Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC BALTIKURI INDUSTRIAL ESTATE PLOT NO A 01 DASNAGAR HOWRAH 711113 | HOWRAH | HOWRAH | WEST BENGAL | 711113 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹5.6 L+₹73,660 (15.0%)Rejected-Finance 103 1A RAJA DINENDRA STREET KOLKATA 700006 | KOLKATA | KOLKATA | WEST BENGAL | 700006 | L2 | Rejected-Finance bidder is not L1 | |
| 3 | L3₹6.0 L+₹1.1 L (21.5%)Rejected-Finance | L3 | Rejected-Finance bidder is not L1 | |
| 4 | L4₹6.1 L+₹1.2 L (23.9%)Rejected-Finance | L4 | Rejected-Finance bidder is not L1 | |
| 5 | L5₹6.4 L+₹1.5 L (30.6%)Rejected-Finance 210 A RASHBEHARI AVENUE KOLKATA 700029 | KOLKATA | KOLKATA | WEST BENGAL | 700029 | L5 | Rejected-Finance bidder is not L1 |
Tender Value
Refer Docs
EMD Value
₹13,429
Closing Date
1 Jul 2025, 11:00 amClosed
EE-l CKHED PWD
Central Kolkata Health Electrical Division P-12, C.I.T Road(1st floor) KOLKATA
Supply Installation Testing and Commissioning of Air Conditioner Machines at PMR Seminar Room, Nursing Superintendent Chambers, Neurology Seminar Room of CNMCH
2025_WBPWD_866036_1
WBPWD/EE-I/CKHED/eNIT18/25-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
CENTRAL KOLKATA HEALTH ELECTRICAL DIVISION
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,429
Central Kolkata Health Electrical Division
12 Aug 2025
18 Jun 2025
3 Jul 2025
18 Jun 2025
1 Jul 2025
24 Jun 2025
23 Jun 2025
Amount
Supply & Delivery of 230V,1-Ph, 50Hz, 2Tr. capacity Concealed Split Air Conditioning Machine along with 1 no. IDU of rated Cooling Capacity:- 24000 BTU/HR, Compressor:- Rotary Type, Remote Control:- Yes, Condenser Coil:- Copper, Refrigerant Type:- R-410A/R-32, Air Flow/IDU:- 800CFM, Operating Mode:- Cool & Fan Mode, Sleep Mode:- Yes, Timer:- Yes. (Make:- Daikin/Voltas/Hitachi/O General)
Lifting,Shifting,Installation,Testing & Commissioning of IDU & ODU of following capacities concealed type Split Air Conditioners machines, after making hole in ceiling /wall on mending good the damages to the original finish as required & necy. scaffolding arrangement, labour cost etc.on both side(IDU & ODU Installation), and also connecting rod/rope from the ceiling must be attached into the machine by nuts,bolts etc. as per recurement with incl. Supply of required Refrigerant R-410A ,S&F of necy. fixing arrangement for indoor & Outdoor duly painted etc. as per direction of EIC if required.
Supply fabrication and fixing specically for indoor unit should be supported with ms channel by 2 nos of 40mm x 40mm x 6mm to distribute the total load from the mounted wall and by drilling holes for 4nos downrod & connecting the downrod into the channel by nuts,bolts etc. & including supporting angle 25 mm x 25mm x 6mm arrangement as per direction of EIC.[For 01nos. 2Ton AC machines=01nos. IDU]
Supplying & fixing of 2nos 1.45 mtr long MS U-Channel (TATA Make) of size (75 mm x 50 mm x 50mm x 6mm thick) for making platform for installation of outdoor unit on it after cutting holes (10 inch) into the wall & grouting the same with cement concrete (1:1 %1/2: 3) etc incl. mending as orginal. The fabrication of platform with horizontal MS angle of 25 mm x 25 mmx 6mm with supporting angle 50mm x50mm x 6mm on the outer edge and also in the middle portion of the platform and for transmitting the load, 2Nos (50 mm x50 mm x 6 mm) MS Angle inserted diagonally with the platform and exiting wall .The entire structure should be baricated with 25mmx 25mm x6mm MS angle and height will be 1M to ensure the safety of ODU maintenance. The platform will be 2Mx1.2M. incl. scaffolding arrangement, labour cost etc. The entire structure shuould be painted with One coat of red lead/Zinc chromate priming 1st coat of synthetic enamel paint over the primer then 2nd coat of synthetic enamel paint over the 1st coat(Structural design should be approved from EIC.)
Copper Refrigeration pipe line for liquid and suction line with fittings, elbows, bends, supports & brackets etc. (Make- Ryoku/Totaline/Jobu/ Nippon/EIC Approved) Suction Line (5/8 OD with 0.7mm thick)
Liquid Line(1/4" OD with 0.6mm thick).
Supply & Fixing Pipe Insulation in liquid & suction line with 9mm nitrile rubber tube wrappling with Water Prof Heavy Duty AC Insulation Tape (Supreme/Accoflex/Armacell/EIC Approved) Suction Line (5/8 OD with 0.7mm thick)
Liquid Line(1/4" OD with 0.6mm thick).
Supply and fixing of AI powder coated continuous Grill (Make- Premier, Dynacraft/ EIC approved.)
Supply and laying Control copper Cable (PVC insulated & unshethed,un-armoured) from Condensing Unit to IDU control panel (Make: Havells/RR Kable /finolex/EIC Approved ) 4 core 2.5 sq mm communication cable.
Supply and laying of Drain Water piping work out of UPVC hard pipes of following sizes incl. nitrile insulation with fiting accessories bends, elbows, tees flanges, tapings, wall sleeves hangers, supports, anchors etc. as required.(Make : Supreme / Astral/ EIC approved). 25 mm dia.
Supply & Fixing Pipe Insulation for 25 MM dia drain pipe with 9mm nitrile rubber tube (Supreme/Accoflex/Armacell/EIC Approved)
Supply and fixing 2-way MCB SS enclosure with IK-08 protection, [Legrand 507791] powder coated & S&F of 25A, 2 pole MCB in DIN channel, concealed in wall after cutting the wall & mending good the damages to the original finish or total establishment on flat iron frame in wall incl. inter-connection with suitable size of copper wire, necy. painting,& provision for earthing attachment etc. as required. [PWD/GS Page: d-9 Item: 11 & [PWD/GS Page: d-6 Item: 7]]
Supplying & fixing of 230V, Timer DB Fixed on Wall by flat iron/Angle frame or as per direction of EIC . The Box should comprising following accessories......... A).Double-door SPN-MCB Distribution Board with IP-42/43 protection 2+8 way make Legrand/LK or as to GS. B). 1No. 250V ,50Hz,16 Amp Digital daily & weekly time switches(Make LK-67DDT0/Eqv. legrand) C)1No 250V,25A DP-Contactor (Make- legrand model -DX³ contactors - 25 A 2 NO contactor 412544). D)1No. 250V,25A DP-MCB(Make-LK/Eqv. legrand). E)The complete arrangement must be wiring by suitable size of PVC insulated Cu wire with suitable socket/lugs as per requirement & direction by EIC .
Distribution wiring in 1.1 KV single core stranded 'FR' PVC insulated & unsheathed copper wire (Make:- RR/Havells/Finolex/ Polycab/Gloster) in 20mm size PVC rigid conduit 'FR' (Precision make) incl. necy. fittings as required.
2x56/0.3 (4 sqmm) + 1x36/0.3 (2.5 sqmm) as ECC
Finishing of the PVC insulated wire ends by socketting with pin/ring type copper sockets and insulated tapes etc., including supplying sockets, tapes.
Supply & Fixing 240 V, 25 A, 3 pin Modular type plug socket (Make:- Legrand/Anchor/ Havells/ABB), without plug top and switch with 2 Module GI Modular type switch board with top cover plate flushed in wall and making necy. connections with PVC Cu wire and earth continuity wire etc..
Supply & Fixing 240 V,25 A, 3 pin Modular type plug top with indicator (Make:- Legrand/Anchor/ Havells/ North West) & necy. Connections.
Rate should be quoted incl. of all taxes and cess.
Defect Liability period : 1 year
S.R. REFRIGERATION AND APPLIANCES (BID ID -6659817)
STAAR CONSTRUCTION (BID ID -6654485)
UNIVERSAL SALES (BID ID -6661810)
OVERSEAS TRADING AND SUPPLIES CORPORATION (BID ID -6650689)
B. ENGINEERING CO. (BID ID -6660542)
UNITED CONSTRUCTION SERVICE (BID ID -6631943)
TAPAN ELECTRICS (BID ID -6631909)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .