Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 CrAdmitted-Finance H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | ₹2.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.3 CrAdmitted-Finance 1207 SECTOR 9 A 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹2.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Vision India Infratech L1 | M/S DDR Buildtech L2 | LAKHAN INFRA CONSTRUCTIONS PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and laying of good earth 150 MM thick soil layer in 02 times ( for fresh waste windrows ) Earth Work with a lead of 20 Km | 1,410 | cum | 336 ₹4.7 L | 350 ₹4.9 L | 600 ₹8.5 L |
| 2.00 | Analysis of rate for making house hold connection of water supply damaged during excavation | 200 | Each | 770 ₹1.5 L | 805 ₹1.6 L | 1,000 ₹2 L |
| 3.00 | Analysis of rate for making house hold connection of sewer line damaged during excavation | 200 | Each | 990 ₹2.0 L | 1,035 ₹2.1 L | 1,000 ₹2 L |
| 4.00 | Provision for making sewer connection with existing MH Complete in all respect | 2 | Job | 76,200 ₹1.5 L | 79,633 ₹1.6 L | 50,000 ₹1 L |
| 5.00 | Making water connection with existing main line complete in all respect | 2 | Each | 6,600 ₹13,200 | 6,900 ₹13,800 | 50,000 ₹1 L |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
14 May 2026, 12:00 pmClosed
Pradeep Kumar
Municipal Corporation Gurugram
PROVIDING AND LAYING RCC NP3 450MM SEWER LINE AND 100MM DIA WATER SUPPLY LINE IN VARIOUS STREETS IN VILLAGE KHANDSA WARD NO 9 DIV 1A ZONE 1 UNDER MCG.
2026_HRY_519215_1
20263C694042 92D4 4192 AD70 1991AE5E43DA285ULB
Open Tender
Civil Works
250 days
Gurugram
2 documents required · 2 mandatory
₹15,000
₹3.8 L
Yes
12 Jun 2026
2 May 2026
14 May 2026
2 May 2026
14 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of good earth 150 MM thick soil layer in 02 times ( for fresh waste windrows ) Earth Work with a lead of 20 Km | 1,410 | cum | - | - |
| 2 | Analysis of rate for making house hold connection of water supply damaged during excavation | 200 | Each | - | - |
| 3 | Analysis of rate for making house hold connection of sewer line damaged during excavation | 200 | Each | - | - |
| 4 | Provision for making sewer connection with existing MH Complete in all respect | 2 | Job | - | - |
| 5 | Making water connection with existing main line complete in all respect | 2 | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_598109.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid