| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹6.7 L (5.50%)Admitted-Finance | ₹1.3 Cr+₹6.7 L (5.50%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents not submitted as per NIT |
| Sl No | Description | Qty | Unit | Supertech Engineers L1 | Hemcool Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under: For Hall 8-11 a) 450 TR Centrifugal Chiller Unit= 4 Nos. (Carrier Make) b) Chilled water Pumps (Primary)= 4 Nos. c) Chilled water Pumps (Secondary)= 4 Nos. d) Condenser water pumps= 4 Nos. e) Cooling Tower= 4 Nos. f) Floor mounted AHU's= 29 Nos. g) Ceiling suspended AHU=8 Nos. h) 2 TR FCU= 4 Nos. i) Tube Axial Flow Fan= 29 Nos. j) Inline Fans and Propeller Fans = 46 Nos. K) All electrical Control Panel in AC Plant, Control Console Panel and AHU Room Panels l) Associated work such as piping, valves and ducting etc . | 24 | Months | 94,017 ₹22,56,408 Lowest | 1,00,000 ₹24,00,000 |
| 2.00Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under: For Hall 7 ABCDEFG | |||||
| 2.01 | For chiller plant a) 250 TR Screw Chiller Unit= 2 Nos. (Carrier Make) b) Chilled water Pumps (Primary)= 2Nos. c) Condenser water pumps= 2 Nos. d) Cooling Tower= 2 Nos e) Electrical Control Panel in AC Plant, for chiller, cooling tower and primary pump. | 24 | Months | 48,378 ₹11,61,072 Lowest | 55,000 ₹13,20,000 |
| 2.02 | For pumps & AHUsc) a)Chilled water Pumps (Secondary)= 5 Nos. b) Booster pumps 1000 GPM= 3 Nos. c) Floor mounted AHU's= 18 Nos. d) AHU blower Variable speed drive = 11 Nos. e) 200mm Air seperator = 1 No. f)750 CFM inline fan= 1No. g) HRV units 5 Nos. h) jet diffusers =130 Nos. i) smoke extraction fan =27 No. j) Inline Fan and propeller fans=1 Nos. k) All electrical Control Panel in AC Plant, Control Console Panel and AHU Room Panels. l) Associated work such as piping, valves and ducting etc. | 24 | months | 7,200 ₹1,72,800 Lowest | 19,500 ₹4,68,000 |
| 3.00 | Operation of Central Air Conditioning plant installed at Pragati Maidan, with details of equipments as per item no 1 and 2 for 7-11 in one shift of 8 Hrs 30 Minfrom 09:30 Am to 6:00 Pm on all days excluding weekly rest days and Gazetted holidays, as per terms and conditions attached by deputing the following man power. For Hall no.7-11 (i) HVAC operator- 2 Nos. (ii)Khalasi -2 Nos. (Note: One set of both workers for one month operation at any plant will be called one job month and Weekly rest for workman shall be shifted during non exhibition days) | 24 | Months | 1,54,441 ₹37,06,584 Lowest | 1,60,000 ₹38,40,000 |
| 4.00 | Operation of Central Air Conditioning plant installed at Pragati Maidan, with details of equipments as per item no. 1 and item no. 2 before 9:30 AM and after 6 PM on the days of operation in item No. 3 and on holidays, as and when required as per terms and conditions attached by deputing the following man power etc. as required:- For Hall no.7-11 (i) HVAC operator- 1 Nos. (ii)Khalasi -1 | 1,800 | Hours | 40 ₹72,000 Lowest | 80 ₹1,44,000 |
| 5.00 | Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under: For Hall No.12-12A a) 450 TR Centrifugal Chiller Unit= 3 Nos. (Carrier Make) b) Chilled water Pumps (Primary)= 3 Nos. c) Chilled water Pumps (Secondary)= 3 Nos d) Condenser water pipelines = 3 Nos. e) Cooling Tower= 3 Nos. f) Floor mounted AHU's= 10 Nos. g) Tube Axial Flow Fan= 10 Nos. h) All electrical control panel and AHU room planels. i) Assosiated work such as piping valves and ducting etc. | 24 | Months | 80,000 ₹19,20,000 | 71,400 ₹17,13,600 Lowest |
| 6.00 | Operation of central air conditioning plant installed at Pragati Maidan, with details of equipments as per Item No. 5 in one shift of 8 Hrs 30 mins from 09:30AM to 06:00PM on all days excluding weekly rest days & Gazetted holidays, as per terms & condition attached and by deputing following man power: For Hall No.12-12A (i) HVAC operator – 2 no. (ii) Khallasi – 1 no. (Note:- Weekly rest for workmen shall be shifted during non exhibition days). | 24 | months | 1,20,577 ₹28,93,848 Lowest | 1,22,500 ₹29,40,000 |
| 7.00 | Operation of central air conditioning plant installed at Pragati Maidan, with details of equipments as per Item No.5 before 09:30AM and after 6PM on the days of operation in item no.6 and on holidays/ as and when required as per terms and condition attached and by deputing following man power. For Hall No.12-12A (i)HVAC operator :- 2 No (ii)Khallasi :-1 No. (Note: Material if required during overtime shall not be paid extra as it is already considered in item no.2 of schedule of work) | 720 | Hours | 40 ₹28,800 Lowest | 80 ₹57,600 |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
17 Dec 2024, 3:00 pmClosed
Manager Electrical
Room Manager Electrical Bharat Mandapam NEW DELHI
Operation and comprehensive maintenance contract of central HVAC plant of hall no.7, 8-11 and hall-12-12A at Bharat Mandapam,New Delhi for the period of two years.
2024_ITPO_839131_1
169-ITPO(7)E-E/2024-25/37
Open Tender
Electrical Works
Item Rate
730 days
Bharat Mandapam
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,180
Yes
ITPO
₹2.5 L
Yes
20 Dec 2024
11 Dec 2024
18 Dec 2024
11 Dec 2024
17 Dec 2024
11 Dec 2024
Amount
Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under: For Hall 8-11 a) 450 TR Centrifugal Chiller Unit= 4 Nos. (Carrier Make) b) Chilled water Pumps (Primary)= 4 Nos. c) Chilled water Pumps (Secondary)= 4 Nos. d) Condenser water pumps= 4 Nos. e) Cooling Tower= 4 Nos. f) Floor mounted AHU's= 29 Nos. g) Ceiling suspended AHU=8 Nos. h) 2 TR FCU= 4 Nos. i) Tube Axial Flow Fan= 29 Nos. j) Inline Fans and Propeller Fans = 46 Nos. K) All electrical Control Panel in AC Plant, Control Console Panel and AHU Room Panels l) Associated work such as piping, valves and ducting etc .
Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under: For Hall 7 ABCDEFG
For chiller plant a) 250 TR Screw Chiller Unit= 2 Nos. (Carrier Make) b) Chilled water Pumps (Primary)= 2Nos. c) Condenser water pumps= 2 Nos. d) Cooling Tower= 2 Nos e) Electrical Control Panel in AC Plant, for chiller, cooling tower and primary pump.
For pumps & AHUsc) a)Chilled water Pumps (Secondary)= 5 Nos. b) Booster pumps 1000 GPM= 3 Nos. c) Floor mounted AHU's= 18 Nos. d) AHU blower Variable speed drive = 11 Nos. e) 200mm Air seperator = 1 No. f)750 CFM inline fan= 1No. g) HRV units 5 Nos. h) jet diffusers =130 Nos. i) smoke extraction fan =27 No. j) Inline Fan and propeller fans=1 Nos. k) All electrical Control Panel in AC Plant, Control Console Panel and AHU Room Panels. l) Associated work such as piping, valves and ducting etc.
Operation of Central Air Conditioning plant installed at Pragati Maidan, with details of equipments as per item no 1 and 2 for 7-11 in one shift of 8 Hrs 30 Minfrom 09:30 Am to 6:00 Pm on all days excluding weekly rest days and Gazetted holidays, as per terms and conditions attached by deputing the following man power. For Hall no.7-11 (i) HVAC operator- 2 Nos. (ii)Khalasi -2 Nos. (Note: One set of both workers for one month operation at any plant will be called one job month and Weekly rest for workman shall be shifted during non exhibition days)
Operation of Central Air Conditioning plant installed at Pragati Maidan, with details of equipments as per item no. 1 and item no. 2 before 9:30 AM and after 6 PM on the days of operation in item No. 3 and on holidays, as and when required as per terms and conditions attached by deputing the following man power etc. as required:- For Hall no.7-11 (i) HVAC operator- 1 Nos. (ii)Khalasi -1
Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under: For Hall No.12-12A a) 450 TR Centrifugal Chiller Unit= 3 Nos. (Carrier Make) b) Chilled water Pumps (Primary)= 3 Nos. c) Chilled water Pumps (Secondary)= 3 Nos d) Condenser water pipelines = 3 Nos. e) Cooling Tower= 3 Nos. f) Floor mounted AHU's= 10 Nos. g) Tube Axial Flow Fan= 10 Nos. h) All electrical control panel and AHU room planels. i) Assosiated work such as piping valves and ducting etc.
Operation of central air conditioning plant installed at Pragati Maidan, with details of equipments as per Item No. 5 in one shift of 8 Hrs 30 mins from 09:30AM to 06:00PM on all days excluding weekly rest days & Gazetted holidays, as per terms & condition attached and by deputing following man power: For Hall No.12-12A (i) HVAC operator – 2 no. (ii) Khallasi – 1 no. (Note:- Weekly rest for workmen shall be shifted during non exhibition days).
Hemcool Engineers (BID ID -3137405)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
TenderdocumentAC.pdf
Tender Documents • 0.79 MB
BOQ_881993.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .