| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 CrAccepted-AOC D 90 OKHLA INDUSTRIAL AREA PHASE 1 NEW DELHI NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | ₹14.5 Cr | L1 | Accepted-AOC Proposal accepted by the Government |
| 2 | L2₹14.8 CrRejected-Finance A 3 332 SECTOR 8 ROHINI DELHI 110085 | NORTH WEST | DELHI | 110085 | ₹14.8 Cr | L2 | Rejected-Finance Since 2nd lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified for financial bid opening |
Tender Value
₹12.3 Cr
EMD Value
₹22.3 L
Closing Date
26 Nov 2021, 5:30 pmClosed
O/o The CEE, Electricity Department, Panaji Goa
Chief Electrical Engineer, Electricity Department, Panaji Goa
Tender for the work of conversion of 11KV overhead network of Mollem feeder to 11KV underground system from 33/11KV Shigao sub station, under Division VII, Curchorem
2021_ED_1252_1
Tender No 55(2021-22)CSC
Open Tender
Electrical Works
365 days
Under Division VII, Curchorem
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,500
₹22.3 L
Yes
1 Feb 2023
15 Nov 2021
29 Nov 2021
19 Nov 2021
26 Nov 2021
19 Nov 2021
Amount
COST OF MATERIAL
Supply of 11KV, 3 core, 300 sq.mm. aluminium, XLPE insulated, flat wire armoured, 11 KV (Earthed) Cable, type A2XFY of conforming I.S. 7098 PART 2 and carrying ISI MARK through conventional open trenching method in any type of soil including hard laterite
Supply of 11KV, 3 core 185sq.mm aluminium, XLPE insulated, flat wire armoured, 11 KV (Earthed) Cable, type A2XFY conforming I.S. 7098 PART 2 and carrying ISI MARK through conventional open trenching method in any type of soil including hard laterite
Supply of 11KV, 630 Amps, Outdoor, SF6 Ring Main Unit with two Load Break Switches and one Circuit Breaker conforming to International Standards and complete with Fault Passage Indicator other accessories
Supply of 11KV, 630 Amps, Outdoor, SF6 Ring Main Unit with three Load Break Switches and one Circuit Breaker conforming to International Standards and complete with Fault Passage Indicator other accessories
Supply of 11KV, 3 phase, Outdoor type, heat shrinkable end termination kit complete, for 11 KV XLPE cable of size 3 x 300sq.mm including sockets,lugs,connectors etc. (for 11KV take off gantry at 33 by 11KV sub station and for interlinking with other 11KV Overhead feeders)
Supply of 11KV, 3 phase, Indoor type, heat shrinkable end termination kit complete, for 11 KV XLPE cable of size 3 x 300 sq.mm including sockets,lugs,connectors etc. for connecting RMU for main section side
Supply of 11KV 3 phase outdoor terminating kit complete, for 11 KV XLPE cable of size 3 x 185 sq.mm including sockets,lugs,connectors etc. for connecting 11KV end of Distribution transformer .
Supply of 11KV 3 phase indoor terminating kit complete, for 11 KV XLPE cable of size 3 x 185 sq.mm including sockets,lugs,connectors etc. for connecting RMU for main section side .
Supply of straight through joint complete for 11 KV XLPE cable of size 3 x 300 sq.mm including sockets,lugs,connectors etc. of make Raychem.
Supply of Cable route Markers (for entire 11 KV cable route length ) as per drawing.
Supply and Erection of Warning tape for entire 11 KV route length.
Supply and laying of fine river sand of approved quality for cushioning of HT underground cables laid by conventional Open Trenching Method.
Supply and laying of RCC PROTECTIVE COVER of size 600mm length x 250mm width x 37mm thick as a protective cover for underground cables.
Supply and laying of wire cut Bricks for 11KV Cable seperation.
Supply of G.I. earthing pipe, 2500mm long, 40mm nominal dia, class B, perforated for RMUs The pit shall be filled with homogenous mixture of 20Kgs of Charcoal, 20Kgs of salt and sand or soil with Brick masonary Chambers The work includes excavation, backfilling & spreading of excavated surplace earth evenly at RMUs.
Supply of HDGI flat of size 25mm x 5mm for earthing of RMUs
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size for foundations of RMUs)
Providing of Centering and shuttering including struttings, propping etc. and removal of formwork for a) Foundations, footings, bases of columns and mass concrete for RMU's
Providing of 12 mm cement plaster 1:4 ( 1 cement: 4 fine sand) for foundations of RMU's
Supply of RCC Hume Pipe 150mm dia with required no. of collars, for road crossing.
Supply of GI pipe,150mm dia for bridge crossing.
COST OF ERECTION
Erection, Testing and Commissioning of 11KV, 3 core, 300 sq.mm. aluminium, XLPE insulated, flat wire armoured, 11 KV (Earthed) Cable, type A2XFY of conforming I.S. 7098 PART 2 and carrying ISI MARK through conventional open trenching method in any type of soil including hard laterite
Erection, Testing and Commissioning of 11KV, 3 core 185sq.mm aluminium, XLPE insulated, flat wire armoured, 11 KV (Earthed) Cable, type A2XFY conforming I.S. 7098 PART 2 and carrying ISI MARK through conventional open trenching method in any type of soil including hard laterite
Erection, Testing and Commissioning of 11KV, 630 Amps, Outdoor, SF6 Ring Main Unit with two Load Break Switches and one Circuit Breaker conforming to International Standards and complete with Fault Passage Indicator other accessories
Erection, Testing and Commissioning of 11KV, 630 Amps, Outdoor, SF6 Ring Main Unit with three Load Break Switches and one Circuit Breaker conforming to International Standards and complete with Fault Passage Indicator other accessories
Erection, Testing and Commissioning of 11KV, 3 phase, Outdoor type, heat shrinkable end termination kit complete, for 11 KV XLPE cable of size 3 x 300sq.mm including sockets,lugs,connectors etc. (for 11KV take off gantry at 33 by 11KV sub station and for interlinking with other 11KV Overhead feeders)
Erection, Testing and Commissioning of 11KV, 3 phase, Indoor type, heat shrinkable end termination kit complete, for 11 KV XLPE cable of size 3 x 300 sq.mm including sockets,lugs,connectors etc. for connecting RMU for main section side
Erection, Testing and Commissioning of 11KV 3 phase outdoor terminating kit complete, for 11 KV XLPE cable of size 3 x 185 sq.mm including sockets,lugs,connectors etc. for connecting 11KV end of Distribution transformer .
Erection, Testing and Commissioning of 11KV 3 phase indoor terminating kit complete, for 11 KV XLPE cable of size 3 x 185 sq.mm including sockets,lugs,connectors etc. for connecting RMU for main section side .
Erection of straight through joint complete for 11 KV XLPE cable of size 3 x 300 sq.mm including sockets,lugs,connectors etc. of make Raychem.
Erection of Cable route Markers (for entire 11 KV cable route length ) as per drawing.
Excavation in any type of soil including hard laterite soil by mechanical means( hydraulic excavator) or manual means for laying of HT, LT cables of various sizes including excavation for equipment foundations i.e for RMUs including getting out the excavated soil and disposal of surplus excavated soil.
Refilling of excavated soil in the foundations, trenches etc. with avialable excavated earth in layers not exceeding 20 cm depth, cosolidating each layer by ramming and watering lead upto 50 M and all lifts and disposal of surplus earth in cable trenches and foundations of equipments.
Erection, Testing and Commissioning of G.I. earthing pipe, 2500mm long, 40mm nominal dia, class B, perforated for RMUs The pit shall be filled with homogenous mixture of 20Kgs of Charcoal, 20Kgs of salt and sand or soil with Brick masonary Chambers The work includes excavation, backfilling & spreading of excavated surplace earth evenly at RMUs.
Erection of HDGI flat of size 25mm x 5mm for earthing of RMUs
Laying of RCC Hume Pipe 150mm dia with required no. of collars, for road crossing.
Laying of GI pipe,150mm dia for bridge crossing.
Carrying out detailed physical survey of the area including detailed GPS survey which includes indicating and marking location of other utilities if any, furnishing of optimum and economical route and design for layong of HT, XLPE cables of various size and accessories, including plotting on the scaled land base map of size 1:1000 indicating all features and submitting drilling profile indicating proposed plan for open trenching,road,nullah,culvet, over bridge, rail crossing, or any other special crossing. The work shall include digging of trial pits at suitable intervals and re-instatement of dug-up area of trial pits. The detailed documents as well as the write-up shall be furnished in 02 nos. of hard copies and soft copies for approval.Upon approval fresh 06 Nos. of hard copies alongwith a soft copy shall be furnished duly corrected. On completion, the contractor has to submit final survey map with longitude and latitude of each every item with other details for asset mapping.
CREATIVE ENTREPRENEURS LLP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid