District Forest Office
District Forest Officer, Vellore Forest Division, Vellore.
Maintenance of Unjamanthai Kootu (X) road to Palampattu road Km 0/000-8/000 at Amirthi Range Vellore Division during 2025-26.
2026_TNFD_663124_2
Tender Notice Ref.No. 5748 / 2024 / D1
Open Tender
Civil Works - Roads
150 days
Amirthi Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.3 L
22 Jun 2026
22 Jun 2026
22 Jul 2026
22 Jun 2026
21 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Clearing Light Jungle in all labour charges for etc., complete and as directed by the departmental engineers | 8,000 | Sqm | - | - |
| 3 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, | 4,865.03 | Sqm | - | - |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper tosite, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 1,959.31 | cum | - | - |
| 5 | Providing and laying Prime Coat over WBM / WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals formachinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 13,995.1 | Sqm | - | - |
| 6 | Providing and laying Tack Coat over WBM / WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 13,995.1 | Sqm | - | - |
| 7 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH (Rev-5BM (Grade-II) 50mm Thick Using VG30) | 708.51 | cum | - | - |
| 8 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 419.87 | cum | - | - |
| 9 | Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. | 1,233.78 | cum | - | - |
| 10 | Supply and fixing of Kilometre stone of standard design and drawing as per IRC:8-1980 (second revision),including painting and numbering etc., and all other incidental charges etc., complete. | 5 | Nos | - | - |
| 11 | Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete. | 20 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tenderdocument.pdf
Tender Documents • 0.72 MB
BOQ_820035.xls
BOQ • 0.25 MB
Tendernotice.pdf
Additional Documents • 0.73 MB
Download all tender documents and submit your bid