Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.8 LAccepted-AOC GRAM JHAPARA TEHSIL JASRANA JANPAD FIROZABAD UTTAR PRADESH | FIROZABAD | UTTAR PRADESH | ₹67.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹67.9 LRejected-Finance AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | ₹67.9 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Finance M M I G B 96 RAMGANGA VIHAR PHASE 2 MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | - | - | Not Admitted-Finance Others-Bid capacity not completed for amount 97 lakh |
| 4 | Rejected-Technical | - | - | Rejected-Technical All technical document is not complete |
| Sl No | Description | Qty | Unit | M/S R.V.S. CONTRACTOR L1 | M/S RIDAM ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Heavy jungle clearance including cutting elephant grass and throny bushesin tarai including disposal beyond 30m. | 4,940 | M2 | 5 ₹24,700 | 4 ₹19,760 |
| 1.02 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers. Including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 mdistance as directed by the Engineer-in-charge | 968 | M3 | 30 ₹29,040 | 50 ₹48,400 |
| 1.03 | Earth work in embankment By Power Transported earth With a Lead Beyond 200 M and Upto 600m including excavation ,loading , unloading ,ramming, manual compaction, dressing and all lift etc. complete. | 1,056 | M3 | 100 ₹1.1 L | 130 ₹1.4 L |
| 1.04 | Supply ,Filling and Laying HDPE bags made of 95 GSM of size 48 cmx 75 cm & filling with earth/RBM/Sand & sewing with G.E.O. materials with mic. and placing in position i/c all cost of material, labour, T&P, etc required for proper completion of work.but Excluding GST. | 1,03,884 | Nos | 19 ₹19.7 L | 16 ₹16.6 L |
| 1.05 | Supply ,Laying and packing 20-40 kg.boulder in G.I wire crate size (1.50x1.50x0.45)m including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge. | 873 | Nos | 3,100 ₹27.1 L | 3,350 ₹29.2 L |
| 1.06 | Supply ,Laying and packing 20-40 kg.wt.Boulder in 10 SWG G.I wire crate size (3.00x1.50x1.00)m including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge. | 124 | Nos | 10,000 ₹12.4 L | 12,200 ₹15.1 L |
| 1.07 | Supply and laying brick soling/ kharanja per sqm | 1,750 | M2 | 400 ₹7 L | 275 ₹4.8 L |
Tender Value
₹97 L
EMD Value
₹1.9 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Irrigation Work Circle Tubewell colony Moradabad
LOT 16 Janpad Moradabad mein Kosi nadi ke bayen kinare par sthit Agapur-Madhauli tatbandh ke km 7.550 par baadh se suraksha hetu sper ke nirmaan ka karya.
2026_UPIDC_1122949_16
04/SEIWC/2025-26
Open Tender
Civil Works
90 days
MORADABAD
AS PER NIT
2 documents required · 2 mandatory
₹2,354
₹1.9 L
10 Apr 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
Laying and Jointing PVC Pipe. Heading
Heavy jungle clearance including cutting elephant grass and throny bushesin tarai including disposal beyond 30m.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers. Including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 mdistance as directed by the Engineer-in-charge
Earth work in embankment By Power Transported earth With a Lead Beyond 200 M and Upto 600m including excavation ,loading , unloading ,ramming, manual compaction, dressing and all lift etc. complete.
Supply ,Filling and Laying HDPE bags made of 95 GSM of size 48 cmx 75 cm & filling with earth/RBM/Sand & sewing with G.E.O. materials with mic. and placing in position i/c all cost of material, labour, T&P, etc required for proper completion of work.but Excluding GST.
Supply ,Laying and packing 20-40 kg.boulder in G.I wire crate size (1.50x1.50x0.45)m including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge.
Supply ,Laying and packing 20-40 kg.wt.Boulder in 10 SWG G.I wire crate size (3.00x1.50x1.00)m including all cost of labour material, and T&P etc with all taxes but excluding cost of G.S.T required for proper completion of work as per Engineer-in-charge.
Supply and laying brick soling/ kharanja per sqm
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2091896.pdf
BOQ Comparative Chart
xlsx
finsummary_2091896.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2091896.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid