Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAccepted-Finance R O BASGO LEH | LEH LADAKH | LADAKH | 194101 | L1 | Accepted-Finance Found lowest one bidder | |
| 2 | L2₹27.0 L+₹1,258.60 (0.05%)Rejected-Finance BASGO | L2 | Rejected-Finance Quoted high rates as compare to L1 bidder | |
| 3 | L3₹33.9 L+₹6.9 L (25.6%)Rejected-Finance | L3 | Rejected-Finance Quoted high rates as compare to L1 bidder | |
| 4 | L4₹36.3 L+₹9.3 L (34.5%)Rejected-Finance | L4 | Rejected-Finance Quoted high rates as compare to L1 bidder |
Tender Value
Refer Docs
EMD Value
₹77,000
Closing Date
24 Mar 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Rural Engineering Wing Leh
Construction of L/R with culvert from thangkok main bridge to khando Lungba Basgo
2021_RDD_2572_10
NIT 206 UTLeh REW of 2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
₹77,000
Yes
10 Jun 2021
15 Mar 2021
26 Mar 2021
15 Mar 2021
24 Mar 2021
15 Mar 2021
120 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Providing and laying of dry stone soling in horizontal level hand packed tightely
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size)Nallah
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1:6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Filling of stone in backfill of the wall all complete job
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 em in depth, breaking clods, ,- watering, rolling each layer with half tonne roller or wooden Lor steel rammers, and rolling every third and top -most layer with power roller of minimun 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or tilling up ground depressions lead upto 50 mtr and lift upto 1. 5 mtr. in : All kinds of soil:
carriage of cement avg lead 45KM by M.T
carriage of sand and Aggregate 20km by M.T
carriage of Stone 30km by M.T
carriage of stone soling 200mtr by H.L
carriage of backfill of the stone avg lead 5km by M.T
carriage of earth avg lead 8km by M.T
Centring and shuttermg including strutting, propping etc. and removal of form for·Foundations: footings, bases of columns etc. for mass concrete.
M/S TSEWANG PHUNCHOK
M/S STANZIN YOULOW
M/S MASOOD AHMAD GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .