Office of the Sulthanabad Municipality, Dist: Peddapalli
Supply and Fixing of MS Stair case ladder to poosala ELSR Tank in sulthanabad municipality.
704730
E1/SLTB/05/2026-27/2026/02
OPEN
Civil Works
PEDDAPALLI
8 documents required · 6 mandatory · 2 optional
₹57
₹1,600
3 Jun 2026
3 Jun 2026
3 Jun 2026
Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.
BLD-CSTN-2-8 (16) : Filling with quarry rubbish in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
BLD-CSTN-3-2 (22) Providing PCC Grade M10 (1:4:8) concrete using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work complete as per drawings and technical specifications as directed by the Engineer in Charge.
BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted
BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)
Supply ,fabrication erection & fixing in position of MS tubular trusses,including cost and conveyance of all material and all labour charges etc complete for finished item of work as per the standard specifications for ladder fabrication for OHSR tanks
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
STAIR CASE BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
stair case bid doc.docx
TENDER_DOCUMENT • 0.32 MB
Download all tender documents and submit your bid