Cr+₹12.1 L (5.89%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹24.3 L (11.9%)Admitted-Finance | ₹2.3 Cr+₹24.3 L (11.9%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹30.5 L (14.9%)Admitted-Finance | ₹2.4 Cr+₹30.5 L (14.9%) | L4 | Admitted-Finance |
| 5 | L5₹2.5 Cr+₹40.5 L (19.8%)Admitted-Finance | ₹2.5 Cr+₹40.5 L (19.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PRINCE CONSTRUCTIONS L1 | M/S MARVEL ASSOCIATES L5 | JK CONSTRUCTION CO L7 | M/S MFL INFRASTRUCTURE PVT LTD L4 | Star Structural constructions and company L3 | J.K Engineering Construction Co. L6 | AL-IMRAN INFRATECH L8 | HAFIZ CONSTRUCTION COMPANY PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Building work | |||||||||||
| 1.01 | Design & Construction of 1x17 Mtr Span Steel Plate Girder Double Lane Bridge including construction of road diversion approaches at Tangwani Garoora On Sumbal Bandipora Road on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE).
The job among other things includes designing part to be Vetted by Design Directorate IIT/DIQC/NIT Srinagar including soil investigation, load testing, Dismantling / de-launching of existing baileys bridge, construction of Foundation, Sub-structure, superstructure, (Drainage spouts, wearing Coat, Providing & Fixing of suitable bearings etc) duly approved by the department incl. construction of approaches of required length (as per the directions of Engineer in charge) on each side by way of earth cutting, filling, construction of protection works ie. R/ walls ,Edge walls, B/walls, laying of GSB, WBM grade II incl. Macadamization of approach road, construction of river tranning works, construction of traffic road diversion and its dismentalling after completion of bridge as per the drawings and directions of Engineer incharhge, including painting with enamel paint, (Complete Job in all respects) | 1 | job | 2,04,90,000 ₹2,04,90,000 Lowest | 2,45,37,400 ₹2,45,37,400 | 2,68,25,194.91 ₹2,68,25,194.91 | 2,35,44,860.5 ₹2,35,44,860.5 | 2,29,23,289.2 ₹2,29,23,289.2 | 2,49,92,000 ₹2,49,92,000 | 2,83,44,953 ₹2,83,44,953 | 2,16,96,418 ₹2,16,96,418 |
Tender Value
₹3.3 Cr
EMD Value
₹6.5 L
Closing Date
20 Apr 2026, 11:00 amClosed
Executive Engineer RandB Division Bandipora
Office of the Xen RandB Division Bandipora
Design and Construction of 1x17 Mtr Span Steel Plate Girder Double Lane Bridge including construction of road diversion approaches at Tangwani Garoora On Sumbal Bandipora Road on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE).
2026_PWDJK_307297_1
Fresh e NIT No.02 of 2026-27 Dated 03-04-2026
Open Tender
Civil Works
Turn-key
540 days
Bandipora
As per NIT and SBD
2 documents required · 2 mandatory
₹5,500
Executive Engineer R and B Division Bandipora
₹6.5 L
Office of the SE PWD RandB Circle Bandipora
13 May 2026
4 Apr 2026
20 Apr 2026
4 Apr 2026
20 Apr 2026
6 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building work | |||||
| 1.01 | Design & Construction of 1x17 Mtr Span Steel Plate Girder Double Lane Bridge including construction of road diversion approaches at Tangwani Garoora On Sumbal Bandipora Road on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE).
The job among other things includes designing part to be Vetted by Design Directorate IIT/DIQC/NIT Srinagar including soil investigation, load testing, Dismantling / de-launching of existing baileys bridge, construction of Foundation, Sub-structure, superstructure, (Drainage spouts, wearing Coat, Providing & Fixing of suitable bearings etc) duly approved by the department incl. construction of approaches of required length (as per the directions of Engineer in charge) on each side by way of earth cutting, filling, construction of protection works ie. R/ walls ,Edge walls, B/walls, laying of GSB, WBM grade II incl. Macadamization of approach road, construction of river tranning works, construction of traffic road diversion and its dismentalling after completion of bridge as per the drawings and directions of Engineer incharhge, including painting with enamel paint, (Complete Job in all respects) | - | job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
BOQ_997036.xls
BOQ • 0.23 MB
YYYY02.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .