Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | L1 | Admitted-Finance | |
| 2 | L2₹7.0 L+₹1.4 L (24.2%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Anil Kumar L1 | M/s CHANDRA PAL SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting. | 1,000 | Sqm | 3.56 ₹3,560 | 2 ₹2,000 Lowest |
| 2.00 | Removing earth diposited on steps on ghat including lift up to 1.5 m. and lead up to 30 m. by manual labour . The earth from clearance to be used in side embankment or to be disposed off on spoil banks complete as directed by engineer in charge | 84 | Cum | 44.6 ₹3,746.4 Lowest | 80 ₹6,720 |
| 3.00 | Dismantling existing plaster including disposal of refuse with in distance of 60 meters. | 20 | Sqm | 18.65 ₹373 Lowest | 100 ₹2,000 |
| 4.00 | Earth work in excavation of foundation in all type of soil with initial lead and lift i/c all cost of labour, T&P etc complete | 25 | Cum | 81.1 ₹2,027.5 | 70 ₹1,750 Lowest |
| 5.00 | C.C. 1:3:6 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour
,materials ,T&P etc.for proper completion of work. | 12.2 | Cum | 5,058.19 ₹61,709.92 | 4,500 ₹54,900 Lowest |
| 6.00 | 1st class brick work in 1:4 in cement mortar including all cost of labour ,materials ,T&P etc.for proper completion of work. | 65 | Cum | 4,563.99 ₹2,96,659.35 Lowest | 7,000 ₹4,55,000 |
| 7.00 | C.C. 1:2:4 in ordinary work including all costof labour, material, T&P etc. for proper completion of work | 8.5 | Cum | 5,414.9 ₹46,026.65 Lowest | 7,000 ₹59,500 |
| 8.00 | Centering & shuttering for R.C.C including all cost of labour ,T&P etc.for proper completion of work. | 68 | Sqm | 466.32 ₹31,709.76 Lowest | 500 ₹34,000 |
| 9.00 | 12 mm thick cement plaster with 1:4 cement mortar including all costof labour ,materials ,T&P etc.for proper completion of work. | 220 | Sqm | 144.25 ₹31,735 Lowest | 200 ₹44,000 |
| 10.00 | Earth work in repairing of damage bank of canal including proper ramming and dressing with lead up to 1km and all lift including all cost of labour ,T&P etc. | 460 | Cum | 145.98 ₹67,150.8 | 70 ₹32,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹68,000
Closing Date
4 Jun 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
IRRIGATION DIVISION FIROZABAD
Repairing and Painting of V.R.B, Ghat and Inlet structure of Kanpur Stump at km. 33.200.
2026_UPIDC_1141213_15
01/EE/2026-27
Open Tender
Civil Works
Item Wise
20 days
Repairing and Painting of V.R.B, Ghat and Inlet st
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹68,000
17 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick bushes and thorny jungle without uprooting. | 1,000 | Sqm | - | - |
| 2 | Removing earth diposited on steps on ghat including lift up to 1.5 m. and lead up to 30 m. by manual labour . The earth from clearance to be used in side embankment or to be disposed off on spoil banks complete as directed by engineer in charge | 84 | Cum | - | - |
| 3 | Dismantling existing plaster including disposal of refuse with in distance of 60 meters. | 20 | Sqm | - | - |
| 4 | Earth work in excavation of foundation in all type of soil with initial lead and lift i/c all cost of labour, T&P etc complete | 25 | Cum | - | - |
| 5 | C.C. 1:3:6 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour
,materials ,T&P etc.for proper completion of work. | 12.2 | Cum | - | - |
| 6 | 1st class brick work in 1:4 in cement mortar including all cost of labour ,materials ,T&P etc.for proper completion of work. | 65 | Cum | - | - |
| 7 | C.C. 1:2:4 in ordinary work including all costof labour, material, T&P etc. for proper completion of work | 8.5 | Cum | - | - |
| 8 | Centering & shuttering for R.C.C including all cost of labour ,T&P etc.for proper completion of work. | 68 | Sqm | - | - |
| 9 | 12 mm thick cement plaster with 1:4 cement mortar including all costof labour ,materials ,T&P etc.for proper completion of work. | 220 | Sqm | - | - |
| 10 | Earth work in repairing of damage bank of canal including proper ramming and dressing with lead up to 1km and all lift including all cost of labour ,T&P etc. | 460 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.92 MB
BOQ_2163670.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .