| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC NO 13 273 FIRST FLOOR MIG MARUTHAM NEW HOUSING UNIT THANJAVUR 613005 | THANJAVUR | THANJAVUR | TAMIL NADU | 613005 | ₹36.8 L | L1 | Accepted-AOC LER |
| 2 | L2₹36.9 LRejected-Finance NO 17 NEW CAUVERY NAGAR THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | ₹36.9 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | SRI JAGATHI CONSTRUCTION L2 | Durairaj Jeevagan L1 |
|---|---|---|---|---|---|
| 1.00BT to Upparigai to Ayyan thiruvalluvar nagar road in Ramanathapuram panchayat. | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres as per SS 20A including breaking clods,sectioning,ramming etc., complete as directed by the dept. officers for formation.(SI. No.61) | 88.96 | Cum | 141 ₹12,543.36 | 140.3 ₹12,481.09 |
| 3.00 | Picking the Existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete. | 1,235.62 | Sqm | 24 ₹29,654.88 | 23.2 ₹28,666.38 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 370.69 | Cum | 3,027 ₹11.2 L | 3,026.2 ₹11.2 L |
| 5.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 3,706.87 | Sqm | 88 ₹3.3 L | 86.5 ₹3.2 L |
| 6.00 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 3,706.87 | Sqm | 21 ₹77,844.27 | 20.1 ₹74,508.09 |
| 7.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Using Plastic Waste) | 111.2 | Cum | 12,053 ₹13.4 L | 12,051.5 ₹13.4 L |
| 8.00 | Providing and laying of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., complete | 79.08 | Cum | 570 ₹45,075.60 | 569.2 ₹45,012.34 |
| 9.00 | Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803 | 197.7 | Sqm | 891 ₹1.8 L | 889.8 ₹1.8 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 5,63,372 ₹5.6 L | 5,61,444 ₹5.6 L |
Tender Value
₹37.2 L
EMD Value
₹37,200
Closing Date
3 Mar 2026, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - BT to Upparigai to Ayyan thiruvalluvar nagar road in Ramanathapuram panchayat under MLACDS 2025-2026
2026_RDTN_666869_1
Rc.No. 2556/2025/A2 Dated 23.02.2026
Open Tender
Civil Works - Roads
180 days
Thanjavur
As per Tender bid document
8 documents required · 8 mandatory
₹0
₹37,200
28 Apr 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
BT to Upparigai to Ayyan thiruvalluvar nagar road in Ramanathapuram panchayat.
Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres as per SS 20A including breaking clods,sectioning,ramming etc., complete as directed by the dept. officers for formation.(SI. No.61)
Picking the Existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Using Plastic Waste)
Providing and laying of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., complete
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
1_UpparigaitoAyyanthiruvalluvarnagarroadTB.pdf
Tender Documents • 0.42 MB
1_UpparigaitoAyyanthiruvalluvarnagarroadPB.pdf
Additional Documents • 0.30 MB
BOQ_801102.xls
BOQ • 0.32 MB