Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | L1 | Accepted-Finance Lowest Amount | |
| 2 | L2₹2.6 L+₹1,356.13 (0.52%)Rejected-Finance | L2 | Rejected-Finance Highest Amount | |
| 3 | L3₹2.6 L+₹1,382.21 (0.53%)Rejected-Finance | L3 | Rejected-Finance Highest Amount |
Tender Value
₹2.6 L
EMD Value
₹5,300
Closing Date
3 Oct 2026, 11:00 amClosed
eo
np sumerpur
ward 01 v ward 10 me garvej collection point ka nirman kary ward 01 v ward 10 me garvej collection point ka nirman kary
2026_DOLBU_1188800_1
577 date 17.09.2026/08
Open Tender
Civil Works
Percentage
np sumerpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
eo
₹5,300
Yes
5 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clearnce and other unseen items. | 1 | LS | 500 | ₹500 |
| 2 | Photography work etc. | 1 | Job | 500 | ₹500 |
| 3 | Earth work in Excavation drain. | 11.88 | Cum. | 120 | ₹1,425.6 |
| 4 | Sand filling in foundation with complete work. | 2.49 | Cum. | 1,000 | ₹2,490 |
| 5 | P.C.C. work in 1:4:8 cement sand with stone ballast in bed of drain | 3.74 | Cum. | 4,300 | ₹16,082 |
| 6 | RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. S.I. No.-288 (As in item (283) above but in RCC T-beam and slab roof in 1.1.5.3) | 21.05 | Cum. | 7,600 | ₹1,59,980 |
| 7 | Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. SI No. 504 | 12.23 | SQM | 5,600 | ₹68,488 |
| 8 | Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 1.13 | SQM | 5,600 | ₹6,328 |
| 9 | Fixing of Display Board etc. | 1 | Job | 5,000 | ₹5,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_2239636.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .