Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.6 LAccepted-AOC 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | L1 | Accepted-AOC successful tenderer |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
27 Feb 2024, 12:00 pmClosed
THE SUPERINTENDING ENGINEER CIVIL DISTRIBUTION
Office of the Superintending Engineer/ Civil Distribution, 4th Floor, Western wing, N. P. K. R. R. Maligai, No.144, Anna salai, Chennai-2.
Replacement of 1 No lift 20 persons capacity, functioning for the use of VIP at the Eastern wing of NPKRR Maaligai in TNEB Headquarters complex with new lift of 20 passenger capacity 1360 Kg in the existing lift well including AMC for 2 years beyond
2024_EB_409412_2
SE/C/Dist./ 39/ 2023-24
Open Tender
Electrical Works
Item Rate
120 days
Chennai
As per Specification
4 documents required · 4 mandatory
₹0
₹37,000
Yes
8 Nov 2024
21 Feb 2024
28 Feb 2024
21 Feb 2024
27 Feb 2024
21 Feb 2024
Amount
Supply , erection, testing, commissioning of 20 passenger (1360 kg ) gearless machine room elevator with VF Regenerative drive , speed not less than 1.75 mps, automatic rescue device, stainless steel hairline finish car, fully automatic Door as per the Specification, in the Eastern wing of NPKRR Maaligai from Ground floor to tenth floor (11 landings) after dismantling of the existing lift of Twenty persons capacity including civil works for smooth finishing inside lift well, electrical works, cost of all materials, labour, scaffolding, lead, lift, T&P, transportation charges, etc. complete as per specification and direction of Engineer -in - charge.and including maintenance of lift during the guarantee period of one year.The passenger lifts shall confirm to the specification stipulated and shall be of standard make of OTIS/KONE/ MITSUBISHI/SCHINDLER/JOHNSON.
Annual Maintenance Charges for the lift for a period of two years beyond the guarantee period of one year.
Description of Work / Item(s)
Amount
Supply , erection, testing, commissioning of 20 passenger (1360 kg ) gearless machine room elevator with VF Regenerative drive , speed not less than 1.75 mps, automatic rescue device, stainless steel hairline finish car, fully automatic Door as per the Specification, in the Eastern wing of NPKRR Maaligai from Ground floor to tenth floor (11 landings) after dismantling of the existing lift of Twenty persons capacity including civil works for smooth finishing inside lift well, electrical works, cost of all materials, labour, scaffolding, lead, lift, T&P, transportation charges, etc. complete as per specification and direction of Engineer -in - charge.and including maintenance of lift during the guarantee period of one year.The passenger lifts shall confirm to the specification stipulated and shall be of standard make of OTIS/KONE/ MITSUBISHI/SCHINDLER/JOHNSON.
Buy back for existing old lift
Description of Work / Item(s)
Amount
Annual Maintenance Charges for the lift for the first year beyond the guarantee period of one year.
Annual Maintenance Charges for the lift for the second year beyond the guarantee period of one year.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .