Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹21.5 L+₹17,099.35 (0.80%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | P. GOVINDHARAJ L1 | SIVARAJ CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.001. Strengthening of the road from Kurubarapalli - Kothakrishnapalli to Chennasandiram road Km: 0/0 - 0/5. Estimate Amount: 1790000/- | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 600 | Sqm | 6.34 ₹3,804 Lowest | 6.39 ₹3,834 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per | 90 | Cum | 139.93 ₹12,593.7 Lowest | 141.05 ₹12,694.5 |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 625 | Sqm | 23.29 ₹14,556.25 Lowest | 23.48 ₹14,675 |
| 5.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 37.5 | Cum | 340.08 ₹12,753 Lowest | 342.81 ₹12,855.38 |
| 6.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 7.00 | Km: 0/0 - 0/500 | 234.38 | Cum | 2,544.66 ₹5,96,417.41 Lowest | 2,565.08 ₹6,01,203.45 |
| 8.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 9.00 | Km: 0/0 - 0/500 | 1,875 | Sqm | 86.36 ₹1,61,925 Lowest | 87.05 ₹1,63,218.75 |
| 10.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | |||||
Tender Value
₹21.6 L
EMD Value
₹22,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT Veppanapalli Block 2 Works under DMFT 2025-2026 Strengthening of the road from Kurubarapalli to Kothakrishnapalli Road to Chennasandiram and Providing CC Road to PM Janman houses at Bettappanur Village Package NO 24 DMFT 2025-2026
2026_RDTN_652176_1
RocNo_15_2026_Mines_03_02_2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Veppanpalli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹22,000
DRDA Krishnagiri
24 Mar 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
10 Feb 2026
1. Strengthening of the road from Kurubarapalli - Kothakrishnapalli to Chennasandiram road Km: 0/0 - 0/5. Estimate Amount: 1790000/-
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for H.M. Stone
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Providing and erecting of Retro - reflectorized cautionary, Mandatory and informatory signs (without definition board) made out of higf intensity Prismatic Gradw Sheeting confirming to type - IV standards of IRC - 67: 2012 and ASTM D - 09, Specifications.
Major Road Ahead
Provision for Name Board
2. Providing Cement Concrete road to PM JANMAN houses at Bettappanur Village H/o. Chennasandiram. Estimate Amount : 370000/-
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Construction of un-reinforced , dowel jointed at expansion and construcction joint only, PCC pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade)
Provision for Writing Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_782024.xls
BOQ • 0.36 MB
TBRoads24.pdf
Tender Documents • 0.50 MB
PBRoads24.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .