Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹24.9 L+₹2.0 L (8.83%)Rejected-AOC E 82 HQ CE A N Z PB POST BOX NO 687 LILLYPUR NEAR MES GURUDWARA HADDO POST SRI VIJAYA PURAM 744 102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | 2 | Rejected-AOC Not L1 | |
| 3 | 3₹27.6 L+₹4.7 L (20.6%)Rejected-AOC DUDH LINE NAYAGAON VILL SHADIPUR POST SRI VIJAYA PURAM TEHSIL SOUTH ANDAMAN 744106 | SRI VIJAYA PURAM | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744106 | 3 | Rejected-AOC Not L1 | |
| 4 | 4₹28.1 L+₹5.2 L (23.0%)Rejected-AOC | 4 | Rejected-AOC Not L1 | |
| 5 | 5₹29.9 L+₹7.1 L (31.0%)Rejected-AOC | 5 | Rejected-AOC Not L1 |
Tender Value
₹34 L
EMD Value
₹68,000
Closing Date
28 Oct 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Brichgunj
GE Brichgunj, Port Blair
PERIODICAL SERVICES TO MARRIED AND OTM ACCOMMODATION AT BIRCHGUNJ MILITARY STATION AND AF STN STN UNDER AGE B/R -I SUB DIVISION OF GE BRICHGUNJ
2020_MES_381979_1
8065A GEBG
Open Tender
Civil Works
Item Rate
270 days
Brichgunj
As per NIT
7 documents required · 7 mandatory
₹500
GE Brichgunj
₹68,000
Yes
17 Dec 2020
29 Sept 2020
30 Oct 2020
29 Sept 2020
28 Oct 2020
14 Oct 2020
60 days
Amount
Material and labour for preparation of old treated plastered surfaces including Washing, rubbing down and stopping and applying one coat of oil bound distemper to walls, complete all as specified and directed by Eng-in-charge.
All as per item No 01 here- in- before but as on ceilling.
Material and labour for two coats oil bound distemper over one coat of alkali resistant primer on old decorative surfaces of wall including complete removal existing treatment etc complete all as specified and directed by Eng-in-charge.
All as per item No 03 here- in- before but as on ceilling.
Material and labour for preparation of new plastered surface or unplastered surfaces of walls and cornices complete applying two coats of oil bound distemper over a coat of primer complete all as specified and directed by Eng-in-charge.
All as per item No 5 here- in- before but two coats of oil bound distemper on soffit of slab/ceiling.
Material and labour for preparing old wall surfaces and applying one layer of internal wall care putty complete all as specified and as directed .
Material and labour for two coats of plastic emulsion paint over one coat of primer on old decorated surfaces of wall including preparation of surfaces by complete removal of existing treatment etc. complete all as specified and directed by Eng-in-charge.
Material and labour for one coat of weather proof exterior acrylic emulsion paint with anti-fungal property on old painted wall surfaces including preparation of surfaces all as specified and directed by Engineer-in-Charge.
Material and labour for two coats of weather proof exterior acrylic emulsion paint with anti-fungal property on old painted wall surfaces over a coat of primer including preparation of surfaces by complete removal of existing treatment of any description complete all as specified and directed by Engineer-in-Charge.
Material and labour for two coats of weather proof exterior acrylic emulsion paint with anti-fungal property on newly plastered wall surfaces over including a coat of primer including preparation of surface etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for two coats of French polishing on wood or wood based surfaces of any description over a coat of wood filler as required of any description, width or girth including cleaning and preparing the surface s complete all as specified and as directed.
Material and labour for Varnishing under coating and finishing coat with synthetic varnish complete including preparation of old treated surfaces complete all as specified and as directed.
Material and labour for preparation of surfaces by brooming down old decorated, old plastered or unplastered surfaces of walls and cornices complete and applying two coats of white wash all as specified and directed by Eng-in-charge.
Material and labour for preparation of old painted wooden surfaces over 10 cm in width or girth and applying one coat of synthetic enamel paint all as specified and directed by Eng-in-charge.
Material and labour for preparation of new plastered surface or unplastered surfaces of walls and cornices complete applying two coats of cement based paint over a coat of primer on walls all as specified and directed by Eng-in-charge.
Material and labour for preparation of old painted surface by brooming down and applying one coat of cement based paint on walls all as specified and directed by Eng-in-charge.
Material and labour for preparation of old painted steel surfaces over 10 cm in width or girth and applying two coats of synthetic enamel paint all as specified and directed by Eng-in-charge.
Material and labour for preparation of old painted steel surfaces over 10 cm in width or girth and applying one coat of synthetic enamel paint all as specified and directed by Eng-in-charge.
Material and labour for writing letters or figures (Block, Roman, Italic or Indian) n exc 30 cm high complete all as specified and directed by Engineer-in-Charge.
Taking down cement plaster on brick or stone walls etc including raking out joints, hacking for key scrubbing down with water etc all as specified and directed by Eng-in-charge.
Material and labour for rendering 10 mm thick on fair faces of brick work or concrete surfaces in cement mortar 1:6 finished even and smooth without using extra cement all as specified and directed by Eng-in-charge.
Material and labour for rendering 10 mm thick on fair faces of brick work or concrete surfaces as in soffits of slab/chajas in cement mortar 1:3 finished even and smooth without using extra cement all as specified and directed by Eng-in-charge.
Material and labour for rendering 10mm thick on fair faces of brick work or concrete surfaces in cement mortar 1:4 finished even and smooth without using extra cement.
Material and labour for 15mm thick external rendering in two layers of 5mm thick in CM 1:4 mixed with water proofing compound (water proofing compound shall be used @3% of weight of cement) over a coat of 10mm thick in CM (1:6) over brick or concrete surfaces finished even and fair. Note: Supply only WPC will be measured and paid separately
Supply only water proofing compound conforming to IS-2645 1975.
Cutting of small trees/plants at the stem and removal of the roots of plants by using acids, chemical/Burning with blow lamp, cutting around the spot for removing the roots of any size and making good with Cement mortar 1:3 including two coats of cement base paint/acrylic emulsion up to height 4 storey complete all as directed by Engr-in-Charge.
Removing loose and broken concrete by chiselling / picking etc upto a depth of 10 to 30mm from floor or roof slab, chajjas and similar structural members cutting edges cleaning the dismantled portion with wire brushes etc to remove dust, dirt and other foreign particles, complete all as specified and as directed by Engineer-in-Charge.
Material and labour for application of high build polymer modified cementitous mortar 20 to 30 mm thick in two layers surfaces over a coat of bonding agent Nito Bond SBR @3 Kg per bag of cement applied as per manufactures instructions.Make: Nito Bond SBR of Fosroc or equivalent in STP/ Bostik/Hindcon
DISHA ENTERPRISES
M/S SHAJAHAN BUILDERS
T.THIYAGARAJAN
Priya construction
DEEPAK AGENCIES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .