Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹17.1 L+₹13,906.81 (0.82%)Rejected-Finance 11 | VIRUDHUNAGAR | TAMIL NADU | 626202 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹17,320
Closing Date
9 Jun 2021, 4:00 pmClosed
Block Developmet Officer
Panchyat Union,Shencottai
Construction of New School Building 2 Classroom with Verandah at Panchayat union Middle School Building in Elathur panchayat in Shencottai Panchayat Union MLACD 2020-21
2021_RDTN_201952_1
A3/3141/2020
Open Tender
Civil Works
Works
120 days
Panchyat Union, Shencottai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,320
Yes
9 Jun 2021
3 Jun 2021
9 Jun 2021
3 Jun 2021
9 Jun 2021
3 Jun 2021
Amount
Construction of New School Building (2 Classroom with Verandah) at Panchayat union Middle School Building in Elathur panchayat in Shencottai Panchayat Union MLACD 2020-21
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
For basement
For Superstructure
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
For basement
For Superstructure
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc complete.
Below Basement
Above Basement
Refilling the basement with excavated earth other than sand complying the Standard specification
Supply and fixing of Steel doors size 1.20X2.10m including all cost of material and all Labour charge et complete
Supply and fixing of Steel Windows size 1.20X1.30m including all cost of material and all Labour charge et complete
Providing and fixing AC Rainwater downfall pipes of 110mm dia inculding cost and coveyance etc complete.,
Weathering course with broken brick jeely for 20mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc complete.
Finishing the top roof with one course of PRESSED TILES of size 23cm X 2cm laid in CM 1:3 12 mm thick mixed with water proofing compound conforming to IS 2% by weight
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Towards the labour charges for fixing of steel doors inculding cost and coveyance etc complete.,
Towards the labour charges for fixing of steel window inculding cost and coveyance etc complete.,
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Paving the floor with best quality Vetrified (Such as Morbonite) Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Paving the floor with pre-polished concrete anti skid tiles of 20 mm thick of approved quzlity colour laid in CM 1:3 20 mm thick and pointed with white cement morter mixing with colouring pigment at rate of 0.40 kg /sq.m curing etc. Complete complying with standared specification and as direted by the depratmetal officer
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats with approved Black Oxide for New Black Board over the cement platered surface including cost and conveyance of paint and all labour charges etc complete
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in for PVC concealed Light point / fan point (For electronic Regulator) SD 18
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in for concealed PVC plug point SD 36
Supply and fixing of single box type 4' 40 W flu fitting complete PVC unsheathed Copper leads fron terminals to the fitting. SD 88
Supply & Fixing of fancy glass shade and 11 V CFL for BH Point SD 83
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete of size 450mm (18") SD 110
Supply & Delivery of meter board SD 125
Supply and fixing of 16 A DP switch of 500 V SD 142
Supply & run of 2 of 4 sq.mm (56/0.30) polythene insulated and PVC unsheeted SC Alu cable of mains SD 64
Supply and fixing 20mm GI Pipe including cost and conveyance all labour charge etc complete
Supply and fixing of WT Bulk head fitting with guard suitable for 11w CFL lamb with CFL-SD 83
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MADASAMY
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_240566.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .