Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount |
|---|---|---|
| 1 | ₹32.1 L |
Tender Value
₹46.5 L
EMD Value
₹93,600
Closing Date
18 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Vipul Kumar Nandan
EE Motipur
pani Tanki Road Motipur
SUPERINTENDING ENGINNER MUZAFFARPUR
SE
Construction of 50 Nos. of 125mmx40mmx61M deep tube well, with IM-II handpump with platform, drain and soakpit for Muzaffarpur district under P.H. Division Motipur
138094
NIT-04/PHED MOTIPUR /2026-27
Open Tender
CIVIL
Muzaffarpur
• Earnest Money
• Registration Paper of appropriate class of Class-III Govt. of Bihar
• PAN Card
• GST registration in state of Bihar
• Details of Tools & Plant
• Affidavit from the noatary certifying that the bidders/ contractor has completed more than 80%/completed the work previously awarded to him and NOC for Debar
• Valid Mobile No and email id. for communication
CIVIL
PERCENTAGE
L1
1
7 documents required · 7 mandatory
₹5,000
Processing Fee: 1180
₹93,600
29 Oct 2026
14 Aug 2026
19 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
120 days
Report Type Conventions Code Conventions Code No of Items 1
3 1 --> Item | Spec -- vendor || Vender Name Vend Serial No SlNo Diff in cells b/n Items 1
Tender No Tend Sub Serial No SSlNo
Line No LineNo Constants Const
Input Sheet Cells Output Sheet Cells Sort Range Sort Cell Duplicate Cell Range
Sheet No Column No Row No Column No Row No Sheet No Column No Row No Column No Row No ON Sheet No From Column From Row To Column To Row From Column From Row ON Sheet No From Column From Row To Column To Row ON
Vend 2 E 6 SSlNo 2 E 6 E 16 SSlNo
1 E 7 E 16 2 E 7 E 16 SSlNo
CS TECHNICAL BID
Name of Work Construction of 50 of 125mmx40mmx61M deep tube well, with IM-II handpump with platform, drain and soakpit for Muzaffarpur district under P.H. Division Motipur Cost of Work as per BOQ Time of Completion (in months) 3
Sl No. Items Requirement
Name of the contractor
Address of the contractor
1 Earnest Money (A) As prescribed in NIT document duly pledged in Favour of Executive Engineer, P.H. Division, Muzaffarpur.
93600 Earnest money - Rs.
2 Registration Paper of appropriate class of Class-III Govt. of Bihar
4 GST registration in state of Bihar
5 Details of Tools & Plant
6 Affidavit from the noatary certifying that the bidders/ contractor has completed more than 80%/completed the work previously awarded to him and NOC for Debar
7 Valid Mobile No. for communication
8 Valid Email ID for communication
BILL OF QUANTITY FOR THE WORK: - Construction of 50 Nos. of 125mmx40mmx61M deep tube well, with IM-II handpump with platform, drain and soakpit for Muzaffarpur district under P.H. Division Motipur
Last Date of Tender Receiving :-
Estimated Cost:- Rs.4,655,000.00
Earnest Money :- Rs.93,600.00
Time of Completion :- 3 Months
Cost of BOQ :- (including Beltron Processing Fee) Rs.5000.00 Through online Mode.
S.N. Particulars Quantity Unit Rate Amount
1 Construction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain (As per sub BOQ No. 1) 50 Nos. Each 85100.00 4,255,000.00
Construction of soak pit 1.0 m diameter 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc for Handpump (As per sub BOQ No. 2) 50 Nos. Each 8000.00 400,000.00
Total Rs. 4,655,000.00
1 Estimated cost :- Rs.4,655,000.00
2 Name of the Contractor :-
3 Address of the Contractor :-
4 Valid Mobile No.
5 Valid Email ID
6 I/we offer in Figures…………………………... in words……………………………………………… % (Percentage) High / Less/ Estimated rate are mentioned in the Bill of quantity. IN FIG. %
Executive Engineer, P.H. Division,Motipur
Construction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain .
(Materials should confirm to following B.I.S Specifications with latest amendments. Rates are inclusive of (Contractor's Profit & Overheads-15%), Octrai, Royalty, All Taxes, cess etc and FOR anywhere in State of Bihar.
Sl.No. Particulars Qty. Unit Rate Amount
Part 'A' Cost of Materials
1 India mark II hand pump with 8 Nos. Connection Rod and one cylinder confirming IS:15500(Part 1-8)/2008 1 No. Each Rs.12,650.00 Rs.12,650.00
2 125mm dia U.P.V.C. casing pipe confirming to IS:12818-1983/1992 27 M P/M Rs.427.00 Rs.11,529.00
3 32 mm dia G.I. pipe medium quality (3mtr each length) confirming IS:1239(Part 1-4) 24 M P/M Rs.232.00 Rs.5,568.00
4 40mm dia best quality UPVC pipe confirming to IS:12818-1983/1992 30 M Each Rs.80.00 Rs.2,400.00
5 40mm dia X 2 mtr long UPVC RIBEED Strainer confirming to IS:12818-1983/1992 2 Nos. Each Rs.246.00 Rs.492.00
6 125 mm X 40 mm UPVC reducing socket (Heavy quality). 1 No. Each Rs.272.10 Rs.272.10
7 Supplying all labour and material and fitting and fixing G.I. cap over the new skunked T/well 1 No. Each Rs.142.65 Rs.142.65
8 Providing all material and labour and construction 1.85m dia circular PCC (1:2:4) UNICEF design platform with foot rest etc. all complete. 1 No. Each Rs.6,400.00 Rs.6,400.00
9 Providing all material and construction 1 P.C.C. (1:2:4) UNICEF design drain for disposal of water etc. all complete. 3 M P/M Rs.716.00 Rs.2,148.00
TOTAL 'A'--- Rs.41,601.75
Part 'B' labour Cost (Classification of soil item 'B')
1 Boring by jet dheki by suitable cutter or reduce as the case may be lowering 125 mm U.P.V.C. X 40mm dia UPVC pipe & strainer of standard quality iron shoe, plug & shocked etc. all complete including providing all tools and plants required for the job as per specification and direction of the engineer in charge.
(a) For 125 mm dia U.P.V.C. pipe 27.0 M P/M Rs.832.78 Rs.22,485.06
(b) For 40 mm dia UPVC Pipe 3.5 M P/M Rs.474.99 Rs.1,662.47
(a) For 40 mm dia UPVC Pipe 30.5 M P/M Rs.546.20 Rs.16,659.10
2 (a) Supplying all tools for lowering 32mm dia G.I. Pipe 24 M P/M Rs.20.12 Rs.482.88
(c) Fixing I.M. II pump. 1 No. Each Rs.214.40 Rs.214.40
3 Providing labour for fitting and fixing deep well cylinder with necessary connecting rod and drilling flanges including supplying jointing materials, all tools and plants etc, required for the job for low water level all complete as per specification. 1 No. Each Rs.509.70 Rs.509.70
4 Supplying labour and developing the T/Well to have sand free discharge all complete as per direction of E/I 1 No. Each Rs.1,124.70 Rs.1,124.70
5 Transportation of materials & tools from Store to work site and carrying back the surplus materials if any. 1 No. Each Rs.348.90 Rs.348.90
TOTAL 'B'--- Rs.43,487.21
TOTAL 'A' + 'B' = Rs.85,088.96
Cost of One No. I.M. II T/well Say Rs.85,100.00
Executive Engineer
P.H Division, Motipur
Name for the work :- Construction of soak pit 1.0 m diameter 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc for Handpump complete as per detail below
S. N. Particulars Qty. Unit Rate Amount
A Earth work in excavation over areas (exceeding 1.5 in depth, 1.5m in width as well as 10 sqm in plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed.
B 6.1.14B Brick work with bricks of class designation 100 B in foundation and plinth in
Cement mortar 1:6 (1 cement : 6 coarse sand)
Less for honey comb masonary
C 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having sloe up to 15, landing, balconies, shelves, chajjas, lintals, bands, plain windows sills, staircase and spiral stair cases up to floor five level excluding cost of centring, shuttering, finishing with cement concrete 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size)
D 5.22 7A Reinforcement for RCC work including stragihtening, cutting, bending & placing in position and binding all complete.
8 mm to 10mm dia T.M.T. bars 8 Kg. P/Kg. Rs.94.50 Rs.756.000
E providing brick bats 22 mm to 40 mm size for filling soak pit as per approved etc. all complete including carriage of brick bats.
F Carriage of materials.
(a) Bricks ( 7 Km. Pucca & 1 Km Kaccha lead) 287 No. P/%0 Rs.1,139.38 Rs.326.587
(c) Coarse Sand ( 50 Km. lead) 0.27 M3 P/M3 Rs.1,232.94 Rs.332.894
(d) Stone Chips ( 200 Km. lead) 0.11 M3 P/M3 Rs.4,270.38 Rs.471.410
Multiplying Factor for Additional 6% GST= 0.0536 Rs.406.414
Grand Total Say Rs.7,989.020
Cost of One No.Soak Pit Say Rs.8,000.000
Executive Engineer
P.H. Division Motipur
BILL OF QUANTITY FOR THE WORK: - Construction of 50 Nos. of 125mmx40mmx61M deep tube well, with IM-II handpump with platform, drain and soakpit for Muzaffarpur district under P.H. Division Motipur
Last Date of Tender Receiving :-
Estimated Cost:- Rs.4,655,000.00
Earnest Money :- Rs.93,600.00
Time of Completion :- 3 Months
Cost of BOQ :- (including Beltron Processing Fee) Rs.5000.00 Through online Mode.
S.N. Particulars Quantity Unit Rate Amount
1 Construction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain (As per sub BOQ No. 1) 50 Nos. Each 85100.00 4,255,000.00
Construction of soak pit 1.0 m diameter 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc for Handpump (As per sub BOQ No. 2) 50 Nos. Each 8000.00 400,000.00
Total Rs. 4,655,000.00
1 Estimated cost :- Rs.4,655,000.00
2 Name of the Contractor :-
3 Address of the Contractor :-
4 Valid Mobile No.
5 Valid Email ID
6 I/we offer in Figures…………………………... in words……………………………………………… % (Percentage) High / Less/ Estimated rate are mentioned in the Bill of quantity. IN FIG. %
Executive Engineer, P.H. Division,Motipur
Construction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain .
(Materials should confirm to following B.I.S Specifications with latest amendments. Rates are inclusive of (Contractor's Profit & Overheads-15%), Octrai, Royalty, All Taxes, cess etc and FOR anywhere in State of Bihar.
Sl.No. Particulars Qty. Unit Rate Amount
Part 'A' Cost of Materials
1 India mark II hand pump with 8 Nos. Connection Rod and one cylinder confirming IS:15500(Part 1-8)/2008 1 No. Each Rs.12,650.00 Rs.12,650.00
2 125mm dia U.P.V.C. casing pipe confirming to IS:12818-1983/1992 27 M P/M Rs.427.00 Rs.11,529.00
3 32 mm dia G.I. pipe medium quality (3mtr each length) confirming IS:1239(Part 1-4) 24 M P/M Rs.232.00 Rs.5,568.00
4 40mm dia best quality UPVC pipe confirming to IS:12818-1983/1992 30 M Each Rs.80.00 Rs.2,400.00
5 40mm dia X 2 mtr long UPVC RIBEED Strainer confirming to IS:12818-1983/1992 2 Nos. Each Rs.246.00 Rs.492.00
6 125 mm X 40 mm UPVC reducing socket (Heavy quality). 1 No. Each Rs.272.10 Rs.272.10
7 Supplying all labour and material and fitting and fixing G.I. cap over the new skunked T/well 1 No. Each Rs.142.65 Rs.142.65
8 Providing all material and labour and construction 1.85m dia circular PCC (1:2:4) UNICEF design platform with foot rest etc. all complete. 1 No. Each Rs.6,400.00 Rs.6,400.00
9 Providing all material and construction 1 P.C.C. (1:2:4) UNICEF design drain for disposal of water etc. all complete. 3 M P/M Rs.716.00 Rs.2,148.00
TOTAL 'A'--- Rs.41,601.75
Part 'B' labour Cost (Classification of soil item 'B')
1 Boring by jet dheki by suitable cutter or reduce as the case may be lowering 125 mm U.P.V.C. X 40mm dia UPVC pipe & strainer of standard quality iron shoe, plug & shocked etc. all complete including providing all tools and plants required for the job as per specification and direction of the engineer in charge.
(a) For 125 mm dia U.P.V.C. pipe 27.0 M P/M Rs.832.78 Rs.22,485.06
(b) For 40 mm dia UPVC Pipe 3.5 M P/M Rs.474.99 Rs.1,662.47
(a) For 40 mm dia UPVC Pipe 30.5 M P/M Rs.546.20 Rs.16,659.10
2 (a) Supplying all tools for lowering 32mm dia G.I. Pipe 24 M P/M Rs.20.12 Rs.482.88
(c) Fixing I.M. II pump. 1 No. Each Rs.214.40 Rs.214.40
3 Providing labour for fitting and fixing deep well cylinder with necessary connecting rod and drilling flanges including supplying jointing materials, all tools and plants etc, required for the job for low water level all complete as per specification. 1 No. Each Rs.509.70 Rs.509.70
4 Supplying labour and developing the T/Well to have sand free discharge all complete as per direction of E/I 1 No. Each Rs.1,124.70 Rs.1,124.70
5 Transportation of materials & tools from Store to work site and carrying back the surplus materials if any. 1 No. Each Rs.348.90 Rs.348.90
TOTAL 'B'--- Rs.43,487.21
TOTAL 'A' + 'B' = Rs.85,088.96
Cost of One No. I.M. II T/well Say Rs.85,100.00
Executive Engineer
P.H Division, Motipur
Name for the work :- Construction of soak pit 1.0 m diameter 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc for Handpump complete as per detail below
S. N. Particulars Qty. Unit Rate Amount
A Earth work in excavation over areas (exceeding 1.5 in depth, 1.5m in width as well as 10 sqm in plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed.
B 6.1.14B Brick work with bricks of class designation 100 B in foundation and plinth in
Cement mortar 1:6 (1 cement : 6 coarse sand)
Less for honey comb masonary
C 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having sloe up to 15, landing, balconies, shelves, chajjas, lintals, bands, plain windows sills, staircase and spiral stair cases up to floor five level excluding cost of centring, shuttering, finishing with cement concrete 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size)
D 5.22 7A Reinforcement for RCC work including stragihtening, cutting, bending & placing in position and binding all complete.
8 mm to 10mm dia T.M.T. bars 8 Kg. P/Kg. Rs.94.50 Rs.756.000
E providing brick bats 22 mm to 40 mm size for filling soak pit as per approved etc. all complete including carriage of brick bats.
F Carriage of materials.
(a) Bricks ( 7 Km. Pucca & 1 Km Kaccha lead) 287 No. P/%0 Rs.1,139.38 Rs.326.587
(c) Coarse Sand ( 50 Km. lead) 0.27 M3 P/M3 Rs.1,232.94 Rs.332.894
(d) Stone Chips ( 200 Km. lead) 0.11 M3 P/M3 Rs.4,270.38 Rs.471.410
Multiplying Factor for Additional 6% GST= 0.0536 Rs.406.414
Grand Total Say Rs.7,989.020
Cost of One No.Soak Pit Say Rs.8,000.000
Executive Engineer
P.H. Division Motipur
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT NO 042026-2027.pdf
NIT • 1.97 MB
NIT NO 042026-2027-2.pdf
NIT • 1.97 MB
Notes to Tenderers.doc
NIT • 0.09 MB
TechnicalBid Gr-01.xls
NIT • 0.05 MB
Financial BidGr-01.xlsx
NIT • 0.40 MB
Financial BidGr-01-2.xlsx
NIT • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .