| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.1 LAdmitted-Finance | -27.86% | ₹11.1 L | L1 | Admitted-Finance |
| 2 | L2₹11.4 LAdmitted-Finance | -26.02% | ₹11.4 L | L2 | Admitted-Finance |
| 3 | L3₹11.9 LAdmitted-Finance | -22.98% | ₹11.9 L | L3 | Admitted-Finance |
Tender Value
₹15.4 L
EMD Value
₹30,823
Closing Date
18 Feb 2026, 3:00 pmClosed
EE,HCD-6,DDA
EE,HCD-6,DDA
Supply of equipment, manpower, transport, disposal of malba and other related arrangement on hire to DDA for demolition programwhenever required in HCC-2.
2026_DDA_897989_1
12/EE/HCD-6/DDA/2025-26
Open Tender
Civil Works
365 days
Rohini
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹30,823
5 Mar 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
Supply of equipment, manpower and transport etc. on hire to DDA for demolition programme whenever required in HCC-2. Hire Charges include cost of service of operating staff, cost of lubricationg oil, diesel/petrol, kerosene oil, other consumable for running the plant and machinery and all the taxes. The hire charges of plant and machinery on per day basis are for single shift of eight hours. The all labour shall be in proper uniform. a) TATA 407 or equivalent vehicle for local shifting.
Pneumatic hammer with operator and power etc.
JCB with operator, Hydraulic excavator (3D)JCB with driver and fuel
Labour with Hammer
Labour without Hammer
Drinking water (container of 20ltr. each)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm diaM.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.
Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineerin- Charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Total Non DSR Item ₹4,226.00
Total DSR Item ₹1,533,561.96
Add GST correction factor @0.973 on DSR Items = ₹1,492,155.79
Add Cost Index @3% on DSR Items ₹44,764.67
Add Item No. 1(f)= ₹4,226.00
TERMS AND CONDITIONS 1 THAT the agency shall carry the demolition items, equipments, instruments and manpower required for carrying out the same to the site of demolition at its own expenses. Nothing extra shall be payable by the authority to the agency in this behalf. 2 THAT the labour/manpower employed by the agency shall always be employees of the agency and under no circumstances the authority shall have to do anything with the labour/manpower. Any injury caused to the manpower, or damage to t he demolitions items/equipments/instruments shall be the sole and exclusive resposibility of the agency. 3 THAT the agency is required to carry out an insurance of all its demolition items/ equipments and instruments which shall cover the third party claim also. Further the agency is required to get itself insurance protection in respect of any injury to the labour/ manpower employed by the agency for the purpose of carrying out any requisite demolition. It is specifically agreed that any claim on the insurance company in respect of any damage to the demolition items/ equipments/ instruments or claim in respect of any injury to the labour employed, shall be borne by the agency exclusively and the authority shall have no concern with the same. The demolition equipments wherever required to be operated manually, shall be operated by persons employed by the agency and the authority shall have no concern in respect of the terms or incidents of employment of such persons. 4 THAT the authority shall be entitled to make recovery at double the accepted rates in respect of any loss of damage suffered or sustained by it because of the failure of the agency to perform punctually. It is specifically agreed between the parties that in case any such amount become payable by the agency to the authority.It is further specifically agreed the decision in this behalf of Engineer-in-charge DDA shall be final and binding on the agency. 5 THAT in case of unsatisfactory observance of the terms and conditions of the agreement, the authority shall have the right to terminate the agreement. However, before such termination, the authority shall serve on the agency a notice to show cause as to why the present agreement be not terminated. Such notice shall be duration of 15 clear days from the date of the receipt of such notice by the agency. 6 THAT the agency shall, simultaneously after signing of the agreement, submit a certificate along with agreement with equipment supplier if any to the Engineerin- charge that all demolitions items, equipments as well as manpower whenever required for the demolitions shall be kept readily available at shortest time gap and the contractor shall be informed about the demolition programme either through letter, telephonically, Whatsapp, E-mail or by any other means a day before demolition programme by 9:00 pm. 7 It is specifically agreed that in case of any failure/non-compliance on the part of the agency, in respect of the supply of any equipments, manpower,the Engineer-in-charge shall be entitled to arrange requisite demolition equipments,and manpower at the risk and cost of the agency. It is further specifically agreed that any loss or damages suffered by the authority because of any non-fulfilment of the agencies obligations under the agreement of violations of the terms and conditions of the agreement by the agency shall be recovered from the agency. 8 THAT contractor shall be paid 80% (eighty percent) of the awarded rates for equipment and transport in case the demolition programme failed/could not be carried out due to any reason at site. 9 In case any equipment or machinery becomes unserviceable, during the execution of demolition programme, the rates/ reduced rates be paid to the agency as per the recommendations of the Engineer-in-charge and it shall not be more than 80% of quoted/awarded rates.
10 Executive Engineer ensure that all the dismantled material received during the course of demolition at site will be the property of DDA and same shall be kept in record & will be auctioned in open market to bear the cost of demolition. The agency has to completely clean the demolition site by removal of malba complete in all respect & disposal of malba in nearby low laying area of DDA/approved dumping ground of MCD on as directed by Engineer-in-Charge. 11 Agency shall submit the valid fitness certificate, PUC in respect of all vehicle/ machinery required under Motor Vehicle Act prevailing at the time to Engineer-incharge along with valid license for operating vehicle/ machinery. 12 The contractor shall provide personnel safety equipment to all the manpower engaged on work. 13 All labours will be in same colour of labour reflective jacket. 14 Agency may be asked to carryout up to three programmes in a day depending on job requirements as decided by Engineer-in-charge.In case of failure to supply equipment and manpower etc., punitive action shall be taken under relevant terms and conditions described above
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.69 MB
BOQ_943882.xls
BOQ • 0.30 MB
NIT12.pdf
Tender Documents • 2.25 MB
Download all tender documents and submit your bid