Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.9 LAdmitted-Finance | -25.95% | ₹32.9 L | L1 | Admitted-Finance |
| 2 | L2₹36.0 LAdmitted-Finance | -18.99% | ₹36.0 L | L2 | Admitted-Finance |
| 3 | L2₹36.0 LAdmitted-Finance | -18.99% | ₹36.0 L | L2 | Admitted-Finance |
Tender Value
₹44.5 L
EMD Value
₹88,920
Closing Date
28 Mar 2026, 6:00 pmClosed
Er Karanjeet Singh
Executive Engineer PWD RandB Division Gandhi Nagar Jammu
Please refer to BOQ
2026_PWDJK_306541_1
Short e-NIT No. DGN/196 of 2025-26 Dated 20-03-2026
Open Tender
Civil Works
120 days
Kala Kendra Bikram Chowk Jammu
Please refer to e-NIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division Gandhi Nagar
₹88,920
Jammu
6 Apr 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | |||||
| 2Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge. | |||||
| 3Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge in cement mortar. | |||||
| 4Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge. 1:3:6 or richer mix (i/c equivalent design mix). | |||||
| 5Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge. 1:4:8 or leaner mix (i/c equivalent design mix). | |||||
| 6Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kind of soils. Rate for a lead upto 1 meter from cutting edge. | |||||
| 7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | |||||
| 8Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | |||||
| 9Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | |||||
| 10Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_995274.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid