Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.8 L
EMD Value
₹5,325
Closing Date
2 Oct 2024, 10:59 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Directorate of Municipal Administration
prashant j
Treatment and reuse of grey water for specially stratified and related infrastructure works
DMA/2024-25/OW/WORK_INDENT29799
DMA/2024-25/OW/WORK_INDENT29799
Open
Other Works
Two Tender Document System(Two Cover)
DMA Town Municipal Council Madhugiri
4 documents required · 4 mandatory
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
work done certificate
₹500
₹5,325
13 Sept 2024
13 Sept 2024
3 Oct 2024
19 Sept 2024
Treatment and reuse of grey water for specially stratified and related infrastructure works
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. For Drain works consider 3% of item concrete ra...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. or Drain works consider 35% of item concrete ra...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw1.doc
Tender Document • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .