Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.7 LAccepted-AOC AT NUAPADA PO SUKRULI PS SUKRULI MAYURBHANJ | BALESHWAR | ODISHA | 756028 | ₹16.7 L | 1 | Accepted-AOC Lottery winner |
| 2 | 1₹16.7 LRejected-AOC | ₹16.7 L | 1 | Rejected-AOC Lottery |
| 3 | 1₹16.7 LRejected-AOC AT PALASBANI P O RAIHARI PS RAIRANGPUR RURAL DIST MAYURBHANJ | ₹16.7 L | 1 | Rejected-AOC Lottery |
| 4 | 1₹16.7 LRejected-AOC | ₹16.7 L | 1 | Rejected-AOC Lottery |
| 5 | 1₹16.7 LRejected-AOC AT DHANA P O BISOI DIST MAYURBHANJ | DHANA | MAYURBHANJ | ODISHA | ₹16.7 L | 1 | Rejected-AOC Lottery |
Tender Value
₹16.8 L
EMD Value
₹16,800
Closing Date
21 Feb 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, RAIRANGPUR
Construction of additional class room at Gouri shankar higher secondary school Building Khadiasole Asana Mayurbhanj under Bisoi for 25-26
2026_CERWI_125871_1
RWDRRP-27
Open Tender
Civil Works - Buildings
180 days
Rairangpur
2 documents required · 2 mandatory
₹6,000
₹16,800
Yes
4 May 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
21 Feb 2026
12 Feb 2026
12 Feb 2026 - 20 Feb 2026
Earth work in excavation of foundation trenches in hard soil including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring & Shuttering if required etc.complete as directed by the Engineer-in-charge
Supplying, filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete as directed by the Engineer-in-charge
Cement concrete(1:3:6) in foundation and plinth below the base course of flooring using 4cm size black hard hand broken granite stone metals of approved quality from approved quarry including lowering laying concrete watering and curing etc.complete to required levels laid in layers not exceeding 6" thick including cost,conveyance,royalties and all taxes of all materials and cost of all labour with T & P required for the work complete.
Brick masonary in cement mortar (1:6) using Flyash Bricks of size 10"x5"x3" having crushing strength not lessthan 75 Kg/Cm2 in Foundation and Plinth after immersing the bricks for six hours in water before use in all floors with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge.
Brick masonary in cement mortar (1:6) using Flyash Bricks of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/Cm2 in super structure after immersing the bricks for six hours in water before use in superstructure in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. Ground floor
First floor
R.C.C.work of M25 having a minimum comprresive strength 250 kg/Cm2 of 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 20mm down grade size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods as per direction of Engineer-in-charge. Column Base & Grade beam
Column & Beam (Ground floor)
Column & Beam (First floor)
Lintel (First floor)
Chajja (First floor)
Roof slab (First floor)
Staircase (Ground floor)
Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification and direction of Engineer-in-Charge. Ground floor
First floor
16mm thick cement plaster (1:6)in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing etc.complete with cost,conveyance royalties,all taxes and cost of all materials and cost of all labour with T&P requred for the work complete. as per the direction of Engineer in Charge. Ground floor
First floor
12mm thick cement plaster (1:6)in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing with cost, conveyance taxes and royalties of all materials and cost of all labour with T&P requred for the work complete as per the direction of Engineer in Charge. Ground floor
First floor
Supplying fitting & fixing of MS doors, windows,grill & grill gate including cost conveyance and taxes of all materials, cost of all labour,T&P required for the work etc. complete as per the direction of Engineer in Charge.
Supplying, fitting and fixing of stainless steel of 304 grade in hand railing in all floors using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2 mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T&P etc. required for the complete in all respect.
Painting two coats in all floors to new wood and iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance taxes of all materials,cost of all labour, T&P required for the work including cost of paint & primer etc complete as per the direction of Engineer in Charge.
Distempering two coats over a coat of primer of approved shade including cost conveyance taxes of distemper and cost of all labour with T&P required for the work etc.complete as per direction of Engineer in charge. First floor
Wall painting two coats with any approved quality of Weather seal coat over a coat of primer to give an even shade including cost of all materials,labour, T&p required for the work complete. Ground floor
First floor
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_580754.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.17 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_580754.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid