Tender Value
₹35.5 Cr
EMD Value
₹45.5 L
Closing Date
10 Aug 2026, 1:00 pm
Executive Engineer
Office of the Executive Engineer, Civil Division-XV (N), GIDC Building, VI Floor, Patto Plaza, Panaji-Goa
Construction of the proposed Head Office Building at Patto Panaji - Goa, under Phase - II
2026_ED_30370_1
EE/DIV-XV/ED/ NOTICE-15/462 Dated 16/07/2026
Open Tender
Civil Works
Percentage
730 days
Patto Panaji
Please refer Tender documents.
4 documents required · 4 mandatory
₹30,000
₹45.5 L
17 Jul 2026
17 Jul 2026
11 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION A - EARTHWORK
Earthwork in excavation over areas in all types of stratas comprising of any type of materials such as soil, silt, clay, sand, gravel, murrum of all types of conglomerates, laterite rock, soft rock, ordinary rock , disintegrated rock , fissured / shattered rock, decomposed rocks, weathered rock, basaltic weathered or unweathered rock, bituminous road layers and all such other materials either in full or part as the case may be, by adopting contractor's proposed method / methods, as approved by engineer / Employer including chiseling, wedging etc. in all conditions such as dry, moist, foul, saturated, submerged. etc. all complete including dressing of sides ramming of bottom, including getting out the excavated soil as directed including pumping and bailing out water in submerged condition, barricading danger, lightening, guarding as directed by engineer. up to depth of 3.5 mts and lead up to 50m | - | Cum | 0.35 | - |
| 2Earthwork in excavation in foundation pipeline trenches, drain in all types of stratas comprising of any type of materials such as soil, silt, clay, sand, gravel, murrum of all types of conglomerates, laterite rock, soft rock, ordinary rock , disintegrated rock fissured / shattered rock, decomposed rocks, weathered rock, basaltic weathered or unweathered rock, bituminous road layers and all such other materials either in full or part as the case may be, by adopting contractor's proposed method / methods, as approved by engineer / Employer including chiseling, wedging etc. in all conditions such as dry, moist, foul, saturated, submerged. etc. all complete including shoring, strutting dressing of sides , ramming of bottom, including getting out the excavated soil as directed including pumping and bailing out water in submerged condition, barricading danger, lightening, guarding as directed by engineer. up to depth of 1.5 mts In foundation pipeline trenches, drain and lead up to 50m | |||||
| 3 | Shoulder and lagging wall temporary shoring : Providing temporary foundation shoring using "H" vertical piles ( ISMB 200) suitably spaced at about 900 mm distance to accommodate factory made precast RCC slab 900 mm x 400 mm x 150 mm thick within the flanges to form continious shoulder and lagging wall shoring, inclusive of driving of "H" vertical piles using vibrating Pile driving hammer of required capacity complete with power unit and accessories, bracing of piles using using structural members along the lagging walls as well as with the lagging wall on opposite side of the foundation, to form portal frames at strategic locations, as approved by Engineer, including extraction and removal of complete shoulder and lagging wall system etc. complete | - | Sqm | 0.63 | - |
| 4Boring holes vertically true to line and form for R.C.C. bored piles of required diameter in all strata including removing slush, all kinds of soil, all types of rock including weathered to very hard rock, percolating water etc. complete using DMC piling equipments of suitable capacity ( minimum piling sets as specified in the Project Spcecific Scope of Work, to complete piling work in 100 days ) as approved by engineer, using bentonite slurry and minimum 1500 mm embedments or as per working drawing whichever is higher, of the end bering piles in sound or closely jointed basaltic founding rock as approved by Engineer in-Charge, and providing and laying in position ready mixed concrete manufactured in fully automatic batching plant and transported to the site of work in transit mixer for all leads having been continuously agitated, manufactured as per the mix design of M40 Minimum and Maximum cement contents shall be as per IS 2911 (Latest) including the cost of pumping the RMC from transit mixer, lifting the casing in stages, Chipping and dressing of RCC piles as directed by Engineer, for minimum depth of 1000 mm to leave behind the sound concrete only, including, cleaning of reinforcement and removal of dismantled material etc. including all labours, tools and plants complete etc but excluding the cost of reinforcement and as per drawing and technical specifications | |||||
| 4.01 | 900mm dia bore : | - | Meter | 0.6 | - |
| 5High strain Dynamic Pile Testing (HSDPT)-Routine Pile Test : Conducting High Stain dynamic test on 600 mm / 900 mm diameter R.C. bored cast in situ pile including analysis & submission of 3 copies of report including provision of hammer, crane, plywood cushion and steel helmet and all other accessories etc necessary for testing | |||||
| 5.01 | 900 mm diameter pile | - | Each | 0.29 | - |
| 6Conducting low strain pile integrity test on R.C.C. bored piles foundations using pile integrity tester equipment manufactured by Pile Dynamics Inc. of USA or TOM of Netherlands conforming to ASTHD 5882. | |||||
| 7Providing and laying plum concrete in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggregate 40 mm nominal size) with plums not exceeding 15% of the volume of the finished concrete of size ranging from 150 to 300 mm (but the maximum dimension not exceeding 1/3rd (one third) the least dimension of member under consideration excluding the cost of centering and shuttering: a) With granitic or basaltic stone plums in:: - 1) foundation and plinth | |||||
| 8Disposal of debris, building rubbish, undesired material , unserviceable earth to the Contractor's identified dumping location including all leads , lifts , required statutory approvals and all costs. (Contractor shall identify the location and take all required Approval to indemnify PMC & Employer) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 10.87 MB
Tendernotice_2.pdf
PDF • 7.68 MB
Tendernotice_3.pdf
PDF • 7.67 MB
Tendernotice_4.pdf
PDF • 3.22 MB
Tendernotice_5.pdf
PDF • 1.74 MB
Tendernotice_6.pdf
PDF • 1.39 MB
Tendernotice_7.pdf
PDF • 8.47 MB
BOQ_30787.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].