| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC RECOMMENDED BY TC | |
| 2 | L2₹2.3 L+₹48,948.76 (26.8%)Rejected-Finance 262 NEW RAM NAGAR AMKHERA JABALPUR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹2.9 L+₹1.0 L (56.1%)Rejected-Finance | L3 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
10 Feb 2024, 11:00 amClosed
GM (Excavation), Dudhichua Area
Office of the GM (Excavation), Dudhichua Project PO Khadia, Distt. Sonebhadra, UP - 231222
Offloading work to outside agency for Repairing and Rewinding of various capacity AC Motors of PnH1900AL ER shovels of Dudhichua Project
2024_NCL_299803_1
DCH/GM (Excv)/Tender /Shovel/2023-24/86
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, DUDHICHUA AREA
Please refer Tender documents
6 documents required · 6 mandatory
₹3,800
7 Apr 2024
30 Jan 2024
12 Feb 2024
30 Jan 2024
10 Feb 2024
31 Jan 2024
30 Jan 2024 - 7 Feb 2024
Amount
SCOPE OF WORK As per NIT
Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 11kW; 3-phase; 415 V AC Blower Motor as per SCOPE OF WORK & NIT
Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 5.5kW / 7.5 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT
Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 2.25kW / 3 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT
Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 1.10kW / 2 HP; 3-phase; 415 V AC Blower Motor as per SCOPE OF WORK & NIT
Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 0.70kW / 1 HP; 3-phase; 415 V AC Blower Motor as per SCOPE OF WORK & NIT
Total impact of GST for the purpose of CTC
AMIYA ENGINEERING
M/S. SAURABH ENGINEERING WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_310559.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .