Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2,400
Closing Date
14 Aug 2026, 11:30 amClosed
Sr.Execuitve Engineer
ES Division, Hamirpur
ESDH-10/2026-27
2026_HPSEB_140488_1
ESDH-10/2026-27
Open Tender
Civil Works
Percentage
Hamirpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹2,400
12 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Centering and shuttering including strutting, propping etc. and removal of form work for : retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1,270.52 | Kg | 102.88 | ₹1,30,711.1 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor all levels, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 1.63 | cum | 8,572.93 | ₹13,973.88 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size). | 0.57 | cum | 6,795.28 | ₹3,873.31 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 6 | sqm. | 513.2 | ₹3,079.2 |
| 5 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-inCharge. with cement mortar 1:4 (1 cement : 4 coarse sand). | 44.18 | sqm. | 349.99 | ₹15,462.56 |
| 6 | Placing of new trench covers by replacing the old damaged trench cover i/c disposing off old trench covers with all leads and lifts. | 76 | No | 56 | ₹4,256 |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within all lead as per direction of Engineer-in-charge. | 1.97 | cum | 1,212.93 | ₹2,389.47 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: in Cement mortar 1 : 4 ( 1 cement : 4 Sand ) | 2.32 | cum | 9,713.89 | ₹22,536.22 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
td.pdf
Tender Documents • 0.45 MB
BOQ_208383.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .