Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17.5 Cr
EMD Value
₹34.9 L
Closing Date
30 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WORKS
13 conditions · 2 needing a document upload
As the tender cost is more than 50 lakhs, eligibility criteria is applicable. Also the Bid Capacity will be applicable as per the norms of GCC 2022 with latest amendment.
As the tender cost is more than 50 lakhs, eligibility criteria is applicable. The Similar Type of work is " a) Design, Supply, Installation, Testing & commissioning of EI or EI based Automatic Block Signalling for passenger lines OR b) Alteration, Testing & Commissioning of any existing EI for passenger lines.
3 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The PVC Clause is not applicable for this tender. The Maintenance period will be 12 months from the date of actual completion of work.
Main Consignee of this tender will be SSE(SIG)Nagpur, Executive Incharge:- SR. DSTE/NGP, DSTE(North) Nagpur. Consignee of Bhusawal Division:- SSE(SIG)BSL ; Executive Incharge:- DSTE(South) BSL Consignee of Pune Division:- SSE(SIG)Ghorpuri; SSE(S) Ahilyanagar; Executive Incharge:- DSTE-I/Pune Consignee of Mumbai Division:- SSE(SIG) Lonavala; Executive Incharge:- DSTE/N-1/Kalayan. All other division should submit the measurement duly verified as per the site, duly signed by executive incharge and submit to SSE(SIG)Nagpur for billing purpose.
Signaling work in connection with Alteration in existing HITACHI make EI in connection with provision of modification of points circuits NDKR1/RDKR1 and KAVACH ready interface of Nagpur, Pune, Bhusawal and Mumbai Division.
64-2026-HITACHI-NDKR-RDKR~CR
64-2026-HITACHI-NDKR-RDKR
Open
Works - General
9 Months
Nagpur, Maharashtra
₹0
₹34.9 L
1 Oct 2026
1 Oct 2026
16 Oct 2026
58 items across 3 schedules · ₹12,55,45,803.25 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | MLKII Vital Input PCB 24VDC | Numbers | 48.00 | 1,40,133.73 | 67,26,419.04 |
| 2 | MLKII Vital Output PCB 24VDC | Numbers | 6.00 | 1,28,455.92 | 7,70,735.52 |
| 3 | Address select PCB-48 Pin | Numbers | 37.00 | 8,433.97 | 3,12,056.89 |
| 4 | Address select PCB-96 Pin | Numbers | 25.00 | 11,677.74 | 2,91,943.5 |
| 5 | 48 Pin connector housing assembly | Numbers | 37.00 | 1,433.77 | 53,049.49 |
| 6 | 48 Pin connector guide element | Numbers | 37.00 | 817.45 | 30,245.65 |
| 7 | 96 Pin connector housing assembly | Numbers | 25.00 | 1,544.07 | 38,601.75 |
| 8 | 48 Pin female connector | Numbers | 37.00 | 746.08 | 27,604.96 |
| 9 | 48 Pin female crimp contact | Numbers | 37.00 | 45.42 | 1,680.54 |
| 10 | MLKII Power supply PCB | Numbers | 5.00 | 1,74,805.47 | 8,74,027.35 |
| 11 | CPU EEPROM PCB | Numbers | 5.00 | 11,886.77 | 59,433.85 |
| 12 | MLKII CPU PCB | Numbers | 5.00 | 2,30,743.22 | 11,53,716.1 |
| 13 | 1-wide blank front panel assly. | Numbers | 19.00 | 3,496.11 | 66,426.09 |
| 14 | SYNC PCB (MDSC) | Numbers | 7.00 | 1,88,789.91 | 13,21,529.37 |
| 15 | COMMS PCB | Numbers | 8.00 | 1,94,383.68 | 15,55,069.44 |
| 16 | DC/DC Convertor for MLK II Cardfile/Vital I/O Supply/Non-vital I/O Supply/Isolator Supply | Numbers | 16.00 | 23,506.06 | 3,76,096.96 |
| 17 | Supply of EI equipments/Cards as per RDSO Spec.No. RDSO/SPN/192/2005 with latest amendment and internal wiring. MLK II Split Card files. | Numbers | 3.00 | 2,38,500 | 7,15,500 |
| 18 | Supply of Hardware for Hitachi EI for MLKII Non- Vital I/O PCB 24VDC | Numbers | 1.00 | 1,60,821.03 | 1,60,821.03 |
| 19 | Supply of EI equipments/Cards as per RDSO Spec.No. RDSO/SPN/192/2005 with latest amendment and internal wiring. VCOR relay | Numbers | 1.00 | 1,02,916.8 | 1,02,916.8 |
| 20 | Supply of EI equipments/Cards as per RDSO Spec.No. RDSO/SPN/192/2005 with latest amendment and internal wiring. VCOR relay base. | Numbers | 1.00 | 8,001 | 8,001 |
| 21 | Supply of EI equipments/Cards as per RDSO Spec.No. RDSO/SPN/192/2005 with latest amendment and internal wiring. 96-Pin Connector guide element. | Numbers | 1.00 | 727.2 | 727.2 |
| 22 | Supply of Hardware for Hitachi EI for 96 Pin female Connector | Numbers | 1.00 | 804.11 | 804.11 |
| 23 | Supply of EI equipments/Cards as per RDSO Spec.No. RDSO/SPN/192/2005 with latest amendment and internal wiring. 96-Pin Female crimp contact. | Numbers | 1.00 | 24.3 | 24.3 |
| 24 | Supply of Relay Rack 120 ways for Hitachi Make EI | Numbers | 5.00 | 71,364.4 | 3,56,822 |
| 25 | Industrial grade PC for operator VDU -55 inch as perRDSO TAN - STS/E/TAN/3007 Version: 1.0 | Numbers | 3.00 | 6,63,200 | 19,89,600 |
| 26 | Supply of professional LED VDU monitor of display size 42 inch. | Numbers | 3.00 | 66,392.17 | 1,99,176.51 |
| 27 | Microlok II Rack | Numbers | 1.00 | 98,573.8 | 98,573.8 |
| Schedule total | ₹1,72,91,603.25 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
64-2026-NDKR-RDKR01.10.261.pdf
ATTACHMENT
GCC with all correction slips
ATTACHMENT
GCC_April-2022_With_All_Correction_SlipsACS12.pdf
ATTACHMENT
64-2026-NDKR-RDKR01.10.261.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .