| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC L1 lowest bidder |
| 2 | L2₹11.1 L+₹1.5 L (16.0%)Rejected-AOC 4TH FLOOR N 1 289 NEAR SWAPNESWAR TEMPLE IRC VILLAGE BHUBANESWAR NAYAPALLI KHURDA KHORDHA ODISHA 751015 INDIA | KHORDHA | ODISHA | 751015 | ₹11.1 L+₹1.5 L (16.0%) | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹11.9 L+₹2.3 L (23.9%)Rejected-AOC | ₹11.9 L+₹2.3 L (23.9%) | L3 | Rejected-AOC L3 bidder |
| 4 | L4₹12.3 L+₹2.7 L (28.2%)Rejected-AOC | ₹12.3 L+₹2.7 L (28.2%) | L4 | Rejected-AOC L4 bidder |
| Sl No | Description | Qty | Unit | SABITA ENTERPRISES PROP. BISMAYA RANJAN SAMANTASINGHAR L3 | PUSPITA MANGARAJ L4 | Seventhavenue Eventz Pvt Ltd L2 | KRISHNA PAKSHI MAKERS PRO.RABINDRA KUMAR SUNDARAY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | CIVIL WORK:-
Providing Temporary barricading on hire charges basis such as digging holes to a depth of 0.45 mtr. in all kind of soil and fixing bullah of 150mm thick @1.5 mtr. center to center vertically and firmly binding horizontally three row of bamboos to bullah with coir rope, white washing two coats to bullah and bamboos including carriage of bullah and bamboos to site for barricading and dismantling the same after completion of the programme including cost of all materials sundries and T&P etc. all complete. | 1,350.5 | rm | 226 ₹3,05,213 | 227 ₹3,06,563.5 | 64.17 ₹86,661.59 Lowest | 100 ₹1,35,050 |
| 2.00 | Supply of Labour required for clearing the ground including watch and ward the barricadings including cost of all Labour, T&P etc. complete as per direction of the Engineer-in-charge. | 40 | nos | 462 ₹18,480 | 465 ₹18,600 | 545 ₹21,800 | 300 ₹12,000 Lowest |
| 3.00 | Hire charges for Providing supplying fitting fixing of temporary iron frame and wooden top dias for hoisting of national flag including dismentaling the same after completion of event and removing the all materials from the site as per instruction of Engineer -In-Charge. | 1,280.41 | Sft | 40 ₹51,216.4 | 43 ₹55,057.63 | 32 ₹40,973.12 Lowest | 40 ₹51,216.4 |
| 4.00 | Hire charges for Providing, fitting, fixing of decorative false celling with top convering by tarplastic including wooden / iron frame work for the VIP area and press etc. complete including cost of all materials, Labour, T&P etc. complete and dismentaling the same after completion of event and removing the all materials from the site as per direction of the Engineer-in-charge. | 7,652.96 | Sft | 18 ₹1,37,753.28 | 16 ₹1,22,447.36 Lowest | 28.54 ₹2,18,415.48 | 25 ₹1,91,324 |
| 5.00 | Hire charges for Providing, fitting, fixing of Decorative Cloth walling including wooden / iron frame work for VIP area and press including cost of all materials, Labour, T&P etc. complete including cost of all materials, Labour, T&P etc. complete and dismentaling the same after completion of event and removing the all materials from the site as per direction of the Engineer-in-charge. | 8,581.38 | Sft | 13 ₹1,11,557.94 | 15 ₹1,28,720.7 | 43.87 ₹3,76,465.14 | 5 ₹42,906.9 Lowest |
| 6.00 | Hire charges for Providing and laying synthetic carpet over stage and VIP path etc. complete including cost of all materials, Labour, T&P etc. complete and removing the same after completion of event from the site as per direction of the Engineer-in-charge. | 8,284.07 | Sft | 10 ₹82,840.7 | 12 ₹99,408.84 | 6.98 ₹57,822.81 | 5 ₹41,420.35 Lowest |
| 7.00 | Hire charges for Providing and fixing of Decorative Entrance gates etc. complete including cost of all materials, Labour, T&P etc. complete and dismentaling the same after completion of event and removing the all materials from the site as per direction of the Engineer-in-charge. | 3 | nos | 15,000 ₹45,000 | 16,000 ₹48,000 | 17,680 ₹53,040 | 5,000 ₹15,000 Lowest |
| 8.00 | Hire charges for Providing, placing and setting of Teapoy with cloth on top etc. complete and removing the same after completion of event as per direction of the Engineer-in-charge. | 15 | set | 170 ₹2,550 | 160 ₹2,400 Lowest | 251.87 ₹3,778.05 | 200 ₹3,000 |
| 9.00 | Hire charges for Providing, placing VIP chairs (Stainless steel) including cost of all materials, Labour, T&P etc. complete and removing the same after completion of event as per direction of the Engineer-in-charge. | 215 | nos | 200 ₹43,000 | 180 ₹38,700 | 30.77 ₹6,615.55 | 30 ₹6,450 Lowest |
| 10.00 | Hire charges for Providing, placing VIP Sofa (stainless steel) including cost of all materials, Labour, T&P etc. complete as per direction of the Engineer-in-charge. | 15 | nos | 500 ₹7,500 | 600 ₹9,000 | 642.81 ₹9,642.15 | 200 ₹3,000 Lowest |
Tender Value
₹11.6 L
EMD Value
₹11,700
Closing Date
10 Aug 2026, 3:30 pmClosed
SE RANDB KHURDA
O/o the SUPERINTENDING Engineer R and B Division, Khurda
Providing arrangements for celebration of District level of 15th August indepedency day at BJB high school ground, Khordha
2026_EICCL_138081_1
QCN-01-26-27
Open Tender
Civil Works - Roads
Item Rate
3 days
Khordha
2 documents required · 2 mandatory
₹6,000
₹11,700
Yes
19 Aug 2026
5 Aug 2026
10 Aug 2026
5 Aug 2026
10 Aug 2026
5 Aug 2026
5 Aug 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK:-
Providing Temporary barricading on hire charges basis such as digging holes to a depth of 0.45 mtr. in all kind of soil and fixing bullah of 150mm thick @1.5 mtr. center to center vertically and firmly binding horizontally three row of bamboos to bullah with coir rope, white washing two coats to bullah and bamboos including carriage of bullah and bamboos to site for barricading and dismantling the same after completion of the programme including cost of all materials sundries and T&P etc. all complete. | 1,350.5 | rm | 228.1 | ₹3,08,049.05 |
| 2 | Supply of Labour required for clearing the ground including watch and ward the barricadings including cost of all Labour, T&P etc. complete as per direction of the Engineer-in-charge. | 40 | nos | 472 | ₹18,880 |
| 3 | Hire charges for Providing supplying fitting fixing of temporary iron frame and wooden top dias for hoisting of national flag including dismentaling the same after completion of event and removing the all materials from the site as per instruction of Engineer -In-Charge. | 1,280.41 | Sft | 40 | ₹51,216.4 |
| 4 | Hire charges for Providing, fitting, fixing of decorative false celling with top convering by tarplastic including wooden / iron frame work for the VIP area and press etc. complete including cost of all materials, Labour, T&P etc. complete and dismentaling the same after completion of event and removing the all materials from the site as per direction of the Engineer-in-charge. | 7,652.96 | Sft | 18 | ₹1,37,753.28 |
| 5 | Hire charges for Providing, fitting, fixing of Decorative Cloth walling including wooden / iron frame work for VIP area and press including cost of all materials, Labour, T&P etc. complete including cost of all materials, Labour, T&P etc. complete and dismentaling the same after completion of event and removing the all materials from the site as per direction of the Engineer-in-charge. | 8,581.38 | Sft | 13 | ₹1,11,557.94 |
| 6 | Hire charges for Providing and laying synthetic carpet over stage and VIP path etc. complete including cost of all materials, Labour, T&P etc. complete and removing the same after completion of event from the site as per direction of the Engineer-in-charge. | 8,284.07 | Sft | 10 | ₹82,840.7 |
| 7 | Hire charges for Providing and fixing of Decorative Entrance gates etc. complete including cost of all materials, Labour, T&P etc. complete and dismentaling the same after completion of event and removing the all materials from the site as per direction of the Engineer-in-charge. | 3 | nos | 15,000 | ₹45,000 |
| 8 | Hire charges for Providing, placing and setting of Teapoy with cloth on top etc. complete and removing the same after completion of event as per direction of the Engineer-in-charge. | 15 | set | 170 | ₹2,550 |
| 9 | Hire charges for Providing, placing VIP chairs (Stainless steel) including cost of all materials, Labour, T&P etc. complete and removing the same after completion of event as per direction of the Engineer-in-charge. | 215 | nos | 200 | ₹43,000 |
| 10 | Hire charges for Providing, placing VIP Sofa (stainless steel) including cost of all materials, Labour, T&P etc. complete as per direction of the Engineer-in-charge. | 15 | nos | 500 | ₹7,500 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.73 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_604881.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .