Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹2.0 L+₹11,850 (6.46%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance found eligible | |
| 3 | 3₹2.0 L+₹15,520 (8.46%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
17 Apr 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Strengthening of electromechanical components with allied works at LIS Kah.
2021_IFC_121985_1
03/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹4,500
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
22 Apr 2021
7 Apr 2021
19 Apr 2021
7 Apr 2021
17 Apr 2021
8 Apr 2021
10 Apr 2021
180 days
SStrengthening of 250KVA Transformer installed at LIS Kah. The job involves disconnecting all electrical connections and Lifting the transformer from its installed position and loading in the vehicle with the help of crane and shifting to workshop with mech. transport. Unloading at workshop . Disassembling the transformer at workshop by unscrewing the bolts of top cover and extracting the body with chain pulley block. Rewinding its H.V. & L.V. coils with superior aluminium wire of requisite size/gauge. Replacement of damaged HT/LT bush rods with the new bush rods as per sample. Providing /Fitting of new gasket, L.T. terminal plate, nuts, bolts, etc. Cleaning of the tank and drying it. Providing/Topping up of 100 litre transformer oil and heating the oil to make it moisture free. Lowering the windings back in the tank Assembling the transformer by tightening all nuts, bolts and using oil packing sheets wherever necessary. Loading in the vehicle and shifting back to site . Job includes placing of transformer on the foundation with the help of crane using skilled manual labour. . Fitting the transformer and restoration of electrical connections. Testing & commissioning on full load.. Complete job including cost of material, skilled and semi-skilled labour charges, loading & unloading at both ends and transportation charges as per site conditions of LIS.
Strengthening of 60 HP 3 phase induction motor installed at LIS Kah . The job involves dismantling of motor from its installed position after disconnecting the power supply of all three phases. Dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump. Lifting the motor out of the pump house with chain pulley block with proper care to prevent any damage. Shifting the motor from LIS to workshop with the help of manual labour. mechanical transport to the workshop . Complete dismantling of the motor . P/F of new set of bearings as per sample . Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor and shifting back to L.I.S. Refitting the motor at its installed position and coupling with pump by way of lowering it with the help of chain pulley block, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges
De-silting of 150 mm dia foot valves of pumping unit no. 1 &2 at Kah by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS . Complete Job
PERFECT ELECTRICAL WORKS
M/S FASTTRACK ENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .