| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 CrAccepted-AOC 35 B BHERU VILLAS SARDAR CLUB SCHEME AIR FORCE JODHPUR 342 011 | JODHPUR | JODHPUR | RAJASTHAN | 342011 | ₹28.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹28.5 Cr+₹28.2 L (1.00%)Rejected-Finance | ₹28.5 Cr+₹28.2 L (1.00%) | L2 | Rejected-Finance Not being the lowest tender |
| 3 | L3₹30.9 Cr+₹2.6 Cr (9.25%)Rejected-Finance K 99 LGF KALKAJI NEW DELHI 110 019 | NEW DELHI | NEW DELHI | DELHI | 110019 | ₹30.9 Cr+₹2.6 Cr (9.25%) | L3 | Rejected-Finance Not being the lowest tender |
| 4 | L4₹31.2 Cr+₹2.9 Cr (10.4%)Rejected-Finance L 87 STREET NO 7C MAHIPALPUR EXTENSION NEW DELHI 110037 | NEW DELHI | NEW DELHI | DELHI | 110037 | ₹31.2 Cr+₹2.9 Cr (10.4%) | L4 | Rejected-Finance Not being the lowest tender |
| 5 | L5₹32.0 Cr+₹3.7 Cr (13.3%)Rejected-Finance | ₹32.0 Cr+₹3.7 Cr (13.3%) | L5 | Rejected-Finance Not being the lowest tender |
| Sl No | Description | Qty | Unit | DES RAJ AND SONS BUILDERS PVT LTD L7 | SHRI GURMUKHDAS CONTRACTORS PVT. LTD. L6 | SOOD ASSOCIATES PVT LTD L3 | DHARIWAL TRADERS PRIVATE LIMITED L5 | RAGHUSONS INFRA ENGINEERING PVT. LTD L1 | NSC Projects Pvt. Ltd. L4 | M/S Kubera Corporates Private Limited L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I - BUILDINGS & STRUCTURES INCLUDING INTERNAL AS DEFINED IN ANNEXURE I TO IX (EPC) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only. | ||||||||||
| 1.10 | Engineering, Procurement & Construction (EPC) of following buildings/structures as per GRIHA norms including all internal services and external services (except Sch 'A' Part II to VII) as defined in Annexure-I to IX, complete as detailed in scope of work and other documents of tender, complete all as specified and directed :- | 1 | Lump sum | 33,36,69,300 ₹33,36,69,300 | 33,21,11,000 ₹33,21,11,000 | 28,85,77,777 ₹28,85,77,777 | 30,07,00,000 ₹30,07,00,000 | 26,16,81,458.02 ₹26,16,81,458.02 | 29,15,15,000 ₹29,15,15,000 | 26,00,00,000 ₹26,00,00,000 Lowest |
| 1.11(i) Site clearance and development. (ii) Single living Accn for sailors (G + 3 ) with Permanent Specification incl. Common room, Study room & Store room with internal services all as specified, RCC framed construction, aluminium joinery, WPT, etc. complete all as shown on drgs. (iii) Covered parking shed with Permanent Specification with internal services, RCC framed contruction, WPT etc complete all as shown on drgs. (iv)Dining hall, Ante room for sailors with Permanent Specification complete all as shown on drgs. incl. internal services all as specified, RCC framed contruction, alumirtium joinery, WPT, etc. complete. (v) Lightening Protection (vi) Fire Fighting (vii) RCC terrace water tank. (viii) Green bldg. norms. | ||||||||||
| 1.20NOTE: Schedule ‘A’ Part II to VII items which are Prepriced by MES, Bidders shall insert their lumpsum amount in the blue coloured field under Col-6 only. | ||||||||||
| 2.00 | SCHEDULE "A" PART-II (EXCAVATION & EARTHWORK)
Total of Sch-'A' Part-II B/F | 1 | Lump sum | 8,54,232.51 ₹8,54,232.51 | 8,75,000 ₹8,75,000 | 8,94,879.44 ₹8,94,879.44 | 8,13,200 ₹8,13,200 | 6,45,057.13 ₹6,45,057.13 Lowest | 8,25,000 ₹8,25,000 | 13,50,000 ₹13,50,000 |
| 3.00 | SCHEDULE "A" PART-III (ROADS / PATHS / CULVERT / HARDSTANDING)
Total of Sch-'A' Part-III B/F | 1 | Lump sum | 29,25,005.38 ₹29,25,005.38 | 30,75,000 ₹30,75,000 | 30,45,398.23 ₹30,45,398.23 | 27,19,077 ₹27,19,077 Lowest | 32,77,958.5 ₹32,77,958.5 | 28,50,000 ₹28,50,000 | 38,81,000 ₹38,81,000 |
| 4.00 | SCHEDULE "A" PART-IV (EXTERNAL WATER SUPPLY)
Total of Sch-'A' Part-IV B/F | 1 | Lump sum | 1,80,542.13 ₹1,80,542.13 | 1,68,000 ₹1,68,000 | 1,69,512.61 ₹1,69,512.61 | 1,64,977 ₹1,64,977 | 2,09,218.14 ₹2,09,218.14 | 1,75,000 ₹1,75,000 | 93,700 ₹93,700 Lowest |
| 5.00 | SCHEDULE "A" PART-V (EXTERNAL ELECTRIC SUPPLY)
Total of Sch-'A' Part-V B/F | 1 | Lump sum | 39,13,144.64 ₹39,13,144.64 | 40,51,000 ₹40,51,000 | 36,40,279.27 ₹36,40,279.27 Lowest | 40,97,777 ₹40,97,777 | 42,98,983.13 ₹42,98,983.13 | 50,00,000 ₹50,00,000 | 41,50,000 ₹41,50,000 |
| 6.00 | SCHEDULE "A" PART-VI (SEWAGE DISPOSAL)
Total of Sch-'A' Part-VI B/F | 1 | Lump sum | 9,72,914.04 ₹9,72,914.04 | 9,15,000 ₹9,15,000 | 9,44,866.21 ₹9,44,866.21 | 8,57,777 ₹8,57,777 | 7,43,989.14 ₹7,43,989.14 Lowest | 9,20,000 ₹9,20,000 | 10,62,000 ₹10,62,000 |
| 7.00 | SCHEDULE "A" PART-VII (AREA DRAINAGE)
Total of Sch-'A' Part-VII B/F | 1 | Lump sum | 18,82,987.02 ₹18,82,987.02 | 17,21,000 ₹17,21,000 Lowest | 18,19,783.78 ₹18,19,783.78 | 17,97,777 ₹17,97,777 | 17,38,167.45 ₹17,38,167.45 | 19,00,000 ₹19,00,000 | 26,87,500 ₹26,87,500 |
Tender Value
₹28 Cr
EMD Value
₹15 L
Closing Date
12 Dec 2025, 6:00 pmClosed
Chief Engineer (Navy) Mumbai
HQ Chief Engineer (Navy) Mumbai, Shahid Bhagat Singh Marg, Colaba, Mumbai - 400 005
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF DEFICIENT SINGLE LIVING ACCOMMODATION FOR 260 SAILORS (G PLUS 3F) AT INS KADAMBA, KARWAR
2025_MES_738535_1
87945/E8
Open Tender
Civil Works
Works
639 days
INS KADAMBA, KARWAR
As per NIT
10 documents required · 10 mandatory
₹3,000
GE (SB) Karwar
₹15 L
Yes
HQ Chief Engineer (Navy) Mumbai
16 Apr 2026
7 Nov 2025
15 Dec 2025
7 Nov 2025
12 Dec 2025
5 Dec 2025
7 Nov 2025 - 21 Nov 2025
22 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE 'A' PART-I - BUILDINGS & STRUCTURES INCLUDING INTERNAL AS DEFINED IN ANNEXURE I TO IX (EPC) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only. | |||||
| 1.1 | Engineering, Procurement & Construction (EPC) of following buildings/structures as per GRIHA norms including all internal services and external services (except Sch 'A' Part II to VII) as defined in Annexure-I to IX, complete as detailed in scope of work and other documents of tender, complete all as specified and directed :- | 1 | Lump sum | - | - |
| 1.11 | (i) Site clearance and development.
(ii) Single living Accn for sailors (G + 3 ) with Permanent Specification incl. Common room, Study room & Store room with internal services all as specified, RCC framed construction, aluminium joinery, WPT, etc. complete all as shown on drgs.
(iii) Covered parking shed with Permanent Specification with internal services, RCC framed contruction, WPT etc complete all as shown on drgs.
(iv)Dining hall, Ante room for sailors with Permanent Specification complete all as shown on drgs. incl. internal services all as specified, RCC framed contruction, alumirtium joinery, WPT, etc. complete.
(v) Lightening Protection
(vi) Fire Fighting
(vii) RCC terrace water tank.
(viii) Green bldg. norms. | - | - | - | - |
| 2 | SCHEDULE "A" PART-II (EXCAVATION & EARTHWORK)
Total of Sch-'A' Part-II B/F | 1 | Lump sum | 10,78,168 | ₹10,78,168 |
| 3 | SCHEDULE "A" PART-III (ROADS / PATHS / CULVERT / HARDSTANDING)
Total of Sch-'A' Part-III B/F | 1 | Lump sum | 28,46,166.57 | ₹28,46,166.57 |
| - | SCHEDULE "A" PART-IV (EXTERNAL WATER SUPPLY)
Total of Sch-'A' Part-IV B/F | 1 | Lump sum | 74,675.16 | ₹74,675.16 |
| - | SCHEDULE "A" PART-V (EXTERNAL ELECTRIC SUPPLY)
Total of Sch-'A' Part-V B/F | 1 | Lump sum | 31,11,349.8 | ₹31,11,349.8 |
| - | SCHEDULE "A" PART-VI (SEWAGE DISPOSAL)
Total of Sch-'A' Part-VI B/F | 1 | Lump sum | 7,43,989.14 | ₹7,43,989.14 |
| - | SCHEDULE "A" PART-VII (AREA DRAINAGE)
Total of Sch-'A' Part-VII B/F | 1 | Lump sum | 19,56,756.75 | ₹19,56,756.75 |
| - | SCHEDULE "A" PART-VIII (COMPOUND WALL AND STEEL GATE)
Total of Sch-'A' Part-VIII B/F | 1 | Lump sum | 23,60,272.28 | ₹23,60,272.28 |
stage.html
html • 0.07 MB
technical_826954.pdf
techsummary_826954.pdf
finance_826954.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
87945_Arch_Drawings.pdf
Tender Documents • 9.03 MB
87945_Furniture_Drawings.pdf
Tender Documents • 1.30 MB
87945-Structural-General-Notes.pdf
Tender Documents • 0.58 MB
BOQ_826954.xls
BOQ • 0.33 MB
87945_Tender_Pages_06_Nov_2025.pdf
Tender Documents • 3.09 MB
87945_Revised_Soil_Investigation_Report.pdf
Tender Documents • 22.06 MB
87945_CFEES_Report.pdf
Tender Documents • 1.12 MB
87945_Schedule_06_Nov_2025.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .