Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | L1 | Admitted-Finance | |
| 2 | L2₹11.6 L+₹82,021.80 (7.60%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹11.7 L+₹88,146 (8.17%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹13.1 L+₹2.3 L (21.7%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹14.5 L+₹3.7 L (34.6%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAGAN ENTERPRISES L1 | MK DHANALAKSHMI INFRASTRUCTURE PRIVATE LIMITED L5 | tech infra L3 | KIRUSHIYAA CONSTRUCTION L2 | DHARSHINI ENTERPRISES L6 | THIRUMURUGAN ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of the PCC at wornout area of Existing building and clearing the debris from site including all labour charges, T & Ps etc., complete. | 1.8 | cum | 150 ₹270 Lowest | 5,000 ₹9,000 | 500 ₹900 | 500 ₹900 | 500 ₹900 | 460 ₹828 |
| 2.00 | Dismantling of the RCC at wornout area of Existing building and clearing the debris from site including all labour charges, T & Ps etc., complete. | 9.5 | cum | 2,500 ₹23,750 Lowest | 5,000 ₹47,500 | 4,500 ₹42,750 | 4,300 ₹40,850 | 4,000 ₹38,000 | 4,100 ₹38,950 |
| 3.00 | Supplying and Applying of Anticorrosive Protective coating at rusted steel reinforcement bars (Exposed steel surface from the old reinforcements rods) in RCC column, beam and slab etc., applyinging scarified anode Nito Zinc Primer and preparing the surface free from all dust particles and loose materials by using wire brush as directed at site of work. The rate shall include cost of materials, labours, brushes, tools, plant, equipments, transport, fuel, etc. | 48.8 | Rm | 500 ₹24,400 | 250 ₹12,200 Lowest | 450 ₹21,960 | 900 ₹43,920 | 350 ₹17,080 | 580 ₹28,304 |
| 4.00 | Supplying and Applying of Epoxy bonding agent with epoxy bonding coat Nito bond EP by using wire brush as directed at site of work. The rate shall include cost of materials, labours, brushes, tools, plant, equipments, transport, fuel, etc. | 170 | sqm | 700 ₹1,19,000 | 750 ₹1,27,500 | 500 ₹85,000 Lowest | 850 ₹1,44,500 | 1,150 ₹1,95,500 | 840 ₹1,42,800 |
| 5.00 | R:C:C 1:2:4 using 12 to 20mm HBG metal with Micro concrete, over using with form work including cost of all materials, scaffolding, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 18.72 | cum | 10,000 ₹1,87,200 | 8,000 ₹1,49,760 Lowest | 13,000 ₹2,43,360 | 10,000 ₹1,87,200 | 21,000 ₹3,93,120 | 13,700 ₹2,56,464 |
| 6.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works for steel anchoring & shear bond with the concrete including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc. complete. | 0.85 | MT | 70,000 ₹59,500 Lowest | 1,00,000 ₹85,000 | 75,000 ₹63,750 | 70,000 ₹59,500 Lowest | 1,05,000 ₹89,250 | 82,400 ₹70,040 |
| 7.00 | Plastering in CM 1:3 12 mm thick and curing compound including cost of all materials, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 622 | sqm | 250 ₹1,55,500 Lowest | 400 ₹2,48,800 | 300 ₹1,86,600 | 380 ₹2,36,360 | 330 ₹2,05,260 | 270 ₹1,67,940 |
| 8.00 | Painting with coat of Acrylic based compound on the surface of the concrete to keep the surface moist including cost of all materials, labours, lead and lift, etc., complete. | 622 | sqm | 400 ₹2,48,800 | 500 ₹3,11,000 | 400 ₹2,48,800 | 250 ₹1,55,500 Lowest | 320 ₹1,99,040 | 470 ₹2,92,340 |
| 9.00 | Painting with coat on the surface of the concrete to keep the surface moist including cost of all materials, labours, lead and lift, etc., complete. | 480 | sqm | 200 ₹96,000 Lowest | 500 ₹2,40,000 | 200 ₹96,000 Lowest | 240 ₹1,15,200 | 290 ₹1,39,200 | 240 ₹1,15,200 |
| 10.10 | SGST | 1 | percentage | 0.09 ₹82,297.8 Lowest | 0.09 ₹1,10,768.4 | 0.09 ₹89,020.8 | 0.09 ₹88,553.7 | 0.09 ₹1,14,961.5 | 0.09 ₹1,00,157.94 |
Tender Value
Refer Docs
EMD Value
₹14,950
Closing Date
23 Feb 2026, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Control room and other office rooms of Sunguvarchatram 400/ 230 - 110KV SS
2026_EB_654093_1
OT-93/2025-26 of SE/GCC-II
Open Tender
Civil Works
Works
120 days
Sunguvarchatram
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹14,950
Yes
18 Aug 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of the PCC at wornout area of Existing building and clearing the debris from site including all labour charges, T & Ps etc., complete. | 1.8 | cum | - | - |
| 2 | Dismantling of the RCC at wornout area of Existing building and clearing the debris from site including all labour charges, T & Ps etc., complete. | 9.5 | cum | - | - |
| 3 | Supplying and Applying of Anticorrosive Protective coating at rusted steel reinforcement bars (Exposed steel surface from the old reinforcements rods) in RCC column, beam and slab etc., applyinging scarified anode Nito Zinc Primer and preparing the surface free from all dust particles and loose materials by using wire brush as directed at site of work. The rate shall include cost of materials, labours, brushes, tools, plant, equipments, transport, fuel, etc. | 48.8 | Rm | - | - |
| 4 | Supplying and Applying of Epoxy bonding agent with epoxy bonding coat Nito bond EP by using wire brush as directed at site of work. The rate shall include cost of materials, labours, brushes, tools, plant, equipments, transport, fuel, etc. | 170 | sqm | - | - |
| 5 | R:C:C 1:2:4 using 12 to 20mm HBG metal with Micro concrete, over using with form work including cost of all materials, scaffolding, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 18.72 | cum | - | - |
| 6 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works for steel anchoring & shear bond with the concrete including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc. complete. | 0.85 | MT | - | - |
| 7 | Plastering in CM 1:3 12 mm thick and curing compound including cost of all materials, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 622 | sqm | - | - |
| 8 | Painting with coat of Acrylic based compound on the surface of the concrete to keep the surface moist including cost of all materials, labours, lead and lift, etc., complete. | 622 | sqm | - | - |
| 9 | Painting with coat on the surface of the concrete to keep the surface moist including cost of all materials, labours, lead and lift, etc., complete. | 480 | sqm | - | - |
| 0.9 | SGST | 1 | percentage | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.13 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_784333.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .