| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -2.00% | ₹5.7 L | L1 | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹11,680
Closing Date
8 Sept 2026, 6:00 pmClosed
EE PWD DIV. BARAN
EE PWD DIV. BARAN
Machining, plastering, dismantling, and other general arrangements for the municipal elections.
2026_CEPWD_595095_5
EE PWD DIV. BARAN NITNO-10/2026-27
Open Tender
Civil Works
Percentage
30 days
BARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV. BARAN
₹11,680
Yes
11 Sept 2026
8 Sept 2026
10 Sept 2026
8 Sept 2026
8 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer in charge : | 34.2 | cum | 826 | ₹28,249.2 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 45 | cum | 592 | ₹26,640 |
| 3 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand) | 300 | sqm | 259 | ₹77,700 |
| 4 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : | 19.95 | cum | 5,988 | ₹1,19,460.6 |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 34.2 | cum | 3,818 | ₹1,30,575.6 |
| 6 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 200 | sqm | 108.8 | ₹21,760 |
| 7 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr.:
All kinds of soil | 10,000 | sqm | 9 | ₹90,000 |
| 8 | Add GST (18%) on Total Construction Cost | 1 | Total | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.09 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1055748.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .