Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -41.99% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 L+₹53,010.57 (10.5%)Admitted-Finance | -35.90% | ₹5.6 L+₹53,010.57 (10.5%) | L2 | Admitted-Finance |
| 3 | L3₹7.6 L+₹2.6 L (50.8%)Admitted-Finance | -12.54% | ₹7.6 L+₹2.6 L (50.8%) | L3 | Admitted-Finance |
| 4 | L4₹8.3 L+₹3.2 L (63.8%)Admitted-Finance | -5.00% | ₹8.3 L+₹3.2 L (63.8%) | L4 | Admitted-Finance |
| 5 | L5₹8.4 L+₹3.4 L (67.2%)Admitted-Finance | -3.00% | ₹8.4 L+₹3.4 L (67.2%) | L5 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹17,400
Closing Date
11 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of protection wall near land of Vikrant Sharma, Ward no. 2, Pyt Kot Lower A Garhi Morh Block Bhalwal AC Jammu North
2026_RDPR_319309_1
e-NIT No. 378 RE WJ of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹17,400
15 Sept 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labour for Prepration of Site etc. 3 labour for 1 days | 3 | no | 553 | ₹1,659 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30
cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead
upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 92.44 | cum | 187.3 | ₹17,314.01 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.17 | cum | 4,826.5 | ₹15,300.01 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level | 107.9 | cum | 5,733.6 | ₹6,18,655.44 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 0.2 | SQM | 286.35 | ₹56.98 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for | 0.9 | SQM | 628.95 | ₹566.06 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in
layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and
watering, lead upto 50 m and lift upto 1.5 m. | 40.78 | cum | 218.4 | ₹8,906.35 |
| 8 | Carriage of Sand and Bajri by 15 KM by Mt | 151.6 | cum | 344.49 | ₹52,224.33 |
| 9 | P/F Sign board of MS steel pipes and sheet of size 2'-6"x2'-0" | 1 | no | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1058464.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .