| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-AOC | ₹49.5 L | L1 | Accepted-AOC Less Tenderer |
| 2 | L2₹50.2 LRejected-AOC | ₹50.2 L | L2 | Rejected-AOC Above Tenderer |
| Sl No | Description | Qty | Unit | G.HARIDASS L1 | RMDCONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 145.44 | Cum | 263 ₹38,250.72 | 293 ₹42,613.92 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 48.48 | Cum | 1,736 ₹84,161.28 | 1,766 ₹85,615.68 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 216.48 | Cum | 5,357 ₹11.6 L | 5,387 ₹11.7 L |
| 4.00 | Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete. | 924.32 | Sqm | 547 ₹5.1 L | 577 ₹5.3 L |
| 5.00 | C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete. | 164.98 | Cum | 6,661 ₹11.0 L | 6,691 ₹11.0 L |
| 6.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 50.4 | Cum | 386 ₹19,454.40 | 416 ₹20,966.40 |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 25.76 | Cum | 2,475 ₹63,756 | 2,505 ₹64,528.80 |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 16.8 | Cum | 2,489 ₹41,815.20 | 2,519 ₹42,319.20 |
| 9.00 | Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 164.64 | Cum | 7,210 ₹11.9 L | 7,240 ₹11.9 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 7,55,767.83 ₹7.6 L | 7,65,257.25 ₹7.7 L |
Tender Value
Refer Docs
EMD Value
₹49,990
Closing Date
8 Dec 2025, 3:00 pmClosed
BDO (VP)
Panchayat Union Office Sriperumbudur
Providing CC Road with RCC Slab Drain to BG Road in Sirumangadu Panchayat in Sriperumbudur Panchayat Union.
2025_RDTN_627974_1
614/2025/A5 Dt.15.09.2025
Open Tender
Civil Works - Roads
90 days
Sriperumbudur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹49,990
Yes
29 Jan 2026
2 Dec 2025
8 Dec 2025
2 Dec 2025
8 Dec 2025
2 Dec 2025
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete.
C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_750752.xls
BOQ • 0.34 MB
SCHEDULE.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid