| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 CrAdmitted-Finance WARD NO 03 PO PARADEEP PORT PS PARADEEP DIST JAGATSINGHPUR ODISHA PIN 754120 | PARADEEP | JAGATSINGHPUR | ODISHA | 754120 | -16.75% | ₹4.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹10.0 L (2.11%)Admitted-Finance | -14.99% | ₹4.9 Cr+₹10.0 L (2.11%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 Cr+₹95.6 L (20.1%)Admitted-Finance PLOT NO 1182 3294 SHANTI VIHAR ITER SQUARE PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA 751030 | BHUBANESWAR | KHORDHA | ODISHA | 751030 | +0.00% | ₹5.7 Cr+₹95.6 L (20.1%) | L3 | Admitted-Finance |
| 4 | L3₹5.7 Cr+₹95.6 L (20.1%)Admitted-Finance | +0.00% | ₹5.7 Cr+₹95.6 L (20.1%) | L3 | Admitted-Finance |
| 5 | L3₹5.7 Cr+₹95.6 L (20.1%)Admitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | +0.00% | ₹5.7 Cr+₹95.6 L (20.1%) | L3 | Admitted-Finance |
Tender Value
₹5.7 Cr
EMD Value
₹5.7 L
Closing Date
5 May 2026, 5:00 pmClosed
Chief Construction Engineer
O/o ChiefConstructionEngineer,CentralRWCircle,BBSR
Construction of road from Banapur main canal Deuli sahi chhak to Singeshwar via Sunakera under MMSY-CMRL Scheme in the district of Khordha for the year 2025-26
2025_CERWI_122453_4
Tender Online C.C-32 of 2025
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Bhubaneswar
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹5.7 L
Yes
15 Jul 2026
29 Apr 2026
6 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Construction
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification and direction of Engineer-in-Charge. | 18,488 | Sqm | 8.44 | ₹1,56,038.72 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead as per Technical Specification Clause 202 of MoRD by manual means & as per direction of the Engineer-in-Charge.
i) Stone/brick masonry | 3.6 | Cum | 1,611.74 | ₹5,802.26 |
| - | ii) Upto 600mm dia | 7.5 | Rmt | 291.53 | ₹2,186.48 |
| 3 | Scarifying the existing bituminous road surface to a depth of 50mm (By Mechanical means) and disposal of scarified material within all lifts and lead upto 1000m and as per direction of the Engineer-in-Charge. | 2,448 | Sqm | 6.03 | ₹14,761.44 |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3 of MoRD. | - | Cum | 74.79 | - |
| 5 | Loosening, levelling & compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 50mm, mixed with water at OMC & then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction & clause 305 of MoRT&H specifications for Road & Bridge works (4th Revision) as per direction of the Engineer-in-Charge. | 4,159.8 | Cum | 35.58 | ₹1,48,005.68 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 & clause 305 of MoRT&H specification for Road & Bridge works as per direction of the Engineer-in-Charge. | 24,648.68 | Cum | 201 | ₹49,54,384.68 |
| 7 | Construction of embankment with approved materials deposited at site from road way cutting and excavation from drain & foundation of other strutures graded & compacted to meet the requirement of Tables 300.1 & 300.2 as per clause no.301of MORD specification for Rural roads and as per direction of Engineer-In-Charge. | 1,850.39 | Cum | 50.4 | ₹93,259.66 |
| 8 | Fine dressing and turfing including transportation of turfs by mechanical means with all leads and lifts and placing the turfs in position and ramming with thappies including watering and cost of labour and all materials etc complete as per direction of Engineer-in charge. | 16,926 | Sqm | 31.52 | ₹5,33,507.52 |
| 9 | Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on repared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision) and as per direction of Engineer in Charge | 2,523.25 | Cum | 1,842.19 | ₹46,48,305.92 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
Tendernotice_2.pdf
PDF • 2.86 MB
BOQ_569995.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .