| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹8.1 L (4.06%)Admitted-Finance | ₹2.1 Cr+₹8.1 L (4.06%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹12.0 L (6.01%)Admitted-Finance | ₹2.1 Cr+₹12.0 L (6.01%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹18.4 L (9.21%)Admitted-Finance | ₹2.2 Cr+₹18.4 L (9.21%) | L4 | Admitted-Finance |
| 5 | L5₹2.2 Cr+₹19.3 L (9.68%)Admitted-Finance | ₹2.2 Cr+₹19.3 L (9.68%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bidyadhar Swain L1 | Naresh Chandra Bhatta L6 | Baishnab Charan Nayak L9 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L7 | M/S BHAIRAB CHARAN SWAIN L10 | Aakar Infra Engineers PVT Ltd L13 | M/s Laxmidhar Mohanty L3 | Manoj Kumar Nayak L11 | M/S CHINMAYA RANJAN PARIDA L5 | M/s. Magu Charan Nayak L4 | Ms Gangadhar Jena L12 | M/S Kailash Chandra Samal L2 | SUBRAT KUMAR BEHURA L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation from existing ground level in all types of soil in foundation trenches including dressing & levelling the bed & depositing the excavated earth with all leads & lifts with supply of all labour, T&P, transportation etc. all complete as per direction of Engineer-in-charge but excluding cost of GST. | 2,115 | Each Cum. | 80 ₹1,69,200 | 70 ₹1,48,050 | 80 ₹1,69,200 | 90 ₹1,90,350 | 90 ₹1,90,350 | 112 ₹2,36,880 | 40 ₹84,600 Lowest | 140 ₹2,96,100 | 164 ₹3,46,860 | 70 ₹1,48,050 | 110 ₹2,32,650 | 50 ₹1,05,750 | 150 ₹3,17,250 |
| 2.00 | Back filling the excavated material in low laying area using the excavated material with all lead & lift with dressing, levelling & compacting the material around the structure, breaking the clods to maximum 5cm to 7cm laying in layer not exceeding 0.30m. with cost of labour, T&P, tollage, taxes,compacting the same all complete as per the direction of Engineer-in-charge but excluding cost of GST. | 1,410 | Each Cum. | 30 ₹42,300 | 55 ₹77,550 | 60 ₹84,600 | 78 ₹1,09,980 | 60 ₹84,600 | 78 ₹1,09,980 | 15 ₹21,150 | 60 ₹84,600 | 5 ₹7,050 Lowest | 60 ₹84,600 | 61 ₹86,010 | 25 ₹35,250 | 50 ₹70,500 |
| 3.00 | Collecting and conveying saline sand by private trucks within a lead of 5 Km, including loading at one end and unloading at other end for filling inside the plinth area with leveling, watering, consolidating, compaction with vibratory roller including supply of all labour, transportation, materials, T&P, all taxes, royalties,etc. complete as per direction of Engineer-in-charge but excluding cost of GST.
NB: (10% voids will be deducted from the measured quantity). | 12,163.8 | Each Cum. | 120 ₹14,59,656 Lowest | 240 ₹29,19,312 | 140 ₹17,02,932 | 145 ₹17,63,751 | 180 ₹21,89,484 | 800 ₹97,31,040 | 150 ₹18,24,570 | 300 ₹36,49,140 | 160 ₹19,46,208 | 140 ₹17,02,932 | 165 ₹20,07,027 | 145 ₹17,63,751 | 140 ₹17,02,932 |
| 4.00 | CC (1:4:8) (1 Cement: 4 coarse sand: 8 graded stone metal of 40mm. nominal size crusher broken of approved quality) in foundation & for base of flooring, etc. hoisting and laying the concrete in layers in position, consolidating, curing including centering & shuttering complete with supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete as directed by Engineer-in-charge but excluding cost of GST. | 300.5 | Each Cum. | 3,000 ₹9,01,500 | 2,800 ₹8,41,400 Lowest | 2,800 ₹8,41,400 Lowest | 4,000 ₹12,02,000 | 3,400 ₹10,21,700 | 4,900 ₹14,72,450 | 3,300 ₹9,91,650 | 3,500 ₹10,51,750 | 4,000 ₹12,02,000 | 3,200 ₹9,61,600 | 3,150 ₹9,46,575 | 3,050 ₹9,16,525 | 3,000 ₹9,01,500 |
| 5.00 | Brick masonry work with flyash bricks in foundation and super structure having crushing strength not less than 75 Kg/Cm2 with cement mortar (1:6) up to DPC level with splays, cutting, curing, racking out the joints, all complete with supply of all labour, T&P, taxes, tollage, royalties, transportation etc. as per direction of Engineer-in-charge but excluding Cost of GST. | 1,330 | Each Cum. | 3,650 ₹48,54,500 Lowest | 3,800 ₹50,54,000 | 4,200 ₹55,86,000 | 4,500 ₹59,85,000 | 4,300 ₹57,19,000 | 5,400 ₹71,82,000 | 3,900 ₹51,87,000 | 4,000 ₹53,20,000 | 4,000 ₹53,20,000 | 3,900 ₹51,87,000 | 4,550 ₹60,51,500 | 3,950 ₹52,53,500 | 3,800 ₹50,54,000 |
| 6.00 | Cement concrete (1:1½:3) of 12mm to 20 mm. size crusher broken) of approved quality for RCC works in footing of GI Gate including hoisting & laying the concrete in layers in position finished smooth to the exposed surface, consolidating with vibrator where found necessary curing, etc. all complete including supply of all materials, labour, T&P, taxes, tollage, royalties, transporatation etc. complete as per direction of Engineer-in-charge & excluding cost of reinforcement & labour for cutting, bending and binding charges, but excluding cost of GST. | 955 | Each Cum | 5,000 ₹47,75,000 | 5,050 ₹48,22,750 | 6,300 ₹60,16,500 | 4,380 ₹41,82,900 | 5,500 ₹52,52,500 | 8,200 ₹78,31,000 | 4,600 ₹43,93,000 | 5,000 ₹47,75,000 | 4,100 ₹39,15,500 Lowest | 4,800 ₹45,84,000 | 6,510 ₹62,17,050 | 4,910 ₹46,89,050 | 5,500 ₹52,52,500 |
| 7.00Rigid smooth leak proof centering, shuttering by providing level shutter for R.C.C. members including supply of all materials, labour, T&P, taxes, tollage, royalties, etc. complete in all respect in all floor & dismantling removing the centering, shuttering as per the direction of Engineer-in-charge but excluding cost of GST. | ||||||||||||||||
| 7.01 | Column Footing:- | 2,505 | Each Sqm | 80 ₹2,00,400 Lowest | 150 ₹3,75,750 | 80 ₹2,00,400 Lowest | 91.4 ₹2,28,957 | 180 ₹4,50,900 | 380 ₹9,51,900 | 220 ₹5,51,100 | 200 ₹5,01,000 | 150 ₹3,75,750 | 220 ₹5,51,100 | 82 ₹2,05,410 | 160 ₹4,00,800 | 100 ₹2,50,500 |
| 7.02 | Column:- | 3,528.25 | Each Sqm | 200 ₹7,05,650 | 200 ₹7,05,650 | 500 ₹17,64,125 | 140 ₹4,93,955 Lowest | 180 ₹6,35,085 | 400 ₹14,11,300 | 230 ₹8,11,497.5 | 300 ₹10,58,475 | 200 ₹7,05,650 | 280 ₹9,87,910 | 510 ₹17,99,407.5 | 170 ₹5,99,802.5 | 200 ₹7,05,650 |
| 8.00 | Supply Tor/TMT Steel manufacture by SAIL/TISCON/VIZAG STEEL of Fe-500 confirming to IS-1786 specification including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes etc. all complete as per the direction of engineer-in charge but excluding cost of GST. NB: No wastage shall be paid, payment will be made as per co-efficient as per IS-1786. | 1,032 | Each Qtl. | 5,000 ₹51,60,000 | 5,200 ₹53,66,400 | 6,200 ₹63,98,400 | 5,000 ₹51,60,000 | 5,300 ₹54,69,600 | 8,500 ₹87,72,000 | 5,400 ₹55,72,800 | 6,500 ₹67,08,000 | 6,000 ₹61,92,000 | 5,800 ₹59,85,600 | 6,210 ₹64,08,720 | 4,950 ₹51,08,400 Lowest | 6,000 ₹61,92,000 |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
26 May 2020, 5:15 pmClosed
EE, DC,PPT
Office of the Design Cell, Engineering Department, Paradip Port Trust, First Floor, Administrative Building, Tele-06722-222154 Mob-09178961547
Construction of compound wall around the slums area of nua-sandhakud and Mundapada area.
2020_MoS_553657_1
CE/DC/ACCTS-02/2020/265
Open Tender
Civil Works
Works
300 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
As per TCN and TD
₹4.6 L
Yes
25 Nov 2020
19 Mar 2020
27 May 2020
19 Mar 2020
26 May 2020
19 Mar 2020
Amount
Earth work excavation from existing ground level in all types of soil in foundation trenches including dressing & levelling the bed & depositing the excavated earth with all leads & lifts with supply of all labour, T&P, transportation etc. all complete as per direction of Engineer-in-charge but excluding cost of GST.
Back filling the excavated material in low laying area using the excavated material with all lead & lift with dressing, levelling & compacting the material around the structure, breaking the clods to maximum 5cm to 7cm laying in layer not exceeding 0.30m. with cost of labour, T&P, tollage, taxes,compacting the same all complete as per the direction of Engineer-in-charge but excluding cost of GST.
Collecting and conveying saline sand by private trucks within a lead of 5 Km, including loading at one end and unloading at other end for filling inside the plinth area with leveling, watering, consolidating, compaction with vibratory roller including supply of all labour, transportation, materials, T&P, all taxes, royalties,etc. complete as per direction of Engineer-in-charge but excluding cost of GST. NB: (10% voids will be deducted from the measured quantity).
CC (1:4:8) (1 Cement: 4 coarse sand: 8 graded stone metal of 40mm. nominal size crusher broken of approved quality) in foundation & for base of flooring, etc. hoisting and laying the concrete in layers in position, consolidating, curing including centering & shuttering complete with supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete as directed by Engineer-in-charge but excluding cost of GST.
Brick masonry work with flyash bricks in foundation and super structure having crushing strength not less than 75 Kg/Cm2 with cement mortar (1:6) up to DPC level with splays, cutting, curing, racking out the joints, all complete with supply of all labour, T&P, taxes, tollage, royalties, transportation etc. as per direction of Engineer-in-charge but excluding Cost of GST.
Cement concrete (1:1½:3) of 12mm to 20 mm. size crusher broken) of approved quality for RCC works in footing of GI Gate including hoisting & laying the concrete in layers in position finished smooth to the exposed surface, consolidating with vibrator where found necessary curing, etc. all complete including supply of all materials, labour, T&P, taxes, tollage, royalties, transporatation etc. complete as per direction of Engineer-in-charge & excluding cost of reinforcement & labour for cutting, bending and binding charges, but excluding cost of GST.
Rigid smooth leak proof centering, shuttering by providing level shutter for R.C.C. members including supply of all materials, labour, T&P, taxes, tollage, royalties, etc. complete in all respect in all floor & dismantling removing the centering, shuttering as per the direction of Engineer-in-charge but excluding cost of GST.
Column Footing:-
Column:-
Supply Tor/TMT Steel manufacture by SAIL/TISCON/VIZAG STEEL of Fe-500 confirming to IS-1786 specification including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes etc. all complete as per the direction of engineer-in charge but excluding cost of GST. NB: No wastage shall be paid, payment will be made as per co-efficient as per IS-1786.
Cement plaster in Cement mortar (1:6) over newly brick work of different thickness including racking the joints rounding the corners and finishing smooth to the exposed surface with curing scaffolding, staging including cost & supply of all labour, materials, T&P, taxes, tollage, etc. all complete as directed by Engineer-in-charge excluding cost of GST.
12 mm thick
16 mm thick
Two coats cement paint over a coat of primer to newly plastered surface of compound wall including filling the holes with required materials, washing and cleaning the walls with cost of brush, T&P, taxes, scaffolding, etc. complete to give an even shade and up to satisfaction of Engineer-in-charge but excluding cost of GST.
M/S Kailash Chandra Samal
M/s Laxmidhar Mohanty
M/s. Magu Charan Nayak
M/S CHINMAYA RANJAN PARIDA
Naresh Chandra Bhatta
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
SUBRAT KUMAR BEHURA
Baishnab Charan Nayak
M/S BHAIRAB CHARAN SWAIN
Manoj Kumar Nayak
Ms Gangadhar Jena
Aakar Infra Engineers PVT Ltd
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Compoundwall_TD.pdf
Tender Documents • 1.02 MB
BOQ_580560.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .