Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.3 LAccepted-AOC | ₹69.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹70.0 LRejected-AOC | ₹70.0 L | L2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | PVR DEVELOPERS AND BUILDERS L1 | Thirumalai Construction L2 |
|---|---|---|---|---|---|
| 1.00Vellore District Strengthening of the Road from AP Road to Veladumalai in Genganallore Panchayat Km 0/0 - 1/600, Anaicut Block (R-428) NABARD 2026-2027 scheme, package no 04 | |||||
| 2.00Strengthening of the Road from AP Road to Veladumalai in Genganallore Panchayat Km 0/0 - 1/600, Anaicut Block (R-428) | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete | 1,536 | sqm | 6.36 ₹9,768.96 | 6.43 ₹9,876.48 |
| 4.00 | Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 300 | sqm | 23.35 ₹7,005 | 23.6 ₹7,080 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 114.75 | cum | 340.86 ₹39,113.69 | 344.55 ₹39,537.11 |
| 6.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 306 | cum | 140.39 ₹42,959.34 | 141.91 ₹43,424.46 |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 90 | cum | 2,688.65 ₹2.4 L | 2,717.7 ₹2.4 L |
| 8.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | 900 | sqm | 86.41 ₹77,769 | 87.34 ₹78,606 |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete | 900 | sqm | 20.2 ₹18,180 | 20.42 ₹18,378 |
| 10.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 5,782.5 | sqm | 34.31 ₹2.0 L | 34.68 ₹2.0 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
23 Feb 2026, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA VELLORE
THE PROJECT DIRECTOR DRDA VELLORE
Vellore District Strengthening of the Road from AP Road to Veladumalai in Genganallore Panchayat Km 0/0 - 1/600, Anaicut Block (R-428) NABARD 2026-2027 scheme, package no 04
2026_RDTN_657339_1
A7/522/2026
Open Tender
Civil Works
180 days
Anaicut Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹75,000
20 Mar 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
Vellore District Strengthening of the Road from AP Road to Veladumalai in Genganallore Panchayat Km 0/0 - 1/600, Anaicut Block (R-428) NABARD 2026-2027 scheme, package no 04
Strengthening of the Road from AP Road to Veladumalai in Genganallore Panchayat Km 0/0 - 1/600, Anaicut Block (R-428)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for H.M. stone
Provision for K.M. stone
60 cm Equilateral triangle cautionary signboard
Provision for Metal crash Barrier
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 0.36 MB
Tendernotice_3.pdf
PDF • 0.28 MB
BOQ_788356.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid