| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance JAISALMER RAJASTHAN 345001 INDIA UDYAM RJ 18 0001538 | JAISALMER | RAJASTHAN | 345001 | 1 | Accepted-Finance low |
Tender Value
₹1.8 L
EMD Value
₹1,750
Closing Date
29 Feb 2024, 3:00 pmClosed
Executive Officer
Executive Officer Arachalur Town Panchayat Erode District
Construction of Toilet at Anganwadi centre (AWC Code 33610100127) at Odanilai in Arachalur Town Panchayat
2024_DTP_429233_1
379/2023
Open Tender
Civil Works
Works
90 days
Arachalur
Class III
2 documents required · 2 mandatory
₹0
₹1,750
Yes
23 May 2024
22 Feb 2024
29 Feb 2024
22 Feb 2024
29 Feb 2024
22 Feb 2024
22 Feb 2024 - 29 Feb 2024
Amount
Earth work exception for foundation in all solids and sub-solids to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, structing and baling out water wherever necessary and filling the sides of foundation with excavated earth in layer of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the department officers with initial lead and lifts etc. including leaving the sites complete complying with standard specifications etc complete.
Earth work excavation and depositing on bank with initial lead of 10m and lift of 2m in narrow trenches for laying of pipes for water supply hard stiff clay,stiff biack cotton, hard red earth, shales, murram gravel, stoney earth and erath mixed with small size boulders and hard gravelly soil the following type of soils as directed by departmental officers (Pipe Line)
Supplying and filling in foundation and basement with filling M sand in layers of not more than 15 cm thick well rammed consolidated etc. complete complying with standard specification and as directed.
Cement concrete 1:4:8 Mix(One Cement,four Sand,Eight jelly) using 40 mm ISS Gauge HBG Metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications.
Random Rubble masonary in Cement Mortar 1:5 Mix (one cement, five sand) using new best rough and bond stones from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. laying and curing etc. complete. complying with std. specifications.
Supply and erection of Centring for sides and soffits of all concrete works using mild steel sheets supportted with casurino props for vertical supports including cost and conveyance of all materials to work site including all labour charges etc., complete. Grade Beam
Roof Slab
Reinforced cement concrete 1:1.5:3 Mix(One cement one point five sand and three hard broken stone) using 20 mm ISS HBG Metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications.
Supplying, Fabricating and placing in position TMT bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers.
Brick work in cement mortor 1:5 (One cement five sand) using well burnt chamber bricks of size 9 "x4 3/8 "x2 3/4 " all cost and conveyence of material to the site and all labour charges including curing etc complete complying with standard specification.
Plastering with cement mortar 1:5 (one cement and five sand) 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.
Special Ceiling Plastering with cement mortar 1:3 (one cement and five sand) 10mm thick in all floors including curing etc., complete complying with standard specification and as directed.
Special Plastering with cement mortar 1:3 (one cement and five sand) 20mm thick in all floors including curing etc., complete complying with standard specification and as directed.
Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside.Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug.(SOR Item no.264,P.No.65)
Supplying and fixing over the floors best quality of Scratch Ceramic Tiles of 30 c.m x 30c.m x 6mm size of approved colour laying with cement mortor 1:3 mix pointing the joints with colour pigments etc. Complete.
Dadooing the walls with glazed tiles of 30 c.m x 30 c.m 6mm size laid in cement mortor 1:2 mix 10mm thick and pointing with 0.40 kg white cement per m2 etc.,
Supplying and fixing in Position of Indian Oriya pan type water closet with “P’’ or “S’’ trap to set in brick jelly concrete 1:4:8 Mix concrete 10 cm thick using 20mm brick jelly and top finished with c.m. 1:3 mix 20mm thick without any leakage etc. complete.
Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications for 10 sqm
Supply and delivery of 110 mm PVC Pipe outer diameter 4kg / cm2 I.S.I.make including cost and conveyance Complete complying with standard specifications and as directed by the departmental Engineers.
Laying and joining of 110 mm outer diameter 4kg / cm2 I.S.I.make PVC and GI pipes with Proper gradient including cost and conveyance Complete complying with standard specifications and as directed by the departmental Engineers.
Refilling the Excavated earth including well Consolidation including cost and conveyance complete complying with standard specifications and as directed by the departmental Engineers.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_510321.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .