Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.2 Cr+₹26.1 L (2.39%)Admitted-Finance 501 5TH FLOOR PLOT NO 67 PUJIT PLAZA PALM BEACH ROAD SECTOR 11 CBD BELAPUR NAVI MUMBAI 400614 MAHARASHTRA | NAVI MUMBAI | THANE | MAHARASHTRA | 400614 | L2 | Admitted-Finance | |
| 3 | L3₹14.6 Cr+₹3.6 Cr (33.2%)Admitted-Finance 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | L3 | Admitted-Finance | |
| 4 | L4₹15.5 Cr+₹4.6 Cr (41.8%)Admitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Non-Responsive |
| Sl No | Description | Qty | Unit | Technocrats Advisory Services Pvt. Ltd. L1 | K and J Projects Pvt Ltd L3 | Dhruv Consultancy Services Limited L2 | Almondz Global Infra Consultant Limited L4 |
|---|---|---|---|---|---|---|---|
| 1.00Professional Staff | |||||||
| 1.10 | Team Leader Cum Senior Highway Engineer (1 No.) | 30 | Months | 1,60,000 ₹48,00,000 | 1,40,000 ₹42,00,000 Lowest | 2,50,000 ₹75,00,000 | 2,00,000 ₹60,00,000 |
| 1.20 | Resident cum Highway Engineer (2 Nos.), (One for Package-3 & 4 and one for Package-5 & 6 and 1 No. for Maintenance of Package-3, 4, 5 & 6) | 102 | Months | 1,30,000 ₹1,32,60,000 | 76,000 ₹77,52,000 Lowest | 1,90,000 ₹1,93,80,000 | 1,75,000 ₹1,78,50,000 |
| 1.30 | Bridge/Structural Engineer (1 No.) | 30 | Months | 1,40,000 ₹42,00,000 | 90,000 ₹27,00,000 Lowest | 1,90,000 ₹57,00,000 | 1,50,000 ₹45,00,000 |
| 1.40 | Senior Pavement Specialist (1 No.) | 24 | Months | 1,30,000 ₹31,20,000 | 75,000 ₹18,00,000 Lowest | 1,25,000 ₹30,00,000 | 1,50,000 ₹36,00,000 |
| 1.50 | Senior Quality Cum Material Expert (1 No.) | 24 | Months | 1,30,000 ₹31,20,000 | 75,000 ₹18,00,000 Lowest | 1,25,000 ₹30,00,000 | 1,50,000 ₹36,00,000 |
| 1.60 | Slope Protection Expert (1 No.) | 30 | Months | 1,10,000 ₹33,00,000 | 99,000 ₹29,70,000 Lowest | 2,50,000 ₹75,00,000 | 1,50,000 ₹45,00,000 |
| 1.70 | Road Safety Expert (1 No.) | 23 | Months | 1,00,000 ₹23,00,000 | 85,000 ₹19,55,000 Lowest | 1,00,000 ₹23,00,000 | 1,50,000 ₹34,50,000 |
| 2.00Sub-Professional Staff | |||||||
| 2.01 | Survey Engineer, 4 Nos. (One for each Package) & 1 No. for Maintenance of Package-3, 4, 5 & 6 | 88 | Months | 90,000 ₹79,20,000 | 1,02,250 ₹89,98,000 | 60,000 ₹52,80,000 Lowest | 1,00,000 ₹88,00,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
4 Apr 2022, 11:00 amClosed
R K Tindwal
NHIDCL, 2nd Floor, PTI Building, 4- Parliament Street, New Delhi
Consultancy services as AE for Supervision of Four laning of Vairengte - N. Kawnpui section (Package-3, 4, 5 and 6) of NH-306 and NH-6 in the State of Mizoram - 4th Call
2022_NHIDC_676967_1
NHIDCL/Miz./NH-306 and 6/ S-V-S/ AE/Pkg-3,4,5,6
Open Tender
Civil Works
Item Rate
2556 days
Mizoram
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
30 May 2022
4 Mar 2022
5 Apr 2022
4 Mar 2022
4 Apr 2022
17 Mar 2022
4 Mar 2022 - 14 Mar 2022
14 Mar 2022
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer (1 No.)
Resident cum Highway Engineer (2 Nos.), (One for Package-3 & 4 and one for Package-5 & 6 and 1 No. for Maintenance of Package-3, 4, 5 & 6)
Bridge/Structural Engineer (1 No.)
Senior Pavement Specialist (1 No.)
Senior Quality Cum Material Expert (1 No.)
Slope Protection Expert (1 No.)
Road Safety Expert (1 No.)
Sub-Professional Staff
Survey Engineer, 4 Nos. (One for each Package) & 1 No. for Maintenance of Package-3, 4, 5 & 6
Assistant Highway Engineer, 4 Nos. (One for each Package) & 1 No. for Maintenance of Package-3, 4, 5 & 6
CAD Expert, 1 No.
Environmental Engineer, 1 No.
Assistant Bridge Engineer, 1 No.
Assistant Quality cum Material Engineer, 4 Nos. (One for each Package) & 1 No. for Maintenance of Package-3, 4, 5 & 6
Electrical Engineer, 1 No.
Toll Expert
Quantity Surveyor, 4 Nos. (One for each Package) & 1 No. for Maintenance of Package-3, 4, 5 & 6
Horticulture cum Landscaping Expert, 1 No.
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle (not more than 3 years old) (4 nos during Construction Period and 1 nos during Maintenance Period.)
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (4 nos during Construction Period and 3 nos during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 30 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 300 sqm area shall be rented at one location in midway of project during Construction Period
One Office of Minimum 50 sqm area shall be rented in midway of project during Maintenance Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (65.70 kms x 8 times)
Pavement strength measurement using FWD (65.70 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (65.70 kms x 8 times)
Road signs inspection using Retro Reflectometer (65.70 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Dhruv Consultancy Services Limited
K and J Projects Pvt Ltd
Almondz Global Infra Consultant Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .