| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 CrAccepted-AOC H NO 73 OLD A G CO OPERATIVE SOCIETY KADRU RANCHI JHARKHAND 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | ₹27.6 Cr Quoted ₹28.1 Cr | L1 | Accepted-AOC 1ST LOWEST BIDDER |
| 2 | L2₹33.0 Cr+₹4.9 Cr (17.4%)Rejected-Finance | ₹33.0 Cr+₹4.9 Cr (17.4%) | L2 | Rejected-Finance Being 2nd lowest bidder |
| 3 | L3₹33.3 Cr+₹5.2 Cr (18.4%)Rejected-Finance | ₹33.3 Cr+₹5.2 Cr (18.4%) | L3 | Rejected-Finance Being 3rd lowest bidder |
| 4 | L4₹35.0 Cr+₹6.9 Cr (24.5%)Rejected-Finance | ₹35.0 Cr+₹6.9 Cr (24.5%) | L4 | Rejected-Finance Being 4th lowest bidder |
| 5 | L5₹44.4 Cr+₹16.3 Cr (58.0%)Rejected-Finance 00 00 NAPASAR ROAD NENO KA BASS BIKANER RAJASTHAN BIKANER RAJASTHAN 334022 UDYAM RJ 08 0001676 | BIKANER | RAJASTHAN | 334022 | ₹44.4 Cr+₹16.3 Cr (58.0%) | L5 | Rejected-Finance Being 5th lowest bidder |
| Sl No | Description | Qty | Unit | M/s Khanna Enterprises L4 | A.S. CONSTRUCTION CO. L5 | DES RAJ AND SONS BUILDERS PVT LTD L3 | TRIVENI CONSTRUCTIONS L2 | BHARDWAJ TECHNOINFRA PVT LTD L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. | ||||||||
| 1.01 | Construction of Married Accn triple Storey (G+2) of 28 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket A6)
(Refer Drg No. CEAF/CHD/WD-343/01/2026 Sheet No 1/4 to 4/4 including connecting drawings) | 1 | Each | 6,00,00,000 ₹6,00,00,000 | 8,00,00,000 ₹8,00,00,000 | 5,47,00,000 ₹5,47,00,000 | 5,34,00,000 ₹5,34,00,000 | 4,42,30,000 ₹4,42,30,000 Lowest |
| 1.02 | Construction of Married Accn triple Storey (G+2) of 28 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket Z)
(Refer Drg No. CEAF/CHD/WD-343/02/2026 Sheet No 1/4 to 4/4 including connecting drawings) | 1 | Each | 6,00,00,000 ₹6,00,00,000 | 8,00,00,000 ₹8,00,00,000 | 5,47,00,000 ₹5,47,00,000 | 5,34,00,000 ₹5,34,00,000 | 4,42,30,000 ₹4,42,30,000 Lowest |
| 1.03 | Construction of Married Accn triple Storey (G+2) of 22 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket A)
(Refer Drg No. CEAF/CHD/WD-343/03/2026 Sheet No 1/6 to 6/6 including connecting drawings) | 1 | Each | 5,00,00,000 ₹5,00,00,000 | 6,25,00,000 ₹6,25,00,000 | 4,31,00,000 ₹4,31,00,000 | 4,21,00,000 ₹4,21,00,000 | 3,88,47,000 ₹3,88,47,000 Lowest |
| 1.04 | Construction of Married Accn triple Storey (G+2) of 52 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket G)
(Refer Drg No. CEAF/CHD/WD-343/04/2026 Sheet No 1/4 to 4/4 including connecting drawings) | 1 | Each | 11,00,00,000 ₹11,00,00,000 | 14,70,00,000 ₹14,70,00,000 | 10,00,00,000 ₹10,00,00,000 | 9,92,00,000 ₹9,92,00,000 | 8,67,55,470 ₹8,67,55,470 Lowest |
| 2.00NOTE: Schedule ‘A’ Part II to XIII under Ser No 2.01 to 2.12 are Prepriced by MES. | ||||||||
| 2.01 | Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK ” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 38,00,000 ₹38,00,000 | 41,76,741.04 ₹41,76,741.04 | 49,62,945.07 ₹49,62,945.07 | 29,99,999.3 ₹29,99,999.3 Lowest | 42,00,000 ₹42,00,000 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS) ” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 1,30,00,000 ₹1,30,00,000 | 1,21,01,919.48 ₹1,21,01,919.48 Lowest | 1,32,82,578.36 ₹1,32,82,578.36 | 1,47,58,438.4 ₹1,47,58,438.4 | 1,33,00,000 ₹1,33,00,000 |
| 2.03 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 55,00,000 ₹55,00,000 | 50,51,546.37 ₹50,51,546.37 | 57,99,923.61 ₹57,99,923.61 | 62,00,004 ₹62,00,004 | 33,75,000 ₹33,75,000 Lowest |
| 2.04 | Lump sum price worked out by the Contractor for “SEWAGE WORKS” as listed in Schedule ‘A’ Part -V | 1 | Lump sum | 20,00,000 ₹20,00,000 | 19,61,148.82 ₹19,61,148.82 | 16,66,971.39 ₹16,66,971.39 Lowest | 23,00,000 ₹23,00,000 | 17,75,000 ₹17,75,000 |
Tender Value
₹25.7 Cr
EMD Value
₹15 L
Closing Date
30 Jul 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
DEMOLITION AND RECONSTRUCTION OF UNSAFE/ DILAPIDATED OMQs/SMQs AT AF STN CHANDIGARH
2026_MES_768537_1
CEWAC/CHD/T-10/2026-27
Open Tender
Civil Works
Lump-sum
730 days
GE (AF) CHANDIGARH
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
GE (AF) CHANDIGARH
₹15 L
Yes
16 Sept 2026
25 Jun 2026
3 Aug 2026
25 Jun 2026
30 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. | |||||
| - | Construction of Married Accn triple Storey (G+2) of 28 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket A6) | 1 | Each Pocket | - | - |
| 1.02 | Construction of Married Accn triple Storey (G+2) of 28 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket Z) | 1 | Each Pocket | - | - |
| 1.03 | Construction of Married Accn triple Storey (G+2) of 22 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket A) | 1 | Each Pocket | - | - |
| 1.04 | Construction of Married Accn triple Storey (G+2) of 52 quarters including parking with permanent specifications complete all as specified and as shown on drawings. (Pocket G) | 1 | Each Pocket | - | - |
| - | Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK ” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 49,13,813 | ₹49,13,813 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS) ” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 1,53,13,589.1 | ₹1,53,13,589.1 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 37,41,886.2 | ₹37,41,886.2 |
| - | Lump sum price worked out by the Contractor for “SEWAGE WORKS” as listed in Schedule ‘A’ Part -V | 1 | Lump sum | 19,61,148.82 | ₹19,61,148.82 |
| - | Lump sum price worked out by the Contractor for “PATH WORKS” as listed in Schedule ‘A’ Part- VI | 1 | Lump sum | 80,11,481.93 | ₹80,11,481.93 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_867556.xls
BOQ • 0.54 MB
Tender.pdf
Tender Documents • 6.12 MB
drawings.pdf
Additional Documents • 19.40 MB
Corrigendum01.pdf
PDF • 21.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .