Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹93.0 LAccepted-AOC GAYATRI NAGAR BYPASS ROAD SUDNA DALTONGANJ PALAMU | PALAMU | JHARKHAND | 822101 | ₹93.0 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹93.3 LRejected-Finance | ₹93.3 L | L-2 | Rejected-Finance L-2 |
Tender Value
₹93.3 L
EMD Value
₹1.9 L
Closing Date
20 Mar 2026, 5:00 pmClosed
Exe Eng,Mechanical Div Mandal Latehar Camp-Medini
Exe Eng, Mechanical Division Mandal Latehar Camp-Medininagar
Fabrication and erection of New Gates (Emergency and Service Gate) Embedded Parts, Hoisting Arrangement, Shed and Platform of Bai Banki Reservoir Scheme
2026_WRD_110968_1
wrd/mdmandal/ 04/2025-26Dated 05.03.2026
Open Tender
Miscellaneous Works
Percentage
210 days
Block Nagar Untari, Garhwa Distt.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.9 L
19 May 2026
9 Mar 2026
23 Mar 2026
9 Mar 2026
20 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of gate groove by removal of sand, mud, boulders, etc. of emergency and service gate 0F BAI BANKI RESERVOIR SCHEME as per specification & direction of E/I. | 4 | Each | 9,649.96 | ₹38,599.84 |
| 2 | Extraction of gate from gate groove by dismantling old and worn out Emergency and service gate of BAI BANKI RESERVOIR SCHEME as per direction of E/I. | 4 | Each | 33,698 | ₹1,34,792 |
| 3 | Dismantling of P.C.C./R.C.C. of embedded part, bottom seal , of Emergency and Service gate, hoist beam of hoisting platform and trash rack of BAI BANKI RESERVOIR SCHEME as per direction of E/I. | 4.78 | Per m3 | 1,975.85 | ₹9,448.51 |
| 4 | Providing and laying of P.C.C./R.C.C M -20 with nominal mix (1:1.5:3) for emergency and service gate of embedded parts, top seal ,bottom seal, hoist bridge, trash rack etc as per specification and direction of E/I.(SOR RCD, page no-477, item no-12.08(C)case-ii) | 4.78 | Per m3 | 4,499.7 | ₹21,517.57 |
| 5 | Fabrication, Erection, manufacturing of Emergency and Service gate , embedded parts, bottom seal ,top seal and rubber seal with all cost of material, all complete job as per specification and direction of E/I. | 4 | Each | 5,49,934 | ₹21,99,736 |
| 6 | Fabrication and erection of Hoist Bridge hoisting support beam, plate operating platform and service Platform of the well as per direction and specification of E/I. | 2 | Each | 7,23,444 | ₹14,46,888 |
| 7 | Fabrication and erection of shed of the operating platform of well gate as per direction and specification of E/I. | 2 | Each | 5,49,921 | ₹10,99,842 |
| 8 | Fabrication and erection of Ladder of the well as per direction and specification of E/I | 2 | Each | 2,15,195 | ₹4,30,390 |
| 9 | Manufacturing fitting and fixing of worm gear and worm shaft screw hoist system all complete job including cost of worm gear made up of C.I with phosphorous bronze nut worm shaft ,heavy duty lower and upper thrust ball bearing and housing cover to be fabricated 16mm thick M.S plate etc. for service and emergency gate all complete job as per specification and direction of E/I. | 4 | Each | 3,95,658 | ₹15,82,632 |
| 10 | Fabrication, fitting and fixing of trash rack as per direction of E/I. (SIZE=1.5MX1.5M) | 2 | Each | 61,179 | ₹1,22,358 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_149956.xls
BOQ • 0.30 MB
nittenderdocuments.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].