| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.7 L+₹5,030.80 (0.88%)Rejected-AOC | ₹5.7 L+₹5,030.80 (0.88%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SRI VINAYAGA MURUGAN CONSTRUCTIONS H2 | THAMILARASAN H1 |
|---|---|---|---|---|---|
| 1.01 | Removing of Existing 83mm Paver block including cost of all labour charges for disposal from site | 306 | sqm | 99.16 ₹30,342.96 Lowest | 100.06 ₹30,616.89 |
| 1.02 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply in the following type of soils Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil as Directed by the Departmental officers | 510 | RM | 183.16 ₹93,411.6 Lowest | 184.81 ₹94,253.1 |
| 1.03Supplyof Materials | |||||
| 1.04 | 75 mm PVC pipe | 510 | RM | 95.95 ₹48,934.5 Lowest | 96.82 ₹49,377.38 |
| 1.05 | 75 mm Pvc bend | 20 | No | 58.49 ₹1,169.8 Lowest | 59.02 ₹1,180.48 |
| 1.06 | 75mm pvc coupler | 20 | No | 20.85 ₹417 Lowest | 21.04 ₹420.78 |
| 1.07 | 75mm PVC Equal Tee Fabricated | 15 | No | 66.61 ₹999.15 Lowest | 67.21 ₹1,008.17 |
| 1.08 | Lowering of 63mmPVC Pipes and Specials in the trenches and laying to proper grade and alignment, Joining with GI Specials and as directed by the TWAD Officers. | 510 | RM | 20.76 ₹10,587.6 Lowest | 20.95 ₹10,684.5 |
| 1.09 | Refilling the Excavated trenches after laying of 63mm PVC Pipe Complete as per standard Specification | 510 | RM | 25.3 ₹12,903 Lowest | 25.53 ₹13,021.65 |
| 1.10 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 30.6 | cum | 1,758.71 ₹53,816.53 Lowest | 1,774.56 ₹54,301.43 |
Tender Value
₹7.3 L
EMD Value
₹7,300
Closing Date
28 Jan 2026, 3:00 pmClosed
Sivakasi Corporation Commissioner
Sivakasi Corporation Office Rathinam Nagar Sivakasi
Providing pipe line arrangements at ward no 12 delivery line in Sivakasi city Municipal Corporation
2026_MAWS_646238_3
3001/2025/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
30 days
sivakasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,300
Yes
14 May 2026
23 Jan 2026
28 Jan 2026
23 Jan 2026
28 Jan 2026
23 Jan 2026
Removing of Existing 83mm Paver block including cost of all labour charges for disposal from site
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply in the following type of soils Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil as Directed by the Departmental officers
Supplyof Materials
75 mm PVC pipe
75 mm Pvc bend
75mm pvc coupler
75mm PVC Equal Tee Fabricated
Lowering of 63mmPVC Pipes and Specials in the trenches and laying to proper grade and alignment, Joining with GI Specials and as directed by the TWAD Officers.
Refilling the Excavated trenches after laying of 63mm PVC Pipe Complete as per standard Specification
Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_774663.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_774663.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .