| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-Finance | ₹9.4 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹9.5 L+₹2,846.32 (0.30%)Rejected-Finance | ₹9.5 L+₹2,846.32 (0.30%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹9.5 L+₹3,795.10 (0.40%)Rejected-Finance | ₹9.5 L+₹3,795.10 (0.40%) | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹9.5 L
EMD Value
₹94,878
Closing Date
14 Aug 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Repair work on the damage dot nala located opposite Moti Gift Store (106/11) in gandhinagar under Ward-49,Zone-04.
2026_NNKAN_1175391_1
323/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-49
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹94,878
7 Sept 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Barricating with ropes, ballies and bamboos etc all complete. Barricating with ropes, ballies and bamboos etc all complete. | 32 | rmt | 50 | ₹1,600 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202-Bituminous Courses | 9.6 | cum | 880 | ₹8,448 |
| 3 | Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal of unservicable material within a lead of 50m as per rate | 8.8 | sqm | 11 | ₹96.8 |
| 4 | E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.lncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 66 | cum | 215 | ₹14,190 |
| 5 | Earth Work-Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 3.00-4.50Rmt) Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 3.00-4.50Rmt) | 66 | cum | 269 | ₹17,754 |
| 6 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 3.00-4.50Rmt) Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 3.00-4.50Rmt) | 66 | cum | 323 | ₹21,318 |
| 7 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 4.50-6.00Rmt) Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 4.50-6.00Rmt) | 66 | cum | 377 | ₹24,882 |
| 8 | Desilting Of Covered Nala Including . etc all complete. Desilting Of Covered Nala Including . etc all complete. | - | cum | 200 | - |
| 9 | Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. | 100 | hours | 228 | ₹22,800 |
| 10 | Suggestiv Empty Bag Filling by Sand. Supply and Laying of sandy earth plastic cement bags (volume 0.035cum) including cost of earth , cost of empty bags , labour , stitching with sutely complete , laying and placing complete at the place of restoration of Embankment. | 200 | bags | 40 | ₹8,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2208822.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2208822.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .