| 1 | L1₹15.1 CrAccepted-AOC GRAM AND POST MAJHARA THANA WAZIRGANJ DISTRICT GONDA UTTAR PRADESH | MAJHARA | GONDA | UTTAR PRADESH | ₹15.1 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹15.8 CrRejected-Finance | ₹15.8 Cr | L2 | Rejected-Finance Not Admitted |
Tender Value
₹17.0 Cr
EMD Value
₹30 L
Closing Date
7 Mar 2024, 12:00 pmClosed
SE Jnp Gzp Circle, PWD Jaunpur
SE Jnp Gzp Circle, PWD Jaunpur
W/S of Rampur Kathawatiya road (ODR) (5 year Maintenance)
2024_CEUVZ_907978_1
721/SE Tender/jnp-gzp circle/23 date 21-02-2024
Open Tender
Civil Works
365 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹30 L
Yes
SE Jnp Gzp Circle, PWD Jaunpur
27 Mar 2024
29 Feb 2024
7 Mar 2024
29 Feb 2024
7 Mar 2024
29 Feb 2024
29 Feb 2024
Amount
Excavation for road work in soil with hydraulic excavator of 1.00 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of Embankment with Material Deposited from Roadway Cutting with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST) (Compaction Only) (Including all T&P, labour cess etc. but excluding G.S.T.)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads (Lead 1 Km.), transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.. (Including all T&P, labour cess etc. but excluding G.S.T.)
GSB - Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with motor grader at OMC, and compacting with Soil campactor roller to achieve the desired density, complete as per MORT&H Technical Specification Clause 401. For Widening (Including all material, T&P, labour cess etc. but excluding G.S.T.)
WMM- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with Soil campactor roller to achieve the desired density. As per Technical Spec. Clause 406 For Widening (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Cement Concrete Pavement- Construction of un-reinforced, dowel jointed, plain cement concrete M-35 pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing As Per Clause 602(A) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
ETA- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with Soil campactor roller to achieve the desired density. (WMM+1%OPC Cement+3.5% Emulsion) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying Tack Coat with Bitumen VG-10 using bitumen sprayer at the rate of 0.25 kg per sqm on the prepared surface cleaned by mechanical broom. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying 40mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of sub grade and earthen shoulder with approved material obtained from borrow pits with all lift, lead (1 Km.) & transporting to site spreading to required slope and compacting to meet requirement of table 300.2(Including all material, T&P, labour cess etc. but excluding G.S.T.)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material for Boggi action For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
RCC Grade M20 Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.)
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 1st Year Maintenance charge @ 0% of Sub toal of Part-A work done (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 2nd Year Maintenance charge @ 0.25% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 3rd Year Maintenance charge @ 0.50% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 4th Year Maintenance charge @ 0.75% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 5th Year Maintenance charge @ 1.00% (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
SURAJ BUILDER INDIA PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf