Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.6 L+₹6,561.75 (0.62%)Rejected-Finance | L2 | Rejected-Finance highest | |
| 3 | L3₹10.9 L+₹42,848.35 (4.07%)Rejected-Finance | L3 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | R RAJAN L1 | EASWARAN L3 | G ARAVINTHAN L2 |
|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF STORE ROOM CUM KITCHENSHED AT PANCHAYAT UNION PRIMARY SCHOOL AT LABOUR CAMP | ||||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in all class of soil including all etc complete | 20.78 | cum | 356 ₹7,397.68 Lowest | 370 ₹7,688.6 | 358 ₹7,439.24 |
| 3.00 | Filling with sand including all etc complete complying with standard specification | 2.63 | cum | 2,691 ₹7,077.33 Lowest | 2,790 ₹7,337.7 | 2,769 ₹7,282.47 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including all etc complete | 4.97 | cum | 7,612 ₹37,831.64 Lowest | 7,890 ₹39,213.3 | 7,708 ₹38,308.76 |
| 5.00 | Filling with excavated earth including all etc complete complying with standard specificartion | 5.06 | cum | 62 ₹313.72 Lowest | 65 ₹328.9 | 62 ₹313.72 Lowest |
| 6.00 | Brick work in n cement mortar 1:5 mix country bricks of size 23*11*7 including all etc complete complying with standard specification | 16.27 | cum | 7,605 ₹1,23,733.35 Lowest | 7,885 ₹1,28,288.95 | 7,672 ₹1,24,823.44 |
| 7.00 | Supply and erection centering with necessary supports including all etc complete complying with standard specification 1.columns | 32.95 | sqm | 1,296 ₹42,703.2 Lowest | 1,345 ₹44,317.75 | 1,303 ₹42,933.85 |
| 8.00 | 2.Beams and Slab | 74.23 | sqm | 1,422 ₹1,05,555.06 Lowest | 1,475 ₹1,09,489.25 | 1,431 ₹1,06,223.13 |
| 9.00 | 3.Loft and Sunshade | 2.26 | sqm | 1,564 ₹3,534.64 Lowest | 1,625 ₹3,672.5 | 1,573 ₹3,554.98 |
| 10.00 | Supply and fabrication of steel including all etc complete complying with standard specification | 1.47 | mt | 1,02,825 ₹1,51,152.75 Lowest | 1,06,555 ₹1,56,635.85 | 1,03,195 ₹1,51,696.65 |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
30 Sept 2025, 3:00 pmClosed
Block Developement Officer VP
Block developement Office Udhagai
CONSTRUCTION OF STOREROOM CUM KITCHENSHED AT PUPS AT LABOUR CAMP
2025_RDTN_608733_1
PTMGR KITCHENSHED AT LABOUR CAMP
Open Tender
Civil Works - Buildings
Fixed-rate
90 days
Panchyat Union Office Udhagai
AS PER TENDER NOTICE
3 documents required · 3 mandatory
₹0
₹11,000
Yes
Block developement Office Udhagai
23 Oct 2025
25 Sept 2025
30 Sept 2025
25 Sept 2025
30 Sept 2025
25 Sept 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .