Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
Closing Date
24 Jan 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex Engineer REW Bandipora
Ex Engineer REW Bandipora
Construction of culvert Connecting orchard with Ab Razak Wagay Solinar
2022_RDPR_157263_1
E NIT 69
Open Tender
Civil Works
Item Rate
bandipora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Rural Development and Panchayati Raj
Exempted
25 Jan 2022
17 Jan 2022
25 Jan 2022
17 Jan 2022
24 Jan 2022
17 Jan 2022
120 days
Amount
Earth work in bulk excavation by mechanical means(hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (exceeding 30 cms in depth, 1.5 mtr in width as well as 10.0 sqm on plan) including disposal of surplus excavated earth as directed by Engineer-in-charge (incl dewatering if required): All kinds of soil :
P/L of quarry stone soling hand packed including ramming, watering & filling of interstices all costs and carriages involvedCOMPLETE
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all carriages costs of material involved with 20% plum
P/L of in position reinforcement cement concreteof specified grade including curing but excluding the cost of centring and shuttering all works upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages and cost of Materials involved
Centring and shuttering including strutting,propping etc and removal of form forFoundations: footings,bases of columns etc for mass concrete strip raft for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete. Thermo-Mechanically Treated bars of grade Fe-450D Including all carriages and costs COMPLETE
Providing , installation and fabrication of sign Board 3'x2' ( 2MM) M.S sheet mounted on Angle Iron frame 50 x50 x6 mm 5 feet height embeded in cement concrete 1:2:4
abdul razak rather
RIYAZ AHMAD RESHI
khurshid ahmad wagay
SHOWKAT AHMAD WANI
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .