Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Finance 1ST FLOOR PUSHPANJALI COMPLEX CINEMA ROAD SHAHI MARKET GORAKHPUR U P | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | L1 | Admitted-Finance | ||
| 2 | L2₹18.1 L+₹1.0 L (5.89%)Admitted-Finance 131 BASANT VIHAR NAUBASTA KANPUR NAGAR UTTAR PRADESH 208021 | KANPUR NAGAR | UTTAR PRADESH | 208021 | L2 | Admitted-Finance | ||
| 3 | L3₹18.9 L+₹1.8 L (10.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹20.0 L+₹3.0 L (17.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹20.1 L+₹3.0 L (17.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹40,169
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward sankhya 38 Kanha upvan Nagar mein gaushala ke nikat Shiv Mandir wale park ka Soundarya Karan.
2026_DOLBU_1162655_1
FFC Ward 38 sn 39
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹40,169
8 Oct 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
27 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling old plasterin all complete . | - | Sqm | 29 | - |
| 1.02 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI No.692 | 1 | cum | 400 | ₹399.6 |
| 1.03 | Cleaning of site And cleaning of dismental material in all complete | - | Nos | 330 | - |
| 1.04 | Excavation of foundationof ordinary soil | - | cum | 120 | - |
| 1.05 | P/L of PCC 1:6:12 brick ballast | 1 | cum | 4,007 | ₹4,002.99 |
| 1.06 | M 150 class A b/W 1;4 in all complete of work | - | cum | 5,817 | - |
| 1.07 | 12mm thick plaster with cement and c/sand in 1:4 over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & Plants etc. required for proper completion of the work. (S.I-584) | 1 | Sqm | 159 | ₹158.84 |
| 1.08 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR- 13.80 | 1 | Sqm | 113 | ₹112.89 |
| 1.09 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade. Including supply of all material, labour and T & P etc required for proper completion of the work Sl No.- 660+661 | 1 | Sqm | 92 | ₹91.91 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.36 MB
BOQ_2179271.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .